{"id":34226,"date":"2014-12-07T16:33:47","date_gmt":"2014-12-07T13:33:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34226"},"modified":"2014-12-07T16:33:47","modified_gmt":"2014-12-07T13:33:47","slug":"fransadan-ruzgara-150-milyon-euroluk-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/fransadan-ruzgara-150-milyon-euroluk-yatirim\/","title":{"rendered":"(Turkish) Fransa`dan R\u00fczgara 150 Milyon Euro`luk Yat\u0131r\u0131m&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34226\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Fransa \u00f6n\u00fcm\u00fczdeki y\u0131l Haziran ay\u0131nda kuraca\u011f\u0131 y\u00fczer r\u00fczgar santrali pilot projesi i\u00e7in 150 milyon Euro`luk yat\u0131r\u0131m yapaca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/fransadan-ruzgara-150-milyon-euroluk-yatirim.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-34227\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/fransadan-ruzgara-150-milyon-euroluk-yatirim-300x185.jpg\" alt=\"fransadan-ruzgara-150-milyon-euroluk-yatirim\" width=\"300\" height=\"185\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/fransadan-ruzgara-150-milyon-euroluk-yatirim-300x185.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/fransadan-ruzgara-150-milyon-euroluk-yatirim-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/fransadan-ruzgara-150-milyon-euroluk-yatirim.jpg 439w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Fransa Ba\u015fbakan\u0131 Manuel Valls d\u00fcn yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, Fransa`n\u0131n \u00f6n\u00fcm\u00fczdeki Haziran ay\u0131 i\u00e7in y\u00fczer r\u00fczgar t\u00fcrbinleri pilot projesi i\u00e7in yat\u0131r\u0131m \u00e7a\u011f\u0131r\u0131s\u0131 yapt\u0131. 2 MW r\u00fczgar t\u00fcrbinlerini tasarimi icin 150 milyon Euro finansman\u0131n gerekli teknolojiyi destekleyece\u011fi d\u00fc\u015f\u00fcn\u00fcl\u00fcyor.<\/p>\n<p>Fransa i\u00e7in bu hem yeni i\u015f istihdam\u0131 yaratmak, hem detek alternatif olarak kalan a\u00e7\u0131k denizlerin de\u011ferlendirilmesi anlam\u0131na geliyor.<\/p>\n<p>Frans\u0131z tasar\u0131mc\u0131lar bir s\u00fcredir \u00f6n\u00fcm\u00fczdeki y\u0131llarda kurulmas\u0131 d\u00fc\u015f\u00fcn\u00fclen y\u00fczer t\u00fcrbinler \u00fczerinde \u00e7al\u0131\u015f\u0131yorlard\u0131. Bunlardan biri Ideol \u015firketinin gelecek yaz kurmay\u0131 planlad\u0131\u011f\u0131 2 MW`l\u0131k Gamesa t\u00fcrbinleri iken di\u011feri de N\u00e9nuphar ve EDF Energies Nouvelles`\u0131n2017 y\u0131l\u0131nda haz\u0131r etmeyi planlad\u0131\u011f\u0131 2 MW`l\u0131k dikey eksen Vertiwind t\u00fcrbinleri.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/fransadan-ruzgara-150-milyon-euroluk-yatirim_11158.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Fransa \u00f6n\u00fcm\u00fczdeki y\u0131l Haziran ay\u0131nda kuraca\u011f\u0131 y\u00fczer r\u00fczgar santrali pilot projesi i\u00e7in 150 milyon Euro`luk yat\u0131r\u0131m yapaca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131. Fransa Ba\u015fbakan\u0131 Manuel Valls d\u00fcn [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34227,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[63,67,1009,165,1346,20030,474,69,16,231,4130,1286,20029],"views":658,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34226"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34226"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34226\/revisions"}],"predecessor-version":[{"id":34228,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34226\/revisions\/34228"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34227"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34226"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34226"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34226"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}