{"id":31696,"date":"2014-09-22T15:12:09","date_gmt":"2014-09-22T12:12:09","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31696"},"modified":"2014-09-22T15:12:09","modified_gmt":"2014-09-22T12:12:09","slug":"lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi\/","title":{"rendered":"(Turkish) Lisanss\u0131z Elektrik \u00dcretiminde En B\u00fcy\u00fck Engel B\u00fcrokrasi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31696\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>R\u00fczg\u00e2r, g\u00fcne\u015f, su gibi yerli enerji kaynaklar\u0131ndan \u00f6ncelikle kendi elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in geli\u015ftirilen lisanss\u0131z elektrik \u00fcretimi, b\u00fcrokrasiye tak\u0131ld\u0131.<span id=\"more-67200\"><\/span> Yasa gere\u011fi elektrik da\u011f\u0131t\u0131m \u015firketlerinin (EDA\u015e) 45 g\u00fcnde sonu\u00e7land\u0131rmas\u0131 gereken ba\u015fvurularda s\u00fcre 5 aya kadar uzuyor.<\/strong><\/p>\n<p>Enerji Gazetecileri ve Medya Derne\u011fi (EGAD) ile Lisanss\u0131z Elektrik \u00dcretimi Derne\u011fi (L\u0130-DER), lisanss\u0131z elektrik \u00fcretimini \u0130stanbul\u2019da masaya yat\u0131rd\u0131. 2023 y\u0131l\u0131na varmadan, T\u00fcrkiye\u2019deki elektrik t\u00fcketiminin y\u00fczde 6\u2019s\u0131n\u0131n lisanss\u0131z g\u00fcne\u015f enerjisinden kar\u015f\u0131lanaca\u011f\u0131 tahmininde bulunan L\u0130-DER Ba\u015fkan\u0131 Yal\u00e7\u0131n K\u0131ro\u011flu, bunun bug\u00fcnk\u00fc rakamlarla y\u0131lda 15 milyar kWh\u2019a yak\u0131n bir elektrik anlam\u0131na geldi\u011fine dikkat \u00e7ekti.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-31697\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi-300x212.jpg\" alt=\"lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi\" width=\"300\" height=\"212\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi-300x212.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi-500x354.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi.jpg 576w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>K\u0131ro\u011flu, \u201cLisanss\u0131z elektrik \u00fcretimi i\u00e7in ba\u015fvuru say\u0131s\u0131 \u015fimdiden 3 bin 715\u2019i buldu. Y\u0131l sonuna do\u011fru 4 bin 500 ba\u015fvuruya ula\u015f\u0131l\u0131rsa \u015fa\u015f\u0131rmayaca\u011f\u0131z. \u00d6zellikle, g\u00fcne\u015f enerjisine inan\u0131lmaz ilgi var.\u201d dedi. Toplam olumlu ba\u015fvuru say\u0131s\u0131 bin 604 olurken, hen\u00fcz incelenmeyen bin 690 ba\u015fvuru bulunuyor, 721 ba\u015fvuru ise incelemede. Olumlu ba\u015fvurularda toplam bin MW (megavat) d\u00fczeyi a\u015f\u0131ld\u0131. De\u011ferlendirmedekilerle birlikte bu rakam yakla\u015f\u0131k 2000 MW\u2019nin \u00fczerinde.<\/p>\n<p>Lisanss\u0131z elektrik \u00fcretimine g\u00f6sterilen yo\u011fun ilgiye ra\u011fmen \u015fu ana kadar \u00fcretime ge\u00e7irilebilen tesis say\u0131s\u0131 s\u0131n\u0131rl\u0131 kald\u0131. L\u0130-DER verilerine g\u00f6re halen 58\u2019i g\u00fcne\u015fe dayal\u0131, 62 adet lisanss\u0131z elektrik \u00fcretim sistemi devrede. Bunun kurulu g\u00fc\u00e7 kar\u015f\u0131l\u0131\u011f\u0131 ise 26 MW. Birka\u00e7 hafta i\u00e7erisinde \u00fcretime ba\u015flamas\u0131 beklenen 37 tesis bulunuyor. B\u00f6ylece i\u015fletmedeki lisanss\u0131z proje say\u0131s\u0131 99\u2019a, kurulu g\u00fc\u00e7 de 43,3 MW d\u00fczeyine ula\u015facak. Yal\u00e7\u0131n K\u0131ro\u011flu, y\u0131l sonunda sekt\u00f6r\u00fcn 100 MW s\u0131n\u0131r\u0131n\u0131 ge\u00e7ece\u011fi g\u00f6r\u00fc\u015f\u00fcnde.