{"id":33540,"date":"2014-11-16T23:44:50","date_gmt":"2014-11-16T20:44:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=33540"},"modified":"2014-11-16T23:44:50","modified_gmt":"2014-11-16T20:44:50","slug":"turkiye-ruzgari-enerjiye-esmeye-devam-ediyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor\/","title":{"rendered":"(Turkish) T\u00fcrkiye R\u00fczgar\u0131 Enerjiye Esmeye Devam Ediyor!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/33540\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Nordex, b\u00fcy\u00fck rotor \u00e7ap\u0131 ve \u00fcretimleriyle d\u00fcnya r\u00fczgar pazar\u0131nda b\u00fcy\u00fck ilgi g\u00f6ren N117\/2400 ve N117\/3000 t\u00fcrbinlerinin kullan\u0131laca\u011f\u0131 4 yeni anla\u015fmaya imza att\u0131. Nordex, bu projeler tamamland\u0131\u011f\u0131nda T\u00fcrkiye\u2019deki kurulu g\u00fcc\u00fcn\u00fc 1050 GW\u2019\u0131n \u00fczerine \u00e7\u0131karm\u0131\u015f olacak.<\/strong><\/p>\n<p>Alman t\u00fcrbin \u00fcreticisi Nordex, T\u00fcrkiye r\u00fczgar enerjisi pazar\u0131nda h\u0131z kesmeden b\u00fcy\u00fcmeye devam ediyor. Veri<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-33541\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor.jpg\" alt=\"turkiye-ruzgari-enerjiye-esmeye-devam-ediyor\" width=\"300\" height=\"257\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/11\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor-58x50.jpg 58w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>mlili\u011fi y\u00fcksek t\u00fcrbinleriyle T\u00fcrkiye\u2019de ger\u00e7ekle\u015ftirilen r\u00fczgar yat\u0131r\u0131mlar\u0131 i\u00e7in ilk adreslerden biri haline gelen Nordex, b\u00fcy\u00fck rotor \u00e7ap\u0131 ve \u00fcretimleriyle d\u00fcnya r\u00fczgar pazar\u0131nda b\u00fcy\u00fck ilgi g\u00f6ren N117\/2400 ve N117\/3000 t\u00fcrbinlerinin kullan\u0131laca\u011f\u0131 4 yeni anla\u015fmaya imza att\u0131.<\/p>\n<p><strong>\u00d6DEM\u0130\u015e VE BA\u011eARASI RES NORDEX T\u00dcRB\u0130NLER\u0130YLE KURULACAK<\/strong><\/p>\n<p>Nordex t\u00fcrbinlerinin kullan\u0131laca\u011f\u0131 ilk iki proje, Erdem Holding\u2019e ait \u00d6demi\u015f ve Ba\u011faras\u0131 RES yat\u0131r\u0131mlar\u0131. Nordex, \u0130zmir\u2019in \u00d6demi\u015f il\u00e7esinde bulunan ilk projeye 7 adet N117\/3000 t\u00fcrbini sa\u011flayacak. Ayr\u0131ca anla\u015fmaya g\u00f6re 5 y\u0131l boyunca Premium her \u015fey dahil servis hizmeti sunacak. Kanatlar\u0131 T\u00fcrkiye\u2019de \u00fcretilecek olan t\u00fcrbinlerin kuleleri ise 91 metre olacak.<br \/>\nNordex, 800 metre rak\u0131mda bulunan Ayd\u0131n\u2019daki Ba\u011faras\u0131 RES projesi i\u00e7in ise 20 adet N117\/2400 t\u00fcrbini sa\u011flayacak. 