{"id":33743,"date":"2014-11-22T21:31:23","date_gmt":"2014-11-22T18:31:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=33743"},"modified":"2014-11-22T21:32:23","modified_gmt":"2014-11-22T18:32:23","slug":"solarcilarin-90-milyon-tlsi-2-yildir-bloke","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/solarcilarin-90-milyon-tlsi-2-yildir-bloke\/","title":{"rendered":"(Turkish) Solarc\u0131lar\u0131n 90 Milyon TL`si 2 Y\u0131ld\u0131r Bloke&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/33743\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>600 MW`lik g\u00fcne\u015fe dayal\u0131 elektrik \u00fcretim lisanslar\u0131n\u0131n verilmesi gecikti\u011fi i\u00e7in, ba\u015fvuran \u015firketlerin 90 milyon liral\u0131k teminatlar\u0131n\u0131n 1.5-2 y\u0131ldan bu yana bo\u015f yere bloke edildi\u011fi belirtildi.<\/strong><\/p>\n<p>\u0130zmir Swissotel B\u00fcy\u00fck Efes Ote<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/solarcilarin-90-milyon-tlsi-2-yildir-bloke.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-33744\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/solarcilarin-90-milyon-tlsi-2-yildir-bloke-300x180.jpg\" alt=\"solarcilarin-90-milyon-tlsi-2-yildir-bloke\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/solarcilarin-90-milyon-tlsi-2-yildir-bloke-300x180.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/solarcilarin-90-milyon-tlsi-2-yildir-bloke-80x48.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/solarcilarin-90-milyon-tlsi-2-yildir-bloke.jpg 500w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>li`nde devam eden SolarTR 2014`te lisansl\u0131 g\u00fcne\u015f enerjisi yat\u0131r\u0131m\u0131 yapmak isteyen \u015firketlerin sorunlar\u0131 da g\u00fcndeme geldi.<\/p>\n<p>Etkinlik kapsam\u0131ndaki bir toplant\u0131da konu\u015fan T Dinamik \u015eirketi`nden Mustafa T\u0131r\u0131s, g\u00fcne\u015fe dayal\u0131 elektrik \u00fcretimiyle ilgili d\u00fczenlemelerin \u00fczerinden 3 y\u0131l ge\u00e7ti\u011fi halde hala lisans verilemedi\u011fini hat\u0131rlatt\u0131.<\/p>\n<p>Bu konuda \u00e7ok ge\u00e7 kal\u0131nd\u0131\u011f\u0131n\u0131 hat\u0131rlatan T\u0131r\u0131s, &#8220;Ge\u00e7 kalman\u0131n bir bedeli varsa ve bunu yat\u0131r\u0131mc\u0131lar \u00f6d\u00fcyorsa burada durmak laz\u0131m&#8221; dedi.<\/p>\n<p><strong>90 M\u0130LYON TL`L\u0130K TEM\u0130NAT BLOKE<\/strong><\/p>\n<p>600 MW`lik ilk parti g\u00fcne\u015f lisans\u0131 yar\u0131\u015f\u0131 i\u00e7in 9000 MW`lik ba\u015fvuru oldu\u011funu hat\u0131rlatan Mustafa T\u0131r\u0131s, &#8220;Dosya haz\u0131rlama, harita haz\u0131rlama, kurum g\u00f6r\u00fc\u015f\u00fc alma vs gibi di\u011fer b\u00fct\u00fcn masraflar\u0131 bir yana b\u0131rakal\u0131m. Yat\u0131r\u0131lan yakla\u015f\u0131k 90 milyon liral\u0131k teminat bir bu\u00e7uk iki seneden beri i\u00e7eride bekliyor. Neyi bekliyor? \u00d6n lisanslar\u0131n verilece\u011fi tarihi bekliyor&#8221; diye konu\u015ftu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/solarcilarin-90-milyon-tlsi-2-yildir-bloke_10978.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.600 MW`lik g\u00fcne\u015fe dayal\u0131 elektrik \u00fcretim lisanslar\u0131n\u0131n verilmesi gecikti\u011fi i\u00e7in, ba\u015fvuran \u015firketlerin 90 milyon liral\u0131k teminatlar\u0131n\u0131n 1.5-2 y\u0131ldan bu yana bo\u015f yere bloke [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33744,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[68,63,67,1009,165,17221,227,13,6015,19711],"views":734,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33743"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=33743"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33743\/revisions"}],"predecessor-version":[{"id":33745,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33743\/revisions\/33745"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/33744"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=33743"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=33743"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=33743"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}