<\/p>\n<p>L\u0130-DER y\u00f6netimi, lisanss\u0131z elektrik \u00fcretimi i\u00e7in yap\u0131lan yat\u0131r\u0131mlar\u0131n mali tutar\u0131na ili\u015fkin tahminlerini de payla\u015ft\u0131. Buna g\u00f6re \u015fu anda devredeki 26 MW\u2019lik tesislerin yat\u0131r\u0131m tutar\u0131 30 milyon Euro. \u00d6n\u00fcm\u00fczdeki g\u00fcnlerde 43,3 MW\u2019lik kurulu g\u00fcce ula\u015f\u0131l\u0131nca bu tutar 50 milyon Euro\u2019yu bulacak. Y\u0131l sonunda hedeflenen 100 MW\u2019lik kurulu g\u00fc\u00e7 ile yakla\u015f\u0131k 120 milyon Euro\u2019luk toplam yat\u0131r\u0131m tutar\u0131na ula\u015f\u0131lacak. Yal\u00e7\u0131n K\u0131ro\u011flu, yo\u011fun ilgiye ra\u011fmen s\u00fcrecin yava\u015f ilerlemesinden rahats\u0131z: \u201cKabul i\u00e7in yap\u0131lan 668 ba\u015fvurunun 184\u2019\u00fcn\u00fc onaylad\u0131ysan\u0131z ve h\u00e2l\u00e2 incelemede bir s\u00fcr\u00fc proje varsa yava\u015f gidiyorsunuz demektir.\u201d L\u0130-DER, b\u00fcrokraside ya\u015fanan durumu \u00f6rnekle a\u00e7\u0131kl\u0131yor: 1,5 g\u00fcnde kurulan lisanss\u0131z \u00fcretim sistemi i\u00e7in 7-8 ay izin s\u00fcreci var. B\u00fcrokrasinin sekt\u00f6r\u00fcn \u00f6n\u00fcn\u00fc kesti\u011fini s\u00f6yleyen K\u0131ro\u011flu, \u201cEn basit \u015fey, \u00c7ED gerekli de\u011fildir belgesi. 2 MW\u2019ye kadar olan elektrik sistemleri \u00c7ED\u2019e tabi de\u011fil. Ama siz bunun i\u00e7in bile \u00c7ED gerekli de\u011fildir belgesi talebiyle \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131\u2019na ba\u015fvuruyorsunuz. Bazen 2 g\u00fcnde bazen 12 g\u00fcnde \u00e7\u0131k\u0131yor bu belge.\u201d de\u011ferlendirmesi yapt\u0131. K\u0131ro\u011flu, lisanss\u0131z \u00fcretime ilgiye ilgin\u00e7 bir \u00f6rnek verdi: \u201cElektri\u011fe zam geldi\u011fi anda lisanss\u0131z elektrik \u00fcretimi i\u015fi yapan firmalar\u0131n telefonlar\u0131 susmaz hale geliyor.\u201d<\/p>\n<p>Haberin Devam\u0131 i\u00e7in <a href=\"http:\/\/www.zaman.com.tr\/ekonomi_lisanssiz-elektrik-uretiminde-en-buyuk-engel-burokrasi_2245838.html\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Zaman<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.R\u00fczg\u00e2r, g\u00fcne\u015f, su gibi yerli enerji kaynaklar\u0131ndan \u00f6ncelikle kendi elektrik ihtiyac\u0131n\u0131 kar\u015f\u0131lamak i\u00e7in geli\u015ftirilen lisanss\u0131z elektrik \u00fcretimi, b\u00fcrokrasiye tak\u0131ld\u0131. Yasa gere\u011fi elektrik da\u011f\u0131t\u0131m [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31697,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,47,50],"tags":[18274,1079,1478,63,67,1009,165,227,13,2282,4273,69,16,99,6996],"views":845,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31696"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31696"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31696\/revisions"}],"predecessor-version":[{"id":31698,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31696\/revisions\/31698"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31697"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31696"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31696"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31696"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}