{"id":3378,"date":"2012-11-12T10:29:34","date_gmt":"2012-11-12T07:29:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=3378"},"modified":"2012-11-12T13:15:14","modified_gmt":"2012-11-12T10:15:14","slug":"asrin-enerji-projesi-desertec-halen-emekleme-safhasini","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/asrin-enerji-projesi-desertec-halen-emekleme-safhasini\/","title":{"rendered":"(Turkish) Asr\u0131n Enerji Projesi DESERTEC Halen Emekleme Safhas\u0131nda"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/3378\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Afrika \u00e7\u00f6llerinin g\u00fcne\u015f ve r\u00fczg\u00e2r enerjisini elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcp Avrupa\u2019ya nakletme d\u00fc\u015f\u00fcncesi \u00e7etin engellerle kar\u015f\u0131la\u015f\u0131yor. DESERTEC Sanayi Giri\u015fimi emekleme safhas\u0131n\u0131 geride b\u0131rakamad\u0131.<\/strong><\/p>\n<div>\n<p><img loading=\"lazy\" class=\"alignleft size-medium wp-image-3379\" title=\"desertec-projesi-gunes-enerjisi-col-512x247\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/desertec-projesi-gunes-enerjisi-col-512x247-300x144.jpg\" alt=\"\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/desertec-projesi-gunes-enerjisi-col-512x247-300x144.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/desertec-projesi-gunes-enerjisi-col-512x247-500x241.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/desertec-projesi-gunes-enerjisi-col-512x247-80x38.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2012\/11\/desertec-projesi-gunes-enerjisi-col-512x247.jpg 512w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/>Desertec\u2026.. Asr\u0131n enerji projesi\u2026 Kuzey Afrika \u00e7\u00f6llerinde g\u00fcne\u015f ve r\u00fczg\u00e2r enerjisi kazanma hayali. Ama b\u00f6yle b\u00fcy\u00fck bir vizyonu ger\u00e7e\u011fe d\u00f6n\u00fc\u015ft\u00fcrmek kolay de\u011fil. 2009 y\u0131l\u0131ndan bu yana Desertec\u2019in somut bir \u00e7er\u00e7eveye oturtulmas\u0131na \u00e7al\u0131\u015f\u0131l\u0131yor. \u0130lk etapta projeye ilgi g\u00f6steren sanayi \u015firketleri sab\u0131rs\u0131zlanmaya ba\u015flad\u0131. Siemens\u2019in projeden ayr\u0131laca\u011f\u0131n\u0131 duyurmas\u0131ndan sonra, Desertec\u2019in \u00f6n\u00fcn\u00fc a\u00e7mas\u0131 beklenen Fas\u2019taki pilot proje de tehlikeye girdi.<\/p>\n<p>Desertec Sanayi \u0130nisiyatifi Genel M\u00fcd\u00fcr\u00fc Paul van Son\u2019un bir hafta kadar \u00f6nce Kuzey Afrika\u2019dan g\u00f6nderdi\u011fi mesaj kulak kabartt\u0131rd\u0131. Fas Sanayi Bakan\u0131 Abd\u00fclkadir Amara, Avrupa \u00fclkeleriyle g\u00fcne\u015f ve r\u00fczg\u00e2r santralinin in\u015fas\u0131 ile ye\u015fil enerjinin Avrupa\u2019ya ihrac\u0131n\u0131 \u00f6ng\u00f6ren 600 milyon Euro\u2019luk bir niyet a\u00e7\u0131klamas\u0131 imzalamak istediklerini duyurmu\u015ftu. A\u00e7\u0131klaman\u0131n kas\u0131m ay\u0131nda imzalanacak olmas\u0131 Paul van Son\u2019u heyecanland\u0131rm\u0131\u015ft\u0131. Van Son, imza bulu\u015fmas\u0131n\u0131n gecikmesini, \u201cge\u00e7 olsun, g\u00fc\u00e7 olmas\u0131n\u201d \u015feklinde de\u011ferlendiriyor.