6.6m\/s ortalama r\u00fczgar h\u0131z\u0131 ile IEC3 saha olma \u00f6zelli\u011fi ta\u015f\u0131yan Ba\u011faras\u0131 RES, 2015 y\u0131l\u0131nda devreye al\u0131nd\u0131\u011f\u0131nda 130 bin MWh temiz enerji \u00fcretecek. Ger\u00e7ekle\u015ftirilen bu yat\u0131r\u0131mlarla, telekom\u00fcnikasyon, in\u015faat, do\u011falgaz da\u011f\u0131t\u0131m, \u00fcretim ve geri d\u00f6n\u00fc\u015f\u00fcm sekt\u00f6rlerinde faaliyet g\u00f6steren Erdem Holding, yenilenebilir enerjiyi de portf\u00f6y\u00fcne eklemi\u015f olacak.<\/p>\n<p><strong>KURULU G\u00dcC\u00dcN\u00dc 1050 GW\u2019IN \u00dcZER\u0130NE \u00c7IKARACAK<\/strong><\/p>\n<p>Nordex\u2019in \u00fc\u00e7\u00fcnc\u00fc projesi ise 2013 y\u0131l\u0131nda devreye al\u0131nan EdincikRES projesi i\u00e7in planlanan kapasite art\u0131\u015f\u0131 i\u00e7in 7 yeni t\u00fcrbin teminini kaps\u0131yor. Bu geni\u015fletme projesi tamamland\u0131\u011f\u0131nda EdincikRES\u2019in hali haz\u0131rda 30 MW olan kapasitesi 56.4MW\u2019a y\u00fckselecek. B\u00f6ylece N117\/2400 t\u00fcrbinleri ile \u0130zmir\u2019in ard\u0131ndan Nordex\u2019in olduk\u00e7a g\u00fc\u00e7l\u00fc oldu\u011fu Band\u0131rma b\u00f6lgesinde de elektrik \u00fcretecek.<br \/>\nNordex yine Bursa Temiz Enerji\u2019ye ait 25 MW kapasiteli Bandirma-3 RES i\u00e7in planlanan kapasite art\u0131\u015f\u0131 kapsam\u0131nda 7 adet N117\/2400 t\u00fcrbin sa\u011flanacak. Bu yat\u0131r\u0131mla Bandirma-3 RES\u2019in kapasitesi 41.8MW\u2019a y\u00fckselecek.<br \/>\nNordex, bu projeler tamamland\u0131\u011f\u0131nda T\u00fcrkiye\u2019deki kurulu g\u00fcc\u00fcn\u00fc 1050 GW\u2019\u0131n \u00fczerine \u00e7\u0131karm\u0131\u015f olacak.<\/p>\n<p><strong>DEV R\u00dcZGAR T\u00dcRB\u0130N\u0130 N117\/2400 AL\u0130A\u011eA\u2019DA KURULDU<\/strong><\/p>\n<p>Avrupa\u2019da ve \u00f6zellikle Almanya\u2019da b\u00fcy\u00fck ilgi g\u00f6ren Nordex\u2019in N117\/2400 modeli t\u00fcrbinlerinin kullan\u0131ld\u0131\u011f\u0131 ilk proje olan \u0130zmir Alia\u011fa RES devreye al\u0131nd\u0131. Ak\u00e7a Holding\u2019e ait olan Alia\u011fa projesinde 4 adet N117\/2400 r\u00fczgar t\u00fcrbini kullan\u0131ld\u0131. Mevsimsel anlamda r\u00fczgarl\u0131 bir d\u00f6nem ya\u015fayan sahada montaj s\u00fcresi 25 g\u00fcn s\u00fcrd\u00fc. 8 ki\u015filik deneyimli bir montaj ekibinin sahada haz\u0131r bulunmas\u0131 \u00e7al\u0131\u015fmalara h\u0131z verdi. Kule y\u00fcksekli\u011fi i\u00e7in 91 metre kule tercih edilen projede montaj s\u0131ras\u0131nda 600 tonluk paletli vin\u00e7 kullan\u0131ld\u0131. N117\/2400, rotor \u00e7ap\u0131 itibariyle T\u00fcrkiye\u2019de bug\u00fcne kadar kurulumu yap\u0131lan en b\u00fcy\u00fck t\u00fcrbin olma \u00f6zelli\u011fini g\u00f6steriyor.