{"id":31030,"date":"2014-09-01T19:01:07","date_gmt":"2014-09-01T16:01:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=31030"},"modified":"2014-09-01T19:01:07","modified_gmt":"2014-09-01T16:01:07","slug":"akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi\/","title":{"rendered":"(Turkish) Akfen&#8217;in Do\u011fan\u00e7ay HES 2 Projesi Enerji \u00dcretimine Ba\u015flad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/31030\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Sakarya\u2019da bulunan Do\u011fan\u00e7ay HES 2&#8217;nin \u00fcretime ba\u015flamas\u0131yla Akfen HES, faaliyet g\u00f6sterdi\u011fi 10 hidroelektrik santralinde toplam 154,6 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 659,6 GWs \u00fcretim kapasitesine ula\u015ft\u0131.<\/strong><\/p>\n<p>Akfen Holding&#8217;e ba\u011fl<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-31031\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi-300x192.jpg\" alt=\"akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi\" width=\"300\" height=\"192\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi-300x192.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi-500x321.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/09\/akfenin-dogancay-hes-2-projesi-enerji-uretimine-basladi.jpg 521w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131 Akfenhes Yat\u0131r\u0131mlar\u0131 ve Enerji \u00dcretim A.\u015e.&#8217;nin ba\u011fl\u0131 ortakl\u0131\u011f\u0131 Elen Enerji \u00dcretimi San. Tic. A.\u015e.&#8217;nin, Sakarya ilinde bulunan Do\u011fan\u00e7ay HES 2 projesi enerji \u00fcretimine ba\u015flad\u0131.<\/p>\n<p>Enerji Piyasas\u0131 D\u00fczenleme Kurulu (EPDK) taraf\u0131ndan verilen izinle \u00fcretime ge\u00e7en 15,1 MW kurulu g\u00fc\u00e7 kapasitesine sahip \u00fc\u00e7 \u00fcniteden olu\u015fan Do\u011fan\u00e7ay HES 2\u2019nin 10,1 MW kurulu g\u00fcce sahip y\u0131ll\u0131k 59 GWs elektrik \u00fcretmesi beklenen iki \u00fcnitesi 29 A\u011fustos 2014 tarihi itibariyle ticari enerji \u00fcretimine ba\u015flad\u0131.<\/p>\n<p>Akfen Holding, 29 A\u011fustos 2014 tarihi itibariyle, ba\u011fl\u0131 ortakl\u0131klar\u0131 vas\u0131tas\u0131yla faaliyet g\u00f6sterdi\u011fi 10 hidroelektrik santralinde toplam 154,6 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam 659,6 GWs \u00fcretim kapasitesine ula\u015ft\u0131.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Sakarya\u2019da bulunan Do\u011fan\u00e7ay HES 2&#8217;nin \u00fcretime ba\u015flamas\u0131yla Akfen HES, faaliyet g\u00f6sterdi\u011fi 10 hidroelektrik santralinde toplam 154,6 MW kurulu g\u00fc\u00e7 kapasitesine ve y\u0131ll\u0131k toplam [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":31031,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[3936,1207,3939,17783,63,67,1009,165,18,35370,1090],"views":1262,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31030"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=31030"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31030\/revisions"}],"predecessor-version":[{"id":31032,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/31030\/revisions\/31032"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/31031"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=31030"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=31030"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=31030"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}