{"id":31404,"date":"2014-09-12T20:03:00","date_gmt":"2014-09-12T17:03:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31404"},"modified":"2014-09-12T20:03:00","modified_gmt":"2014-09-12T17:03:00","slug":"borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim\/","title":{"rendered":"(Turkish) Borusan EnBW Enerji\u2019den R\u00fczg\u00e2r Enerjisinde 257 MW\u2019l\u0131k Yat\u0131r\u0131m&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31404\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Borusan EnBW Enerji, r\u00fczg\u00e2r enerjisinde 257 MW\u2019l\u0131k ilave kurulu g\u00fcc\u00fc T\u00fcrkiye\u2019ye kazand\u0131racak 330 milyon dolar tutar\u0131nda bir yat\u0131r\u0131m ger\u00e7ekle\u015ftirdi. Bu yenilenebilir enerji yat\u0131r\u0131m\u0131 Mersin, \u0130zmir, Bursa ve \u00c7anakkale\u2019de 4 RES\u2019in temellerinin at\u0131lmas\u0131, Tekirda\u011f Balabanl\u0131 RES\u2019in hizmete girmesi ve Bal\u0131kesir Band\u0131rma RES\u2019te kapasitenin art\u0131r\u0131lmas\u0131n\u0131 kaps\u0131yor.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin yenilenebilir enerji kaynaklar\u0131n\u0131 geli\u015ftirmek ve bu alandaki portf\u00f6y\u00fcn\u00fc g\u00fc\u00e7lendirmek vizyonu ile yola \u00e7\u0131kan Borusan EnBW Enerji yat\u0131r\u0131mlar\u0131n\u0131 h\u0131z kesmeden s\u00fcrd\u00fcr\u00fcyor. Tekirda\u011f Balabanl\u0131 R\u00fczg\u00e2r Enerji Santrali\u2019nin (RES) hizmete girmesi, Mut RES (Mersin\/Karaman), Fuatres RES (Kemalpa\u015fa, \u0130zmir), Harmanl\u0131k RES (Karacabey, Bursa) ve Koru RES (Lapseki, \u00c7anakkale) tesislerinin temellerinin at\u0131lmas\u0131 ve Band\u0131rma RES (Band\u0131rma, Bal\u0131kesir) kapasite art\u0131\u015f\u0131 dolay\u0131s\u0131yla bir t\u00f6ren d\u00fczenlendi.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-31405\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim-300x211.jpg\" alt=\"borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim\" width=\"300\" height=\"211\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim-300x211.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim-500x351.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim-71x50.jpg 71w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/borusan-enbw-enerjiden-ruzgar-enerjisinde-257-mwlik-yatirim.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Ger\u00e7ekle\u015fen t\u00f6rene Enerji ve Tabii Kaynaklar Bakan\u0131 Taner Y\u0131ld\u0131z, Almanya Baden W\u00fcrttemberg Eyaleti Finans ve Ekonomi Bakan\u0131 Dr. Nils Schmid, Borusan Holding Y\u00f6netim Kurulu Ba\u015fkan\u0131 Ahmet Kocab\u0131y\u0131k, Borusan Holding CEO\u2019su Agah U\u011fur, EnBW A.G. CEO\u2019su Dr. Frank Mastiaux ve Borusan EnBW Enerji Genel M\u00fcd\u00fcr\u00fc Mehmet Acarla ile se\u00e7kin bir davetli toplulu\u011fu kat\u0131ld\u0131.<\/p>\n<p>Devreye giren 50 MW\u2019l\u0131k kurulu g\u00fcce sahip olan Tekirda\u011f Balabanl\u0131 RES\u2019te, 22 adet Siemens SWT 2,3-108 t\u00fcrbin bulunuyor. Kule y\u00fcksekli\u011fi 90 metre ve t\u00fcrbin kanat \u00e7ap\u0131 108 metre olan Balabanl\u0131 RES\u2019in in\u015faat i\u015flerine 2013 y\u0131l\u0131n\u0131n A\u011fustos ay\u0131nda ba\u015fland\u0131 ve 8 ay gibi rekor bir s\u00fcrede tesisin ilk faz\u0131 devreye al\u0131nd\u0131. Yat\u0131r\u0131m s\u00fcrecinde yerel istihdama \u00f6ncelik verilerek toplam 105 ki\u015finin g\u00f6rev almas\u0131 sa\u011fland\u0131.<\/p>\n<p>4 RES\u2019in kurulmas\u0131 ve Band\u0131rma RES kapasite art\u0131\u015f\u0131 nedeni ile Borusan EnBW Enerji yakla\u015f\u0131k 330 milyon ABD dolar\u0131 yat\u0131r\u0131m yapacak. Avrupa\u2019n\u0131n en b\u00fcy\u00fck karasal r\u00fczg\u00e2r enerji yat\u0131r\u0131mlar\u0131ndan birini olu\u015fturan bu projeler tamamland\u0131\u011f\u0131nda Borusan EnBW Enerji, kurulu r\u00fczg\u00e2r g\u00fcc\u00fc a\u00e7\u0131s\u0131ndan T\u00fcrkiye\u2019nin lider r\u00fczgar enerjisi \u00fcreticilerinden biri olacak. Hizmete giren Tekirda\u011f Balabanl\u0131 RES ve temeli at\u0131lan yeni yat\u0131r\u0131mlarla birlikte Borusan EnBW Enerji T\u00fcrkiye\u2019ye toplam 257 MW ilave kurulu r\u00fczg\u00e2r enerjisi g\u00fcc\u00fc kazand\u0131rm\u0131\u015f olacak.<\/p>\n<p>Haberin devam\u0131 i\u00e7in <a href=\"http:\/\/www.sabah.com.tr\/Ekonomi\/2014\/09\/12\/borusandan-yenilenebilir-enerji-atagi\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>\n<p>Kaynak: Sabah<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Borusan EnBW Enerji, r\u00fczg\u00e2r enerjisinde 257 MW\u2019l\u0131k ilave kurulu g\u00fcc\u00fc T\u00fcrkiye\u2019ye kazand\u0131racak 330 milyon dolar tutar\u0131nda bir yat\u0131r\u0131m ger\u00e7ekle\u015ftirdi. Bu yenilenebilir enerji yat\u0131r\u0131m\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31405,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[18083,14225,958,4427,63,67,1009,165,2689,1301,69,16,18084,358],"views":841,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31404"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31404"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31404\/revisions"}],"predecessor-version":[{"id":31406,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31404\/revisions\/31406"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31405"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31404"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31404"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31404"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}