{"id":34560,"date":"2014-12-17T17:38:07","date_gmt":"2014-12-17T14:38:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34560"},"modified":"2014-12-17T17:38:07","modified_gmt":"2014-12-17T14:38:07","slug":"orhaneli-ve-tuncbilek-santralleri-ihalesini-521-milyon-dolarla-celikler-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/orhaneli-ve-tuncbilek-santralleri-ihalesini-521-milyon-dolarla-celikler-aldi\/","title":{"rendered":"(Turkish) Orhaneli ve Tun\u00e7bilek Santralleri \u0130halesini 521 Milyon Dolarla \u00c7elikler Ald\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34560\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #000000;\"><strong>Orhaneli ve Tun\u00e7bilek termik santralleri ile Bursa Linyitleri i\u015fletmesi taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirme ihalesinde, en y\u00fcksek teklifi 521 milyon dolarla \u00c7elikler Taahh\u00fct \u0130n\u015faat ve Sanayi A\u015e verdi.<\/strong><span id=\"more-69165\"><\/span><\/p>\n<p style=\"color: #000000;\">\u00d6zelle\u015ftirme \u0130daresinde, ilk olarak kapal\u0131 elemesiz teklifler al\u0131nd\u0131. Elemesiz turda verilen en y\u00fcksek teklif 160 milyon dolar olurken, daha sonra iki elemeli tur <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/orhaneli-tuncbilek-termik-santrali-ozellestirme-ihalesi-celikler.jpg\"><img loading=\"lazy\" class=\"alignleft  wp-image-34561\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/orhaneli-tuncbilek-termik-santrali-ozellestirme-ihalesi-celikler-300x167.jpg\" alt=\"orhaneli-tuncbilek-termik-santrali-ozellestirme-ihalesi-celikler\" width=\"300\" height=\"192\" \/><\/a>ger\u00e7ekle\u015ftirildi.<\/p>\n<p style=\"color: #000000;\">Bereket Enerji \u00dcretim A\u015e, elemeli turlar\u0131n ilkinde en d\u00fc\u015f\u00fck teklifi vererek ihaleden elenirken, ikinci turda elenen firma ise Alsim Alarko Sanayi Tesisleri ve Ticaret A\u015e oldu.<\/p>\n<p style=\"color: #000000;\">A\u00e7\u0131k art\u0131rmada ba\u015flang\u0131\u00e7 tutar\u0131 463 milyon 800 bin dolar, art\u0131r\u0131m aral\u0131\u011f\u0131 ise 100 bin dolar olarak belirlendi. A\u00e7\u0131k artt\u0131rma, Konya \u015eeker Sanayi ve Ticaret A\u015e ve \u00c7elikler Taahh\u00fct \u0130n\u015faat ve Sanayi A\u015e aras\u0131nda devam etti. Konya \u015eeker Sanayi ve Ticaret A\u015e, birka\u00e7 tur sonra ihaleden \u00e7ekildi.<\/p>\n<p style=\"color: #000000;\">B\u00f6ylece yakla\u015f\u0131k 30 dakika s\u00fcren ihalede, en y\u00fcksek teklifi 521 milyon dolarla \u00c7elikler Taahh\u00fct \u0130n\u015faat ve Sanayi A\u015e vermi\u015f oldu.<\/p>\n<p style=\"color: #000000;\">SEY\u0130T\u00d6MER\u2019E 2,2 M\u0130LYAR DOLAR VERM\u0130\u015eT\u0130 \u00c7elikler Taahh\u00fct 2012 sonunda d\u00fczenlenen Seyit\u00f6mer Termik Santral ihalesini de 2,2 milyar dolar teklifi ile kazanm\u0131\u015ft\u0131.<\/p>\n<blockquote style=\"color: #000000;\">\n<h3 style=\"color: #232323;\" align=\"left\">\u00d6\u0130B Duyurusu:<\/h3>\n<p align=\"left\">Elektrik \u00dcretim A.\u015e.\u2019ye ait Orhaneli ve Tun\u00e7bilek Termik Santrallerinin, Soma Elektrik \u00dcretim ve Ticaret A.\u015e. (SEA\u015e)\u2019ye ait Bursa Linyitleri \u0130\u015fletmesi (BL\u0130) taraf\u0131ndan kullan\u0131lan ta\u015f\u0131n\u0131rlar\u0131n, Orhaneli ve Tun\u00e7bilek Termik Santralleri ile BL\u0130 taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131n \u201cVarl\u0131k Sat\u0131\u015f\u0131\u201d; 79528 ve 73021 No.lu Maden Ruhsatlar\u0131 ve bu Ruhsatlar\u0131n kapsad\u0131\u011f\u0131 Maden Sahalar\u0131n\u0131n \u201c\u0130\u015fletme Hakk\u0131n\u0131n Verilmesi\u201d y\u00f6ntemi ile bir b\u00fct\u00fcn halinde\u00a0 \u00f6zelle\u015ftirme\u00a0 ihalesi nihai pazarl\u0131k g\u00f6r\u00fc\u015fmesi tamamland\u0131.<\/p>\n<p align=\"left\">17.12.2014 tarihlerinde yap\u0131lan \u00f6zelle\u015ftirme ihalesi nihai pazarl\u0131k g\u00f6r\u00fc\u015fmesinde en y\u00fcksek teklif\u00a0<b><span lang=\"EN-US\">\u00a0521.000.000-ABD Dolar\u0131\u00a0<\/span><\/b>ile \u00c7elikler Taahh\u00fct \u0130n\u015faat ve Sanayi A.\u015e. taraf\u0131ndan verilmi\u015ftir.<\/p>\n<p align=\"left\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p>&nbsp;<\/p><\/blockquote>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Orhaneli ve Tun\u00e7bilek termik santralleri ile Bursa Linyitleri i\u015fletmesi taraf\u0131ndan kullan\u0131lan ta\u015f\u0131nmazlar\u0131n \u00f6zelle\u015ftirme ihalesinde, en y\u00fcksek teklifi 521 milyon dolarla \u00c7elikler Taahh\u00fct [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34561,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[20118,18317,20238,9118,63,3136,1009,1954,20122,20239,1248,2998,18318,18320,2262],"views":1243,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34560"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34560"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34560\/revisions"}],"predecessor-version":[{"id":34562,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34560\/revisions\/34562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34561"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34560"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34560"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34560"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}