{"id":34373,"date":"2014-12-12T11:44:11","date_gmt":"2014-12-12T08:44:11","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34373"},"modified":"2014-12-12T11:44:46","modified_gmt":"2014-12-12T08:44:46","slug":"enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi\/","title":{"rendered":"(Turkish) Enka \u0130n\u015faat, Bismayah Do\u011falgaz Santrali \u0130\u00e7in S\u00f6zle\u015fme \u0130mzalad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34373\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #3c3c3c;\"><strong>Irak\u2019ta Bismayah Do\u011falgaz Kombine \u00c7evrim Santrali\u2019nin anahtar teslim yap\u0131m\u0131 ve i\u015fletmeci personelin e\u011fitimi i\u00e7in Mass Group ile s\u00f6zle\u015fme imzaland\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-34374\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi-300x203.jpg\" alt=\"enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi-300x203.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi-500x338.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi.jpg 590w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><span id=\"more-69008\"><\/span><\/p>\n<p style=\"color: #3c3c3c;\">Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, 18 Kas\u0131m\u2019dan bu yana 2,6 milyon varillik Irak Milli Petrol \u015eirketi (SOMO) petrol\u00fcn\u00fcn Ceyhan\u2019dan uluslararas\u0131 piyasaya sevk edildi\u011fini, bunun 520 bin varillik k\u0131sm\u0131n\u0131n da T\u00fcrkiye Petrol Rafinerileri A\u015e (T\u00dcPRA\u015e) taraf\u0131ndan al\u0131nd\u0131\u011f\u0131n\u0131 s\u00f6yledi.<\/p>\n<p style=\"color: #3c3c3c;\">Enka \u0130n\u015faat ve Sanayi A\u015e\u2019nin, Ba\u011fdat\u2019ta in\u015fa edilecek 3 bin megavat kapasiteli Bismayah Do\u011falgaz Kombine \u00c7evrim Santrali\u2019nin anahtar teslim yap\u0131m\u0131 ve i\u015fletmeci personelin e\u011fitimi i\u00e7in Irakl\u0131 yat\u0131r\u0131mc\u0131 firma Mass Group ile yapt\u0131\u011f\u0131 s\u00f6zle\u015fmenin imza t\u00f6reni, Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z ile Irak Elektrik Bakan\u0131 Kas\u0131m El Fehdavi\u2019nin kat\u0131l\u0131m\u0131yla ger\u00e7ekle\u015ftirildi.<\/p>\n<p style=\"color: #3c3c3c;\">Y\u0131ld\u0131z, t\u00f6rendeki konu\u015fmas\u0131nda, Enka ve Mass Group\u2019u i\u015f birliklerinden dolay\u0131 kutlad\u0131. Enka\u2019n\u0131n, T\u00fcrkiye\u2019nin kurulu g\u00fcc\u00fcne hem anahtar teslim hem de yap-i\u015flet modeliyle yapt\u0131\u011f\u0131 \u00f6nemli yat\u0131r\u0131mlar\u0131n, uluslararas\u0131 arenada da bu i\u015fi yapabileceklerini g\u00f6sterdi\u011fini ifade eden Y\u0131ld\u0131z, T\u00fcrk yat\u0131r\u0131mc\u0131lar\u0131n T\u00fcrkmenistan\u2019da yapt\u0131klar\u0131ndan daha fazla yat\u0131r\u0131m\u0131 Irak\u2019ta yapabilece\u011fini belirtti.<\/p>\n<p style=\"color: #3c3c3c;\">Y\u0131ld\u0131z, \u201cHem T\u00fcrkmenistan\u2019da hem de Irak\u2019ta yat\u0131r\u0131m yapabilecek kabiliyet, kapasite ve finansman a\u00e7\u0131s\u0131ndan geni\u015f montanl\u0131 firmalar olu\u015ftu. O y\u00fczden hem T\u00fcrkmenistan\u2019da hem de Irak\u2019ta in\u015fallah fazlas\u0131yla bunlar\u0131 yapabilece\u011fiz. \u00c7\u00fcnk\u00fc bizim Irak\u2019la hukukumuz farkl\u0131 bir hukuk. Biz hem karde\u015fiz hem kom\u015fuyuz hem de tarihi birlikteli\u011fimiz var. Zaman zaman devletlerin, siyasi iradelerin bir k\u0131s\u0131m dalgalanmalar\u0131 olur. Ne olursa olsun yeni i\u015fler yapmak i\u00e7in beraber uzla\u015f\u0131, sinerji ve istikrar olu\u015fturmak i\u00e7in gayret etmeliyiz\u201d diye konu\u015ftu.<\/p>\n<p style=\"color: #3c3c3c;\">Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/12\/12\/enka-insaat-bismayah-dogalgaz-santrali-icin-mass-group-ile-sozlesme-imzalandi\/\" target=\"_blank\" rel=\"nofollow\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. Irak\u2019ta Bismayah Do\u011falgaz Kombine \u00c7evrim Santrali\u2019nin anahtar teslim yap\u0131m\u0131 ve i\u015fletmeci personelin e\u011fitimi i\u00e7in Mass Group ile s\u00f6zle\u015fme imzaland\u0131. Enerji ve Tabii [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34374,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[20131,20132,92,226,68,63,67,1009,165,5236,13509,945,20133,12176,1000,5345],"views":1572,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34373"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34373"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34373\/revisions"}],"predecessor-version":[{"id":34376,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34373\/revisions\/34376"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34374"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34373"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34373"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34373"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}