{"id":34016,"date":"2014-12-01T14:20:51","date_gmt":"2014-12-01T11:20:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=34016"},"modified":"2014-12-01T16:39:47","modified_gmt":"2014-12-01T13:39:47","slug":"lisanssiz-elektrik-uretiminde-onaylanan-proje-sayisi-bini-asti-tedas-personeli-artirdi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrik-uretiminde-onaylanan-proje-sayisi-bini-asti-tedas-personeli-artirdi\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrik \u00dcretiminde Onaylanan Proje Say\u0131s\u0131 Bini A\u015ft\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/34016\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><\/p>\n<p style=\"color: #3c3c3c;\"><strong>T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m Anonim \u015eirketi (TEDA\u015e) Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Genel M\u00fcd\u00fcr\u00fc M\u00fckremin \u00c7epni, lisanss\u0131z elektrik \u00fcretiminde\u00a0proje onay\u0131 yap\u0131lan ba\u015fvuru say\u0131s\u0131n\u0131n bin 2 oldu\u011funu a\u00e7\u0131klad\u0131.<\/strong><span id=\"more-68521\"><\/span><\/p>\n<p style=\"color: #3c3c3c;\">TEDA\u015e Genel M\u00fcd\u00fcr\u00fc M\u00fckremin \u00c7epni, yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, g\u00fcne\u015f enerjisi konusunda umut olan TEDA\u015e, 2012 y\u0131l\u0131nda elektrik yasas\u0131nda lisanss\u0131z elektrik \u00fcretimi i\u00e7in proje yapma, onay ve kabul i\u015flemleri yapmak \u00fczere g\u00f6revlendirildi. Enerji bakanl\u0131\u011f\u0131, EPDK ve Yenilenebilir Enerji Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcm\u00fcz gibi di\u011fer <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-34017\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas-300x197.jpg\" alt=\"lisanssiz-elektrik-uretimi-tedas\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/12\/lisanssiz-elektrik-uretimi-tedas.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>payda\u015flar\u0131m\u0131zla mevzuat\u0131n haz\u0131rlanmas\u0131 akabinde genel m\u00fcd\u00fcrl\u00fc\u011f\u00fcm\u00fcz 2 Ekim 2012 tarihinden itibaren proje onay\u0131na ve kabullere ba\u015flad\u0131. Lisanss\u0131z \u00fcretim bir y\u0131ll\u0131k ge\u00e7mi\u015fi olan bir s\u00fcre\u00e7te ilerliyor. Ba\u015flang\u0131\u00e7ta toplam 4 realistle proje onay\u0131na ba\u015flad\u0131\u011f\u0131m\u0131z s\u00fcre\u00e7 \u015fu an ge\u00e7en hafta 7 ihale ile 34 realiste ula\u015ft\u0131. Statik \u00f6zellik ve kontrollerdeki yo\u011funluk nedeniyle 3 in\u015faat m\u00fchendisini 6\u2019ya \u00e7\u0131kartarak proje onaylar\u0131n\u0131 devam ettiriyoruz. 21 da\u011f\u0131t\u0131m b\u00f6lgesinde b\u00f6lge koordinat\u00f6rl\u00fcklerdeki personelimize e\u011fitim vererek 30 kilovat alt\u0131na kadar yetkilendirdik. B\u00f6lge koordinat\u00f6rlerimiz onaylamak ve ge\u00e7ici yetki belgesi verdik. 30 kilovat alt\u0131 i\u00e7in iki proje haz\u0131rlad\u0131k. Bunu vatanda\u015f\u0131m\u0131za 30 kilovat alt\u0131ndaki proje ile u\u011fra\u015fmayarak i\u015fini kolayla\u015ft\u0131rmak amac\u0131yla yapt\u0131k.\u201d<\/p>\n<p style=\"color: #3c3c3c;\">G\u00fcne\u015fte 898 proje onay i\u00e7in genel m\u00fcd\u00fcrl\u00fc\u011fe geldi\u011fini a\u00e7\u0131klad\u0131. \u00c7epni, \u201cBunun g\u00fcc\u00fc ise 622 megavat. Bu projelerden 283 tanesi onayland\u0131. Yani 160 megavat\u0131 onayland\u0131. Bir k\u0131sm\u0131 eksikliklerden dolay\u0131 ihale edilenler var. Onay s\u0131ras\u0131nda olanlar var. 94 tanesi i\u015fletmeye a\u00e7\u0131ld\u0131. Toplam devriye al\u0131nan g\u00fcne\u015f enerjisi santrali 30 megavata ula\u015ft\u0131. Yenilenebilir enerjideki di\u011fer kaynaklarla birlikte devriye al\u0131nm\u0131\u015f kurulu g\u00fc\u00e7 41 megavat\u0131 a\u015ft\u0131. Hali haz\u0131rda da 25 megavat ge\u00e7ici kabul\u00fc yap\u0131lm\u0131\u015f projeler var. Bug\u00fcn yar\u0131n devriye girecek g\u00fc\u00e7 var. Yak\u0131n tarihte 65, y\u0131l sonunu kadar 100 megavat\u0131 devriye alm\u0131\u015f olaca\u011f\u0131z.