{"id":31757,"date":"2014-09-23T20:29:55","date_gmt":"2014-09-23T17:29:55","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31757"},"modified":"2014-09-23T20:29:55","modified_gmt":"2014-09-23T17:29:55","slug":"limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor\/","title":{"rendered":"(Turkish) Limak, Enerji Portf\u00f6y\u00fcn\u00fc \u0130ki Kat\u0131na \u00c7\u0131kar\u0131p 4,000 MW\u2019\u0131 Hedefliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31757\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sabiha G\u00f6k\u00e7en Havaliman\u0131\u2019n\u0131n i\u015fletmecisi ISG\u2019deki y\u00fczde 40 hissesini TAV Havalimanlar\u0131 Holding\u2019e 285 milyon Euro bedelle satma konusunda anla\u015fmaya vararak havaliman\u0131 i\u015fletmecili\u011finden \u00e7\u0131kan Limak Yat\u0131r\u0131m, gelecek be\u015f y\u0131l i\u00e7inde yeni projeler ve sat\u0131n almalar yoluyla enerji \u00fcretimindeki portf\u00f6y\u00fcn\u00fc iki kat\u0131na \u00e7\u0131kararak 4,000 MW\u2019a ula\u015fmay\u0131 hedefliyor.<\/strong><span id=\"more-67214\"><\/span><\/p>\n<p>Hisse sat\u0131\u015f\u0131n\u0131n ard\u0131ndan \u00f6n\u00fcm\u00fczdeki d\u00f6neme dair planlar\u0131 konusunda Reuters\u2019\u0131n sorular\u0131n\u0131 yan\u0131tlayan<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-31758\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor-300x213.jpg\" alt=\"limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor\" width=\"300\" height=\"213\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor-300x213.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor-500x355.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/limak-enerji-portfoyunu-iki-katina-cikarip-4000-mwi-hedefliyor.jpg 606w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> Limak Yat\u0131r\u0131m\u2019\u0131n Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ebru \u00d6zdemir, \u201c\u00dc\u00e7\u00fcnc\u00fc Havaliman\u0131na \u00e7ok b\u00fcy\u00fck proje. Bundan sonra ortaklar\u0131m\u0131zla beraber buna konsantre olaca\u011f\u0131z. Ayr\u0131ca biz T\u00fcrkiye\u2019de \u00e7ok ciddi olarak enerji sekt\u00f6r\u00fcne inan\u0131yoruz ve yeni enerji projeleri yapmak istiyoruz. TAV\u2019dan alaca\u011f\u0131m\u0131z 285 milyon Euro\u2019luk kayna\u011f\u0131 da kendi yeni enerji projelerimiz ve \u00fc\u00e7\u00fcnc\u00fc havaliman\u0131nda kullanmay\u0131 \u00f6ng\u00f6r\u00fcyoruz\u201d dedi.<\/p>\n<p>\u0130stanbul\u2019a \u00fc\u00e7\u00fcnc\u00fc havaliman\u0131n\u0131n yap\u0131m\u0131 ve 25 y\u0131ll\u0131k i\u015fletimi ihalesini ge\u00e7ti\u011fimiz y\u0131l Limak-Cengiz-Kolin-Kalyon-Mapa ortak giri\u015fim grubu 22.152 milyon Euro art\u0131 KDV teklifle kazanm\u0131\u015ft\u0131. Havaliman\u0131n\u0131n 90 milyon yolcu kapasiteli ilk etab\u0131n\u0131n 2017 y\u0131l\u0131n\u0131n Ekim ay\u0131nda hizmete a\u00e7\u0131lmas\u0131 hedefleniyor.<\/p>\n<p><strong>ANA \u0130\u015e KOLU ENERJ\u0130 OLACAK<\/strong><\/p>\n<p>Enerji sekt\u00f6r\u00fcn\u00fcn \u00f6n\u00fcm\u00fczdeki d\u00f6nemde Limak Grubu i\u00e7erisinde a\u00e7\u0131k ara \u00f6nde giden ana i\u015f kolu olaca\u011f\u0131n\u0131 belirten \u00d6zdemir, enerjide \u00fcretimden ticarete kadar dikey entegrasyonu tamamlad\u0131klar\u0131n\u0131 belirterek, \u201cB\u00f6lgesinde g\u00fc\u00e7l\u00fc bir enerji oyuncusu olmak istiyoruz. Hem \u00fcretimi \u00e7e\u015fitlendirece\u011fiz, hem i\u015fin ticaretinde ve da\u011f\u0131t\u0131m\u0131nda da var\u0131z. \u00d6n\u00fcm\u00fczdeki d\u00f6nemde k\u00f6m\u00fcr santrali, r\u00fczgar santrali ve g\u00fcne\u015f santrali kurmay\u0131 da hedefliyoruz\u201d dedi.<\/p>\n<p>Limak\u2019\u0131n enerji \u00fcretimi taraf\u0131nda \u015fu anda yakla\u015f\u0131k 2,000 MW\u2019l\u0131k bir portf\u00f6y\u00fc bulundu\u011funu belirten \u00d6zdemir, \u201cBe\u015f y\u0131l sonra enerjide iki kat daha b\u00fcy\u00fcr\u00fcz diye d\u00fc\u015f\u00fcn\u00fcyorum. Yakla\u015f\u0131k 4,000 MW kurulu g\u00fcce ula\u015f\u0131r\u0131z. Tabii bunun i\u00e7inde proje bazl\u0131 ortakl\u0131klar da olabilir\u201d dedi ve ekledi:<\/p>\n<p>\u201cEnerjide b\u00fcy\u00fcmek i\u00e7in bir tak\u0131m sat\u0131n almalar da yapmay\u0131 planl\u0131yoruz. Yani sadece organik de\u011fil, inorganik de b\u00fcy\u00fcyebiliriz. Ortak sat\u0131n almalara da a\u00e7\u0131\u011f\u0131z.