<\/p>\n<h2>\u00c7\u00f6l enerjisi Avrupa\u2019y\u0131 ayd\u0131nlatacak<\/h2>\n<p>Yenilenebilir enerjilere ge\u00e7i\u015fte tarihi bir hamle yapan Almanya\u2019n\u0131n ba\u015fkenti Berlin\u2019de ba\u015flayan, asr\u0131n enerji projesi olarak adland\u0131r\u0131lan DESERTEC giri\u015fiminin \u00fc\u00e7\u00fcnc\u00fc y\u0131ll\u0131k konferans\u0131na Hollandal\u0131 van Son da kat\u0131l\u0131yor. D\u0131\u015fi\u015fleri Bakanl\u0131\u011f\u0131\u2019ndaki bulu\u015fma i\u00e7in 48 \u00fclkenin h\u00fck\u00fcmet \u00fcyeleriyle i\u015fadamlar\u0131 Berlin\u2019e geldi. Konu\u015fmac\u0131lar aras\u0131nda Almanya\u2019n\u0131n \u00c7evre, Ekonomi ve D\u0131\u015fi\u015fleri Bakanlar\u0131 da var. Desertec projesinin acilen ihtiyac\u0131 duyulan ileri ad\u0131mlar\u0131na start vermek i\u00e7in en uygun ortam. \u0130nisiyatifin genel direkt\u00f6r\u00fc van Son, ba\u015farabildikleri takdirde Desertec\u2019in, Avrupa ile Yak\u0131n Do\u011fu ve Kuzey Afrika \u00fclkelerinin imzalad\u0131klar\u0131 yenilenebilir enerjinin s\u0131n\u0131r \u00f6tesine naklini d\u00fczenleyen ilk anla\u015fma olaca\u011f\u0131n\u0131 s\u00f6yl\u00fcyor.<\/p>\n<p>Almanya, \u0130talya, Fransa, L\u00fcksemburg ve Malta anla\u015fmay\u0131 imzalayacaklar\u0131n\u0131 duyurmu\u015flard\u0131. Fas\u2019tan gelen elektrik hatlar\u0131n\u0131n Avrupa\u2019ya ula\u015ft\u0131\u011f\u0131 tek \u00fclke olmas\u0131 bak\u0131m\u0131ndan projenin vazge\u00e7ilmezi say\u0131lan \u0130spanya ise m\u00fctereddit davran\u0131yor. Bunun tek nedeni mali s\u0131k\u0131nt\u0131 i\u00e7inde olmas\u0131 de\u011fil. Ak\u0131m\u0131n tersine d\u00f6nmesi, Fas\u2019a elektrik satan \u0130spanya\u2019n\u0131n i\u015fine gelmiyor. Fas G\u00fcne\u015f Enerjisi Ajans\u0131 Ba\u015fkan\u0131 Mustafa Bakkuri yine de iyimserli\u011fini kaybetmiyor. Bakkuri, \u201cEnerji ihracat\u0131 bizim i\u00e7in stratejik \u00f6nemi haiz bir konu. \u0130\u015fi aceleye getirmek yerine b\u00fct\u00fcn taraflar aras\u0131nda uzla\u015fma sa\u011flanmas\u0131n\u0131 beklemek daha iyi olur. B\u00fct\u00fcn \u00fclkelerin angajman, vizyon ve \u00e7\u0131karlar\u0131 \u00f6rt\u00fc\u015f\u00fcyor. Ancak, milli yasalara ve m\u00fcnferit \u00fclkelerin programlar\u0131na ters d\u00fc\u015f\u00fclmemesi ve yap\u0131lmas\u0131 gereken dev yat\u0131r\u0131mlar\u0131 aksatabilecek hususlara \u00e7\u00f6z\u00fcm getirilmesi gerekiyor. Bu bak\u0131mdan imzan\u0131n birka\u00e7 g\u00fcn ya da hafta gecikmesi \u00f6nemli de\u011fil\u201d, diyor.<\/p>\n<h2>Boyutlar\u0131 g\u00f6z korkutuyor<\/h2>\n<p>Ancak Desertec projesi sadece zaman kaybetmekle kalm\u0131yor ama ayn\u0131 zamanda \u00e7\u00f6l elektri\u011fi projesine ortak olan \u00f6zel \u015firketlerle uluslararas\u0131 kurulu\u015flar\u0131n ve m\u00fcnferit devletlerin \u00e7\u0131karlar\u0131n\u0131n ortak paydada bulu\u015fturulmas\u0131nda da b\u00fcy\u00fck g\u00fc\u00e7l\u00fckler \u00e7\u0131k\u0131yor. Desertec Sanayi \u0130nisiyatifi\u2019nin 21 Kuzey Afrika ve Avrupal\u0131 orta\u011f\u0131 var. Projenin Alman ortaklar\u0131 aras\u0131nda RWE ve E.ON gibi enerji devleriyle Schott Solar ve Deutsche Bank say\u0131labilir. Ayr\u0131ca 35 ortak kurulu\u015f da projede pay sahibi. Ger\u00e7ekle\u015fece\u011finden \u015f\u00fcphe duyan ilk \u015firketler projeye s\u0131rt