{"id":30993,"date":"2014-08-31T13:59:52","date_gmt":"2014-08-31T10:59:52","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30993"},"modified":"2014-08-31T13:59:52","modified_gmt":"2014-08-31T10:59:52","slug":"dev-ruzgar-turbini-aliagada-kuruldu","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dev-ruzgar-turbini-aliagada-kuruldu\/","title":{"rendered":"(Turkish) Dev R\u00fczgar T\u00fcrbini Alia\u011fa\u2019da Kuruldu!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30993\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Avrupa\u2019da ve \u00f6zellikle Almanya\u2019da b\u00fcy\u00fck ilgi g\u00f6ren Nordex\u2019in N117\/2400 modelinin ilk t\u00fcrbinleri \u0130zmir Alia\u011fa\u2019da kuruldu.<\/strong><\/p>\n<p>Ak\u00e7a Holding\u2019e ait olan Alia\u011fa projesinde 4 adet N117\/2400 r\u00fczgar t\u00fcrbini kullan\u0131ld\u0131. Mevsimsel anlamda r\u00fczgarl\u0131 bir d\u00f6nem ya\u015fayan sahada montaj s\u00fcresi 25 g\u00fcn s\u00fcrd\u00fc. 8 ki\u015filik deneyimli bir montaj ekibinin sahada haz\u0131r bulunmas\u0131 \u00e7al\u0131\u015fmalara h\u0131z verdi. Kule y\u00fcksekli\u011fi i\u00e7in 91m kule tercih edilen projede montaj s\u0131ras\u0131nda 600 tonluk paletli vin\u00e7 kullan\u0131l<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/dev-ruzgar-turbini-aliagada-kuruldu.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-30994 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/dev-ruzgar-turbini-aliagada-kuruldu.jpg\" alt=\"dev-ruzgar-turbini-aliagada-kuruldu\" width=\"300\" height=\"235\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/dev-ruzgar-turbini-aliagada-kuruldu.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/dev-ruzgar-turbini-aliagada-kuruldu-63x50.jpg 63w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>d\u0131.<\/p>\n<p>Nordex\u2019in projeden sorumlu Proje M\u00fcd\u00fcr\u00fc, Serkan Karaman yapt\u0131\u011f\u0131 a\u00e7\u0131klamada, proje ile ilgili : \u201c58.5m\u2019lik dev kanatlar T\u00fcrkiye i\u00e7in bir ilk ve bu ilk deneyimin verdi\u011fi sorumluluk bilinci ile her hareketimizi saha m\u00fcd\u00fcr\u00fcm\u00fcz Ersin Okuyucu ile birlikte \u00e7ok iyi planlad\u0131k. 58.5m\u2019lik kanatlar Nordex\u2019in ba\u015far\u0131l\u0131 tasar\u0131m\u0131 sayesinde 50m\u2019lik kanatlarla ayn\u0131 a\u011f\u0131rl\u0131\u011fa sahip ancak elbette r\u00fczgar hacmini kar\u015f\u0131layan kanat alan\u0131 daha fazla oldu\u011fu i\u00e7in, daha dikkatli davranmam\u0131z gerekiyordu. Bu sebeple, kanat montaj\u0131 s\u0131ras\u0131nda r\u00fczgar h\u0131z\u0131n\u0131n 5m\/s\u2019yi ge\u00e7memesine dikkat ettik. Durum b\u00f6yle olunca, \u00e7al\u0131\u015fma saatlerimizi 2 saat geriye \u00e7ekerek, sabah saatlerinde montaj yapmaya \u00f6zen g\u00f6sterdik.\u201d bilgilerini verdi.<\/p>\n<p>Alia\u011fa RES, yenilenebilir enerji yat\u0131r\u0131mlar\u0131na ivme kazand\u0131ran Ak\u00e7a Holding\u2019in ilk r\u00fczgar enerjisi projesi olacak. Proje M\u00fcd\u00fcr\u00fc G\u00f6khan Avdan yapt\u0131\u011f\u0131 a\u00e7\u0131klamada: \u201c\u00dclkemize kazand\u0131r\u0131lan bu projede, sekt\u00f6r\u00fcn en verimli t\u00fcrbinleriyle, do\u011fal kaynaklar\u0131m\u0131zdan en y\u00fcksek seviyede faydalanmak ama\u00e7land\u0131 ve t\u00fcrbin tedari\u00e7imiz Nordex ba\u015fta olmak \u00fczere, r\u00fczgar sekt\u00f6r\u00fcn\u00fcn tecr\u00fcbeli firmalar\u0131 ile \u00e7al\u0131\u015f\u0131ld\u0131. T\u00fcm in\u015faat, montaj ve elektrik alt yap\u0131 i\u015fleri s\u00fcresince do\u011faya da en y\u00fcksek \u00f6zen g\u00f6sterilerek, tek bir a\u011faca dahi zarar vermeden proje tamamland\u0131.\u201d \u015feklinde konu\u015ftu.<\/p>\n<p>N117\/2400, rotor \u00e7ap\u0131 itibariyle T\u00fcrkiye\u2019de bug\u00fcne kadar kurulumu yap\u0131lan en b\u00fcy\u00fck t\u00fcrbin olma \u00f6zelli\u011fini g\u00f6steriyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/energyworld.com.tr\/dev-ruzgar-turbini-aliagada-kuruldu.html\" target=\"_blank\" rel=\"nofollow\">Energy World<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Avrupa\u2019da ve \u00f6zellikle Almanya\u2019da b\u00fcy\u00fck ilgi g\u00f6ren Nordex\u2019in N117\/2400 modelinin ilk t\u00fcrbinleri \u0130zmir Alia\u011fa\u2019da kuruldu. Ak\u00e7a Holding\u2019e ait olan Alia\u011fa projesinde 4 adet [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30994,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[12093,2783,17752,63,67,1009,165,2689,15890,2455,1190,474,69,16,324,1286],"views":1346,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30993"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30993"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30993\/revisions"}],"predecessor-version":[{"id":30995,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30993\/revisions\/30995"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30994"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30993"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30993"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30993"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}