{"id":34733,"date":"2014-12-24T09:54:19","date_gmt":"2014-12-24T06:54:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34733"},"modified":"2014-12-24T09:54:19","modified_gmt":"2014-12-24T06:54:19","slug":"tanap-projesi-insaatini-gerceklestirecek-firmalar-belirlendi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/tanap-projesi-insaatini-gerceklestirecek-firmalar-belirlendi\/","title":{"rendered":"(Turkish) TANAP Projesi \u0130n\u015faat\u0131n\u0131 Ger\u00e7ekle\u015ftirecek Firmalar Belirlendi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34733\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Trans Anadolu Do\u011fal Gaz Boru Hatt\u0131 (TANAP) ihalesi yava\u015f yava\u015f \u015fekilleniyor. Projenin T\u00fcrkiye taraf\u0131ndaki in\u015faat i\u015flerini \u00fcstlenecek firma ve konsorsiyumlar\u0131n baz\u0131lar\u0131 belli oldu.<\/strong><\/p>\n<p style=\"color: #000000;\">Azerbaycan\u2019daki \u015eahdeniz II sahas\u0131ndan \u00e7\u0131kar\u0131lacak do\u011falgaz\u0131 T\u00fcrkiye \u00fczerinden Avrupa\u2019ya ta\u015f\u0131yacak Trans Anadolu Do\u011falgaz Boru Hatt\u0131 Projesi\u2019nin (TANAP) <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/tanap-dogalgaz-boru-hatti-projesi-firmalar.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-34735\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/tanap-dogalgaz-boru-hatti-projesi-firmalar-300x206.jpg\" alt=\"tanap-dogalgaz-boru-hatti-projesi-firmalar\" width=\"300\" height=\"218\" \/><\/a>kara kesimi boru hatt\u0131 in\u015faat\u0131n\u0131 ger\u00e7ekle\u015ftirecek firmalar belirlendi.<span id=\"more-69277\"><\/span><\/p>\n<p style=\"color: #000000;\">TANAP Do\u011falgaz \u0130leti\u015fim A\u015e taraf\u0131ndan a\u00e7\u0131lan 56 in\u00e7 Kara Kesimi Lot 1, Lot 2, Lot 3 boru hatt\u0131 in\u015faat ihalesi sonucunda, Lot 1 i\u00e7in Fernas \u0130n\u015faat, Lot 2 i\u00e7in Sicim-Y\u00fcksel-Akkord ortakl\u0131\u011f\u0131 ve Lot 3 i\u00e7in Tekfen Holding\u2019in ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Tekfen \u0130n\u015faat ile s\u00f6zle\u015fme imzaland\u0131. Tekfen Holding\u2019in KAP\u2019a yapt\u0131\u011f\u0131 a\u00e7\u0131klamaya g\u00f6re Tekfen \u0130n\u015faat 509 kilometre uzunlu\u011fundaki Lot 3\u2032\u00fcn in\u015faat\u0131n\u0131 565 milyon dolar bedel kar\u015f\u0131l\u0131\u011f\u0131 yapmak i\u00e7in anla\u015ft\u0131.<\/p>\n<p style=\"color: #000000;\">A\u00e7\u0131klamada i\u015fin 36 ayda tamamlanmas\u0131n\u0131n beklendi\u011fi ifade edildi. 26 Aral\u0131k 2011\u2032de mutabakat zapt\u0131n\u0131n ve 26 Haziran 2012\u2032de H\u00fck\u00fcmetleraras\u0131 Anla\u015fma ve eki Ev Sahibi H\u00fck\u00fcmet Anla\u015fmas\u0131n\u0131n imzaland\u0131\u011f\u0131 TANAP projesi kapsam\u0131nda ilk gaz ak\u0131\u015f\u0131n\u0131n 2018\u2032de ger\u00e7ekle\u015fmesi bekleniyor ve ba\u015flang\u0131\u00e7 i\u00e7in y\u0131ll\u0131k 16 milyar metrek\u00fcpl\u00fck ta\u015f\u0131ma kapasitesi hedefleniyor.<\/p>\n<p style=\"color: #000000;\">Tekfen \u0130n\u015faat\u2019\u0131n verdi\u011fi rakamlara g\u00f6re, \u015firketin \u00fcstlendi\u011fi b\u00f6l\u00fcm\u00fcn kilometre ba\u015f\u0131na bedeli 1 milyon 110 bin dolara denk geliyor. 1334 kilometrelik b\u00f6l\u00fcm\u00fcn tamam\u0131n\u0131n bu seviyedeki kilometre ba\u015f\u0131 bedelle in\u015faa edilece\u011fini varsayarsak, ortaya 1 milyar 480 milyon dolarl\u0131k bir bedel \u00e7\u0131k\u0131yor.<\/p>\n<p style=\"color: #000000;\">Sivas\u2019\u0131n do\u011fusunda kalan b\u00f6l\u00fcmde arazi \u015fartlar\u0131n\u0131n daha a\u011f\u0131r oldu\u011fu hesaplan\u0131rsa, 1334 kilometrelik b\u00f6l\u00fcm\u00fcn maliyetinin 1.5 milyar dolar\u0131 a\u015fmas\u0131n\u0131n \u015fa\u015f\u0131rt\u0131c\u0131 olmayaca\u011f\u0131 belirtiliyor.<\/p>\n<h4 style=\"color: #232323;\">Lot 1: FERNAS \u0130N\u015eAAT A.\u015e.<\/h4>\n<p style=\"color: #000000;\">Km 0 \u2013 Km 375: Ardahan\/Posof\/T\u00fcrkg\u00f6z\u00fc \u2013 Erzurum\/A\u015fkale (375 km)<\/p>\n<h4 style=\"color: #232323;\">Lot 2: S\u0130C\u0130M-Y\u00dcKSEL-AKKORD AD\u0130 ORTAKLI\u011eI<\/h4>\n<p style=\"color: #000000;\">Km 375 -Km 825: Erzurum\/A\u015fkale \u2013Sivas\/Y\u0131ld\u0131zeli (450 km)<\/p>\n<h4 style=\"color: #232323;\">Lot 3: TEKFEN \u0130N\u015eAAT ve TES\u0130SAT A.\u015e.<\/h4>\n<p style=\"color: #000000;\">Km 825 \u2013 Km 1334: Sivas\/Y\u0131ld\u0131zeli \u2013Eski\u015fehir\/Seyitgazi (509 km)<\/p>\n<p style=\"color: #000000;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Trans Anadolu Do\u011fal Gaz Boru Hatt\u0131 (TANAP) ihalesi yava\u015f yava\u015f \u015fekilleniyor. Projenin T\u00fcrkiye taraf\u0131ndaki in\u015faat i\u015flerini \u00fcstlenecek firma ve konsorsiyumlar\u0131n baz\u0131lar\u0131 belli [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34735,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[63,3136,2297,20370,20371,20372,14377,20373,20374,3502],"views":1622,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34733"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34733"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34733\/revisions"}],"predecessor-version":[{"id":34736,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34733\/revisions\/34736"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34735"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34733"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34733"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34733"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}