d\u00f6nmeye ba\u015flad\u0131 bile. Siemens tr\u00f6st\u00fc y\u0131l sonunda ayr\u0131laca\u011f\u0131n\u0131 a\u00e7\u0131klad\u0131. Buna kar\u015f\u0131l\u0131k \u00c7in\u2019in en b\u00fcy\u00fck kamu elektrik da\u011f\u0131t\u0131m \u015firketi olan State Grid Corporation of China ile, Desertec\u2019in d\u0131\u015f ortaklar\u0131ndan Amerikan g\u00fcne\u015f paneli imalat\u00e7\u0131s\u0131 First Solar projedeki a\u011f\u0131rl\u0131klar\u0131n\u0131 artt\u0131rmak istiyor. Elektrik \u015firketi RWE\u2019nin temsilcisi Hans B\u00fcnting olduk\u00e7a \u00e7ekingen konu\u015fuyor: \u201c\u00d6nce projenin yararl\u0131 olup olmad\u0131\u011f\u0131 ara\u015ft\u0131r\u0131lmal\u0131. Desertec ortaklar\u0131na ne kadar i\u015f d\u00fc\u015fece\u011fi belirlenmeli. \u00c7in \u015firketi y\u00fcksek gerilim hatlar\u0131nda tecr\u00fcbe sahibi. First Solar, Fas\u2019ta da monte etmeyi d\u00fc\u015f\u00fcnd\u00fc\u011f\u00fcm\u00fcz g\u00fcne\u015f panellerini \u00fcretiyor. B\u00fct\u00fcn bunlara sonunda ortaklar karar verecek.\u201d<\/p>\n<p>Fas y\u00f6netimi en ge\u00e7 2014 y\u0131l\u0131ndan itibaren 500 megavat ye\u015fil enerji \u00fcretmeyi planl\u0131yor. Kuzey Afrika\u2019daki pilot tesislerin toplam kapasitesinin 2 500 megavat\u0131 bulmas\u0131 ve en ge\u00e7 d\u00f6rt y\u0131l sonra Afrika\u2019dan Avrupa\u2019ya elektrik nakledilmesi planlan\u0131yor. Proje tutarsa, \u00e7\u00f6l elektri\u011fi 2050 y\u0131l\u0131nda b\u00fct\u00fcn b\u00f6lge \u00fclkelerinin toplam ihtiyac\u0131yla Avrupa\u2019n\u0131n elektrik ihtiyac\u0131n\u0131n y\u00fczde 20\u2032sini kar\u015f\u0131layacak. Israrla bu vizyonu ger\u00e7ekle\u015ftirmeye \u00e7al\u0131\u015fan Genel direkt\u00f6r van Son s\u0131k s\u0131k \u015fu Arap atas\u00f6z\u00fcn\u00fc zikrediyor: \u201cSebat ve mizah, insan\u0131 \u00e7\u00f6lden a\u015f\u0131ran iki deve gibidir.\u201d<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2012\/11\/09\/asrin-enerji-projesi-desertec-emekleme-safhasini-geride-birakamadi\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>\n<\/div>\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Afrika \u00e7\u00f6llerinin g\u00fcne\u015f ve r\u00fczg\u00e2r enerjisini elektri\u011fe d\u00f6n\u00fc\u015ft\u00fcr\u00fcp Avrupa\u2019ya nakletme d\u00fc\u015f\u00fcncesi \u00e7etin engellerle kar\u015f\u0131la\u015f\u0131yor. DESERTEC Sanayi Giri\u015fimi emekleme safhas\u0131n\u0131 geride b\u0131rakamad\u0131. Desertec\u2026.. Asr\u0131n [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":3379,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,49,50],"tags":[952,68,247,13,16],"views":1138,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/3378"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=3378"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/3378\/revisions"}],"predecessor-version":[{"id":3390,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/3378\/revisions\/3390"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/3379"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=3378"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=3378"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=3378"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}