{"id":31117,"date":"2014-09-04T16:27:30","date_gmt":"2014-09-04T13:27:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31117"},"modified":"2014-09-04T16:27:30","modified_gmt":"2014-09-04T13:27:30","slug":"keban-barajinda-1-aylik-su-kaldi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/keban-barajinda-1-aylik-su-kaldi\/","title":{"rendered":"(Turkish) Keban Baraj\u0131\u2019nda 1 Ayl\u0131k Su Kald\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31117\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>F\u0131rat Havzas\u0131\u2019n\u0131n en \u00fcst noktasinda bulunan ve di\u011fer barajlar\u0131n da elektrik \u00fcretimini do\u011frudan etkileyen Keban Baraj\u0131\u2019nda, su miktar\u0131n\u0131n tarihteki \u2018en k\u00f6t\u00fc\u2019 seviyesine indi. Edilenilen bilgiye g\u00f6re, Keban Baraj<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-31118\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi-300x214.jpg\" alt=\"keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi\" width=\"300\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi-300x214.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi-500x358.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/keban-baraji-kuraklik-tehlike-alarm-keban-barajinda-1-aylik-su-kaldi.jpg 546w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131\u2019nda 844 metre olmas\u0131 gerekirken 830 metre su var. Eyl\u00fcl ay\u0131 itibari ile, su seviyesi 13-14 metre a\u015fa\u011f\u0131da bulunuyor.<\/strong><\/p>\n<p>Keban Baraj\u0131\u2019nda, elektrik \u00fcretiminde ge\u00e7en y\u0131l\u0131n ilk 8 ay\u0131na g\u00f6re y\u00fczde 30 d\u00fc\u015f\u00fc\u015f\u00a0 oldu. Ge\u00e7ti\u011fimiz y\u0131l 3 milyar kilovat saat enerji \u00fcretilen santralde, takriben 2,1 milyar kilovat saat enerji \u00fcretildi.<\/p>\n<p>G\u00f6l\u00fcn minimum i\u015fletme kotu 820 metre, beklenen ya\u011f\u0131\u015flar\u0131n d\u00fc\u015fmemesi halinde bu seviyeden sonra elektrik enerjisi \u00fcretimine ara vermek durumunda kal\u0131nacak. Mevcut su miktar\u0131, tam kapasite \u00e7al\u0131\u015f\u0131lmas\u0131 halinde 1 ay gibi k\u0131sa bir s\u00fcrede bitecek.<\/p>\n<p>Uzmanlar, bir dahaki y\u0131l kullan\u0131lacak suyu da hesaba katarak \u015fimdiden bu konuda \u00f6nlem al\u0131nmas\u0131 gerekti\u011fini ve sudan elektrik \u00fcretiminin azalt\u0131lmas\u0131 gerekti\u011fini belirtiyor.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.F\u0131rat Havzas\u0131\u2019n\u0131n en \u00fcst noktasinda bulunan ve di\u011fer barajlar\u0131n da elektrik \u00fcretimini do\u011frudan etkileyen Keban Baraj\u0131\u2019nda, su miktar\u0131n\u0131n tarihteki \u2018en k\u00f6t\u00fc\u2019 seviyesine indi. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31118,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[63,67,1009,165,16204,17103,17861,12313,99],"views":718,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31117"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31117"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31117\/revisions"}],"predecessor-version":[{"id":31119,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31117\/revisions\/31119"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31118"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31117"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31117"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31117"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}