\u201d diye konu\u015ftu.<\/p>\n<h3 style=\"color: #232323;\">Belediyelerin \u0130mar Uygulamalar\u0131ndan\u00a0Sekt\u00f6r S\u0131k\u0131nt\u0131l\u0131<\/h3>\n<p style=\"color: #3c3c3c;\">M\u00fckremin \u00c7epni, TEDA\u015e\u2019taki kabul a\u015famas\u0131nda ciddi yo\u011funluk oldu\u011funu anlatarak, bu nedenle personel say\u0131s\u0131n\u0131n artt\u0131\u011f\u0131n\u0131 ifade etti. \u00c7epni, \u201cGe\u00e7mi\u015fi bir y\u0131l olan ve toplam 1000 projenin geldi\u011fini d\u00fc\u015f\u00fcn\u00fcrsek bu rakam olduk\u00e7a fazlad\u0131r. 4 personel ile ba\u015flad\u0131\u011f\u0131m\u0131z i\u015flemlerde 34 personelle hizmete devam ediyoruz. E\u011fitimlerini art\u0131rd\u0131k. Bu say\u0131y\u0131 da art\u0131r\u0131yoruz. Yo\u011funlu\u011fu azaltmaya \u00e7al\u0131\u015f\u0131yoruz. Sekt\u00f6rdeki \u015firketlerin s\u00fcreden kaynaklanan bir s\u0131k\u0131nt\u0131s\u0131n\u0131n ba\u015fvurusunun geri \u00e7evrilmemesi i\u00e7in \u00e7al\u0131\u015f\u0131yoruz.\u201d dedi.\u00a0\u00c7epni, sekt\u00f6rdeki firmalar\u0131n, belediyelerin imar uygulamas\u0131ndaki gecikmelerden ve uygulad\u0131klar\u0131 y\u00f6ntemlerden dolay\u0131 da olduk\u00e7a s\u0131k\u0131nt\u0131l\u0131 olduklar\u0131n\u0131 dile getirdi.<\/p>\n<h3 style=\"color: #232323;\">Standartlar\u0131n\u0131n Uygulanmas\u0131nda S\u0131k\u0131nt\u0131 Var<\/h3>\n<p style=\"color: #3c3c3c;\">TSE\u2019nin de yard\u0131mda bulunmas\u0131n\u0131 isteyen \u00c7epni, \u201cKullan\u0131lan te\u00e7hizatlardaki panel ve benzeri malzemelerin standartlar\u0131n\u0131n uygulanmas\u0131nda s\u0131k\u0131nt\u0131 var. T\u00fcrk Standartlar\u0131 Enstit\u00fcn\u00fcn de bu konuya el atmas\u0131 gerekiyor. \u00dclkemizin 20 bin megavatl\u0131k g\u00fcne\u015f enerjisi \u00fcretim kapasite d\u00fc\u015f\u00fcn\u00fcld\u00fc\u011f\u00fcnde TSE\u2019nin yerli \u00fcretimdeki katk\u0131s\u0131 b\u00fcy\u00fck olacakt\u0131r.\u201d \u015feklinde konu\u015ftu.<\/p>\n<p style=\"color: #3c3c3c;\">Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language. T\u00fcrkiye Elektrik Da\u011f\u0131t\u0131m Anonim \u015eirketi (TEDA\u015e) Y\u00f6netim Kurulu Ba\u015fkan\u0131 ve Genel M\u00fcd\u00fcr\u00fc M\u00fckremin \u00c7epni, lisanss\u0131z elektrik \u00fcretiminde\u00a0proje onay\u0131 yap\u0131lan ba\u015fvuru say\u0131s\u0131n\u0131n bin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":34017,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[259,19886,19887,2282,19888,19889,19890,5682,19891,19892],"views":744,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34016"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=34016"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34016\/revisions"}],"predecessor-version":[{"id":34030,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/34016\/revisions\/34030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/34017"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=34016"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=34016"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=34016"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}