\u201d<\/p>\n<p>Limak\u2019\u0131n elektrik \u00fcretim portf\u00f6y\u00fcnde ge\u00e7en y\u0131l \u00f6zelle\u015ftirme ihalesiyle ald\u0131klar\u0131 1,200 MW\u2019l\u0131k Hamitabat do\u011falgaz \u00e7evrim santrali ve \u015fu anda i\u015fletmede olan 626 MW\u2019l\u0131k HES bulunuyor. \u00d6zdemir, 130 MW\u2019l\u0131k Pembelik HES projesinin bir ay i\u00e7inde devreye girece\u011fini, 100 MW\u2019l\u0131k Karg\u0131 HES projesinin ise proje a\u015famas\u0131nda oldu\u011funu s\u00f6yledi.<\/p>\n<p>\u00d6zdemir, \u201cBir de 15 MW\u2019l\u0131k Buharkent jeotermal projemiz var. Dolay\u0131s\u0131yla \u00e7ok yak\u0131n zamanda Karg\u0131 ve jeotermali de bitirince 2,000 MW\u2019l\u0131k bir b\u00fcy\u00fckl\u00fc\u011fe ula\u015fm\u0131\u015f olaca\u011f\u0131z\u201d dedi.<\/p>\n<p>Hamitabat Santrali\u2019ni devrald\u0131ktan sonra yenileme yat\u0131r\u0131m\u0131na ba\u015flad\u0131klar\u0131n\u0131 dile getiren \u00d6zdemir, \u201cBurada santralin yenilenmesi i\u00e7in Gama G\u00fc\u00e7 Sistemleri \u015firketi ile ge\u00e7ti\u011fimiz g\u00fcnlerde bir anla\u015fma imzalad\u0131k. Santralin ekipmanlar\u0131 ise Siemens\u2019den al\u0131nacak. Orada 520 milyon Euro tutar\u0131nda bir yat\u0131r\u0131m yapaca\u011f\u0131z ve b\u00fct\u00fcn santrali yenileyerek yeni \u00fcniteler koyaca\u011f\u0131z. Bu yat\u0131r\u0131m\u0131 da 2016 sonunda devreye almay\u0131 hedefliyoruz\u201d dedi.<\/p>\n<p>Hamitabat\u2019a yap\u0131lacak yat\u0131r\u0131m\u0131n finansman\u0131 i\u00e7in finans kurulu\u015flar\u0131 ve bankalarla g\u00f6r\u00fc\u015ft\u00fcklerini belirten \u00d6zdemir, \u201c\u015eu anda Hermes, KFW ve bankalarla g\u00f6r\u00fc\u015f\u00fcyoruz\u201d dedi. \u00d6zdemir, Hamitabat\u2019taki yat\u0131r\u0131m ile santralin mevcut durumda y\u00fczde 40\u2032\u0131n alt\u0131nda olan verimlili\u011finin y\u00fczde 60\u2032\u0131n \u00fczerine \u00e7\u0131kaca\u011f\u0131n\u0131 vurgulad\u0131.<\/p>\n<p>Limak Yat\u0131r\u0131m, elektrik da\u011f\u0131t\u0131m\u0131nda Bo\u011fazi\u00e7i, Uluda\u011f, Akdeniz ve \u00c7aml\u0131bel EDA\u015e\u2019lar\u0131n i\u015fletmesini y\u00fcr\u00fcten Cengiz-Limak-Kolin konsorsiyumunda e\u015fit ortak konumunda. \u00c7al\u0131k Grubu ile Kosova\u2019n\u0131n elektrik da\u011f\u0131t\u0131m\u0131n\u0131 da ortak olarak yapan Limak, burada da y\u0131ll\u0131k 4.5 milyar kWh elektrik da\u011f\u0131t\u0131yor. Ayr\u0131ca Bulgaristan, Romanya ve S\u0131rbistan\u2019dan elektrik ithal ediyor.<\/p>\n<p>\u201cSabiha G\u00f6k\u00e7en\u2019in sat\u0131\u015f\u0131n\u0131n ger\u00e7ekle\u015fmesi halinde Limak Yat\u0131r\u0131m\u2019\u0131n i\u00e7inde enerji grubunu di\u011fer altyap\u0131 i\u015flerinden ay\u0131rma gibi bir plan\u0131m\u0131z var\u201d diye konu\u015fan \u00d6zdemir, \u00f6n\u00fcm\u00fczdeki d\u00f6nemde enerji portf\u00f6y\u00fcn\u00fc i\u00e7eren \u015firketi halka arz edebileceklerini s\u00f6yledi.<\/p>\n<p>Haberin Devam\u0131 i\u00e7in <a href=\"http:\/\/www.cnbce.com\/haberler\/enerji\/limak-enerjiye-odaklanacak\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: cnbce<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sabiha G\u00f6k\u00e7en Havaliman\u0131\u2019n\u0131n i\u015fletmecisi ISG\u2019deki y\u00fczde 40 hissesini TAV Havalimanlar\u0131 Holding\u2019e 285 milyon Euro bedelle satma konusunda anla\u015fmaya vararak havaliman\u0131 i\u015fletmecili\u011finden \u00e7\u0131kan Limak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31758,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53,49,47,50],"tags":[4345,18324,63,67,1009,18176,165,2401,7323,35370,18325,1457,18327,18326,312,18328,18329],"views":567,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31757"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31757"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31757\/revisions"}],"predecessor-version":[{"id":31759,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31757\/revisions\/31759"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31758"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31757"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31757"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31757"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}