{"id":30971,"date":"2014-08-31T13:09:07","date_gmt":"2014-08-31T10:09:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30971"},"modified":"2014-08-31T13:14:20","modified_gmt":"2014-08-31T10:14:20","slug":"jantsanin-ges-yatirimi-onaylandi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/jantsanin-ges-yatirimi-onaylandi\/","title":{"rendered":"(Turkish) Jantsa`n\u0131n GES Yat\u0131r\u0131m\u0131 Onayland\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30971\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Jantsa`n\u0131n 1 MW lisanss\u0131z G\u00fcne\u015f Enerjisi Santrali yat\u0131r\u0131m\u0131 onaylanarak resmi kabul\u00fc yap\u0131ld\u0131. Jantsa`dan konu ile ilgili KAP`a yap\u0131lan a\u00e7\u0131klamada, Jantsa, fabrika \u00e7at\u0131s\u0131na, Bereket Enerji Grup \u015eirketlerind<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/jantsanin-ges-yatirimi-onaylandi.jpg\"><img loading=\"lazy\" class=\"alignleft wp-image-30972 size-full\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/jantsanin-ges-yatirimi-onaylandi.jpg\" alt=\"jantsanin-ges-yatirimi-onaylandi\" width=\"262\" height=\"160\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/jantsanin-ges-yatirimi-onaylandi.jpg 262w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/jantsanin-ges-yatirimi-onaylandi-80x48.jpg 80w\" sizes=\"(max-width: 262px) 100vw, 262px\" \/><\/a><strong>en GDZ Enerji Yat\u0131r\u0131m A.\u015e.`ye 1 MW\u2019l\u0131k lisanss\u0131z g\u00fcne\u015f enerjisi santrali yat\u0131r\u0131m\u0131n\u0131 TEDA\u015e\u2019\u0131n onaylad\u0131\u011f\u0131 bildirildi.<\/strong><\/p>\n<p>A\u00e7\u0131klamada, &#8220;\u015eirketimizin 1 MW lisanss\u0131z G\u00fcne\u015f Enerjisi Santrali yat\u0131r\u0131m\u0131 TEDA\u015e`\u0131n 22.08.2014 tarih 14.LUY.GES.09.0002 say\u0131l\u0131 yaz\u0131lar\u0131 ile onaylanm\u0131\u015f ve devrede olan santralimizin resmi kabul\u00fc yap\u0131lm\u0131\u015ft\u0131r.&#8221; denildi.<\/p>\n<p>\u015eirket elektrik giderinin yakla\u015f\u0131k y\u00fczde 20`sini 54.105 metrekare kapal\u0131 alan fabrika \u00e7at\u0131s\u0131 \u00fczerinde kurduraca\u011f\u0131 g\u00fcne\u015f panelleri ile kar\u015f\u0131lamay\u0131 hedefliyor. Santralin yat\u0131r\u0131m bedeli 910.000 Euro.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/jantsanin-ges-yatirimi-onaylandi_9848.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Jantsa`n\u0131n 1 MW lisanss\u0131z G\u00fcne\u015f Enerjisi Santrali yat\u0131r\u0131m\u0131 onaylanarak resmi kabul\u00fc yap\u0131ld\u0131. Jantsa`dan konu ile ilgili KAP`a yap\u0131lan a\u00e7\u0131klamada, Jantsa, fabrika \u00e7at\u0131s\u0131na, Bereket [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30972,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,2326,227,13,2569,17739,1216],"views":535,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30971"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30971"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30971\/revisions"}],"predecessor-version":[{"id":30977,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30971\/revisions\/30977"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30972"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30971"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30971"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30971"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}