{"id":32422,"date":"2014-10-13T18:10:16","date_gmt":"2014-10-13T15:10:16","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=32422"},"modified":"2015-05-29T13:30:29","modified_gmt":"2015-05-29T10:30:29","slug":"anadolu-grubu-gurcistandaki-hes-yatirimini-devreye-aldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/anadolu-grubu-gurcistandaki-hes-yatirimini-devreye-aldi\/","title":{"rendered":"(Turkish) Anadolu Grubu G\u00fcrcistan&#8217;daki HES Yat\u0131r\u0131m\u0131n\u0131 Devreye Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/32422\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Anadolu Grubu yat\u0131r\u0131m\u0131 ile G\u00fcrcistan\u2019da ger\u00e7ekle\u015ftirilen Paravani Hidroelektrik Santrali projesi devreye al\u0131nd\u0131. Anadolu Grubu&#8217;nun G\u00fcrcistan&#8217;daki \u015firketi Georgia Urban Energy Ltd taraf\u0131ndan sunulan bilgilere g\u00f6re 87 MW kurulu g\u00fcce sahip olan proje ile y\u0131ll\u0131k 450,746 GWh elektrik \u00fcretimi sa\u011flanmas\u0131 hedefleniyor. Santralde \u00fcretilen elektrik ise Aral\u0131k, Ocak ve \u015eubat aylar\u0131nda G\u00fcrcistan \u015febekesine verilecek iken, kalan di\u011fer 9 ayda ise T\u00fcrkiye&#8217;ye iletilecek.<\/strong><\/p>\n<p>Anadolu Grubu toplam yat\u0131r\u0131m maliyeti 156,5 milyon dolar olan proje i\u00e7in Avrupa \u0130mar ve Kalk\u0131nma Bankas\u0131\u2019ndan (EBRD) 52 milyon dolar, Uluslararas\u0131 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-10444\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi-300x199.jpg\" alt=\"anadolu-grubu-gurcistan-hes-yatirimi\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2013\/05\/anadolu-grubu-gurcistan-hes-yatirimi.jpg 526w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Finans Kurumu\u2019ndan (IFC) 40,5 milyon dolar ve ticari bankalardan 23 milyon dolarl\u0131k finansman sa\u011flam\u0131\u015ft\u0131.<\/p>\n<p><strong>G\u00fcrcistan 2030&#8217;da y\u0131ll\u0131k 50 milyar kWh&#8217;lik elektrik ithalat\u0131 hedefliyor<\/strong><\/p>\n<p>G\u00fcrcistan 2006 y\u0131l\u0131 elektrik t\u00fcketimini y\u00fczde 72 oran\u0131nda hidroelektrik santrallerden sa\u011flarken bu oran\u0131 2010 y\u0131l\u0131nda y\u00fczde 90\u2019a \u00e7\u0131karm\u0131\u015ft\u0131. \u00dclke y\u00f6netimi \u00fclkenin \u00f6zellikle hidroelektrik alan\u0131ndaki potansiyelinden yararlanarak 2030 y\u0131l\u0131nda kom\u015fular\u0131na ve Avrupa \u00fclkelerine y\u0131ll\u0131k\u00a0 50 milyar kWh elektrik sat\u0131\u015f\u0131 ger\u00e7ekle\u015ftirebilmeyi hedefliyor.<\/p>\n<p>Paravani HES projesi ile ilgili dosyalarda yaln\u0131zca projenin bulundu\u011fu b\u00f6lgede 26.000 civar\u0131nda nehir bulundu\u011fu, bunun 300\u2019\u00fcn\u00fcn enerji yat\u0131r\u0131mlar\u0131na uygun oldu\u011fu ve bu nehirlerin 15 GW\u2019l\u0131k kurulu g\u00fc\u00e7 ile 50 milyar kWh\u2019lik elektrik \u00fcretimi potansiyeli ta\u015f\u0131d\u0131\u011f\u0131 bildiriliyor.<\/p>\n<p><strong>Bor\u00e7ka-Ah\u0131ska iletim hatt\u0131 2013&#8217;te devreye girmi\u015fti<\/strong><\/p>\n<p>T\u00fcrkiye ve G\u00fcrcistan h\u00fck\u00fcmetleri taraf\u0131ndan 2012 y\u0131l\u0131nda imzalanan anla\u015fma ile in\u015fas\u0131 devam eden Bor\u00e7ka-Ah\u0131ska S\u0131n\u0131r \u00d6tesi \u0130letim Hatt\u0131 ile\u00a0G\u00fcrcistan&#8217;da \u00fcretilen elektri\u011fin T\u00fcrkiye \u00fczerinden Avrupa&#8217;ya ta\u015f\u0131nmas\u0131na da imkan sa\u011flam\u0131\u015ft\u0131.<\/p>\n<p>G\u00fcrcistan ile T\u00fcrkiye aras\u0131nda geli\u015ftirilen Karadeniz \u0130letim A\u011f\u0131 projesi kapsam\u0131nda in\u015fa edilen hat Siemens taraf\u0131ndan ger\u00e7ekle\u015ftirilerek ge\u00e7en y\u0131l\u0131n aral\u0131k ay\u0131nda tam kapasite ile devreye al\u0131nm\u0131\u015ft\u0131.<\/p>\n<p>Halihaz\u0131rda G\u00fcrcistan&#8217;da Anadolu Grubu d\u0131\u015f\u0131nda, \u00c7al\u0131k, A\u011fao\u011flu, Sanko, Ata\u00e7, Energo gibi T\u00fcrk \u015firketleri \u00e7e\u015fitli enerji yat\u0131r\u0131mlar\u0131na devam ediyorlar.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/yenilenebilir-enerji\/anadolu-grubu-gurcistandaki-hes-yatirimini-devreye-aldi\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Anadolu Grubu yat\u0131r\u0131m\u0131 ile G\u00fcrcistan\u2019da ger\u00e7ekle\u015ftirilen Paravani Hidroelektrik Santrali projesi devreye al\u0131nd\u0131. Anadolu Grubu&#8217;nun G\u00fcrcistan&#8217;daki \u015firketi Georgia Urban Energy Ltd taraf\u0131ndan sunulan bilgilere [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":10444,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[5052,19,63,67,1009,165,18835,3405,35370,70,18818],"views":863,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/32422"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=32422"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/32422\/revisions"}],"predecessor-version":[{"id":39693,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/32422\/revisions\/39693"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/10444"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=32422"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=32422"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=32422"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}