<\/p>\n<p>Nordex\u2019in Projeden Sorumlu Proje M\u00fcd\u00fcr\u00fc Serkan Karaman proje ile ilgili \u015fu a\u00e7\u0131klamalarda bulundu: \u201c58.5 metrelik dev kanatlar T\u00fcrkiye i\u00e7in bir ilk ve bu ilk deneyimin verdi\u011fi sorumluluk bilinci ile her hareketimizi Saha M\u00fcd\u00fcr\u00fcm\u00fcz Ersin Okuyucu ile birlikte \u00e7ok iyi planlad\u0131k. 58.5 metrelik kanatlar Nordex\u2019in ba\u015far\u0131l\u0131 tasar\u0131m\u0131 sayesinde 50 metrelik kanatlarla ayn\u0131 a\u011f\u0131rl\u0131\u011fa sahip, ancak elbette r\u00fczgar hacmini kar\u015f\u0131layan kanat alan\u0131 daha fazla oldu\u011fu i\u00e7in daha dikkatli davranmam\u0131z gerekiyordu. Bu sebeple, kanat montaj\u0131 s\u0131ras\u0131nda r\u00fczgar h\u0131z\u0131n\u0131n 5m\/s\u2019yi ge\u00e7memesine dikkat ettik. Durum b\u00f6yle olunca, \u00e7al\u0131\u015fma saatlerimizi 2 saat geriye \u00e7ekerek, sabah saatlerinde montaj yapmaya \u00f6zen g\u00f6sterdik.\u201d<\/p>\n<p>Alia\u011fa RES, yenilenebilir enerji yat\u0131r\u0131mlar\u0131na ivme kazand\u0131ran Ak\u00e7a Holding\u2019in ilk r\u00fczgar enerjisi projesi olacak. Proje M\u00fcd\u00fcr\u00fc G\u00f6khan Avdan yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, \u201c\u00dclkemize kazand\u0131r\u0131lan bu projede, sekt\u00f6r\u00fcn en verimli t\u00fcrbinleriyle, do\u011fal kaynaklar\u0131m\u0131zdan en y\u00fcksek seviyede faydalanmak ama\u00e7land\u0131 ve t\u00fcrbin tedarik\u00e7imiz Nordex ba\u015fta olmak \u00fczere, r\u00fczgar sekt\u00f6r\u00fcn\u00fcn tecr\u00fcbeli firmalar\u0131 ile \u00e7al\u0131\u015f\u0131ld\u0131. T\u00fcm in\u015faat, montaj ve elektrik alt yap\u0131 i\u015fleri s\u00fcresince do\u011faya da en y\u00fcksek \u00f6zen g\u00f6sterilerek, tek bir a\u011faca dahi zarar vermeden proje tamamland\u0131\u201d dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/energyworld.com.tr\/turkiye-ruzgari-enerjiye-esmeye-devam-ediyor.html\" target=\"_blank\" rel=\"nofollow\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Nordex, b\u00fcy\u00fck rotor \u00e7ap\u0131 ve \u00fcretimleriyle d\u00fcnya r\u00fczgar pazar\u0131nda b\u00fcy\u00fck ilgi g\u00f6ren N117\/2400 ve N117\/3000 t\u00fcrbinlerinin kullan\u0131laca\u011f\u0131 4 yeni anla\u015fmaya imza att\u0131. Nordex, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":33541,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1768,63,67,1009,2556,165,1663,2455,1190,474,69,16,231,4130,846,1286],"views":1167,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33540"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=33540"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33540\/revisions"}],"predecessor-version":[{"id":33542,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/33540\/revisions\/33542"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/33541"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=33540"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=33540"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=33540"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}