{"id":31198,"date":"2014-09-07T18:59:54","date_gmt":"2014-09-07T15:59:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31198"},"modified":"2014-09-07T18:59:54","modified_gmt":"2014-09-07T15:59:54","slug":"kangal-ruzgar-santrali-uretimde","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kangal-ruzgar-santrali-uretimde\/","title":{"rendered":"(Turkish) Kangal R\u00fczg\u00e2r Santrali \u00dcretimde!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31198\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ecetur \u015eirketler Grubu`na ait Kangal R\u00fczgar Enerji Santrali`nde 22 t\u00fcrbinden olu\u015fan 44 MW`lik ilk faz \u00fcretime ge\u00e7ti.\u00a0 Ecetur taraf\u0131ndan Sivas`ta Kangal ve G\u00fcr\u00fcn yolu \u00fczerinde geli\u015ftirilen 128 MW`lik Kangal R\u00fczgar Enerji Santrali`nin resmi a\u00e7\u0131l\u0131\u015f\u0131 yap\u0131ld\u0131. A\u00e7\u0131l\u0131\u015f t\u00f6renine kurdeleyi kesenler aras\u0131nda kendisi de G\u00fcr\u00fcnl\u00fc olan Milli Savunma Bakan\u0131 \u0130smet Y\u0131lmaz ile e\u015fi S\u0131vasl\u0131 olan EPDK Ba\u015fkan\u0131 Mustafa Y\u0131lmaz da yer ald\u0131.<\/strong><\/p>\n<p><strong>44 MW`L\u0130K 2. FAZ SENEYE<\/strong> <i><br \/>\n<\/i><br \/>\nToplam 128 MW olarak planlanan ve yakla\u015f\u0131k 180 milyon Euro`luk yat\u0131r\u0131m \u00f6ng\u00f6r\u00fclen Kangal RES`in 22<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-31199\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde-300x214.jpg\" alt=\"kangal-ruzgar-santrali-uretimde\" width=\"300\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde-500x356.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde-70x50.jpg 70w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/kangal-ruzgar-santrali-uretimde.jpg 573w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> t\u00fcrbinden olu\u015fan 44 MW`lik ilk faz\u0131 devreye al\u0131n\u0131rken, 44 MW`lik ikinci faz\u0131n 2015 y\u0131l\u0131nda devreye al\u0131nmas\u0131 hedefleniyor.<\/p>\n<p><strong>VESTAS T\u00dcRB\u0130N KULLANILDI<\/strong><\/p>\n<p>Kangal RES`in ilk faz\u0131nda kullan\u0131lan 22 t\u00fcrbini Danimarka men\u015fe`li Vestas \u015firketi tedarik etti. Yat\u0131r\u0131m\u0131n y\u00fczde 25-30`luk dilimi \u00f6zkaynaklardan kar\u015f\u0131lan\u0131rken, kalan k\u0131sm\u0131n finansman\u0131 ise Alman Landesbank`tan sa\u011flanan kaynakla T\u00fcrkiye \u0130\u015f Bankas\u0131 taraf\u0131ndan yap\u0131land\u0131r\u0131ld\u0131.<\/p>\n<p><strong>KANGAL TERM\u0130K`E BA\u011eLANDI<\/strong><\/p>\n<p>Kangal RES, santral yak\u0131nlar\u0131ndaki Kangal Termik Santrali`ne kadar in\u015fa edilen yakla\u015f\u0131k 7 kilometrelik iletim hatt\u0131yla \u015febekeye ba\u011fland\u0131. Yap\u0131lan hesaplamalara g\u00f6re, Kangal RES`in devreye al\u0131nan ilk faz\u0131 ile 40 bin hane ve yakla\u015f\u0131k 150 milyonluk bir n\u00fcfusun elektrik ihtiyac\u0131 kar\u015f\u0131lanabilecek. B\u00f6ylece y\u0131lda 55 bin tonluk karbondioksit sal\u0131m\u0131n\u0131n \u00f6n\u00fcne ge\u00e7ilecek.<\/p>\n<p><strong>Haberin <a href=\"http:\/\/enerjigunlugu.net\/kangal-ruzg\u00e2r-santrali-uretimde_9997.html\" target=\"_blank\" rel=\"nofollow\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ecetur \u015eirketler Grubu`na ait Kangal R\u00fczgar Enerji Santrali`nde 22 t\u00fcrbinden olu\u015fan 44 MW`lik ilk faz \u00fcretime ge\u00e7ti.\u00a0 Ecetur taraf\u0131ndan Sivas`ta Kangal ve G\u00fcr\u00fcn [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31199,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[17933,68,63,67,1009,165,750,17935,17476,17934,17932,12996,4737,474,69,16,231,4734],"views":1144,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31198"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31198"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31198\/revisions"}],"predecessor-version":[{"id":31200,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31198\/revisions\/31200"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31199"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31198"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31198"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31198"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}