{"id":30919,"date":"2014-08-28T20:16:40","date_gmt":"2014-08-28T17:16:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30919"},"modified":"2014-08-28T20:16:40","modified_gmt":"2014-08-28T17:16:40","slug":"alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi\/","title":{"rendered":"(Turkish) Alstom, Zetes-3 Termik Santrali 400 kV Gaz-Yal\u0131t\u0131ml\u0131 Trafo Merkezi&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30919\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alstom, 2 x 700 MW\u2019l\u0131k Zetes-3 Termik Santrali\u2019nin enterkonnekte sisteme ba\u011flant\u0131s\u0131n\u0131 sa\u011flamak i\u00e7in Eren Enerji End\u00fcstrisi A.\u015e. ile s\u00f6zle\u015fme imzalad\u0131.<span id=\"more-66923\"><\/span> Bedeli yakla\u015f\u0131k 10 milyon Euro olan s\u00f6zle\u015fme kapsam\u0131nda Alstom; anahtar teslim 400 kV GIS trafo merkezi sa\u011flayarak merkezin t\u00fcm m\u00fchendislik, tedarik, in\u015faat ve devreye alma \u00e7al\u0131\u015fmalar\u0131n\u0131 y\u00fcr\u00fctecek. Eren Enerji\u2019nin \u00fc\u00e7\u00fcnc\u00fc Termik santral projesi olan bu proje, enerji alan\u0131nda son y\u0131llarda imzalanm\u0131\u015f en b\u00fcy\u00fck projelerden biri olma \u00f6zelli\u011fini ta\u015f\u0131yor.<\/strong><\/p>\n<p>Eren Enerji \u00f6nceki y\u0131llarda yine Zonguldak\u2019ta, 160 MW\u2019l\u0131k ZETES-1\u2019i ve ard\u0131ndan 2\u00d7615 MW\u2019l\u0131k g\u00fcc\u00fcyle \u00fclkeni<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-30920\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi-300x207.jpg\" alt=\"alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi\" width=\"300\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi-500x345.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-zetes-3-termik-santrali-400-kv-gaz-yalitimli-trafo-merkezi.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>n en verimli santrallerinden olan ZETES-2\u2019yi faaliyete ge\u00e7irmi\u015fti. Alstom, Zetes-2 santraline de anahtar teslimi 400 kV GIS merkezi sa\u011flayarak elektrik iletimini \u00fcstlenmi\u015fti.<\/p>\n<p>Alstom Grid G\u00fcney Avrupa ve Orta Asya B\u00f6lge Sat\u0131\u015f Ba\u015fkan Yard\u0131mc\u0131s\u0131 Tun\u00e7 Tezel, \u201cEren Enerji taraf\u0131ndan ikinci kez se\u00e7ilmenin gururunu ya\u015f\u0131yoruz. Ge\u00e7mi\u015f projedeki performans\u0131m\u0131z, ekipmanlar\u0131m\u0131z\u0131n g\u00fcvenilirli\u011fi ve bunlara ilaveten m\u00fc\u015fteri odakl\u0131 yakla\u015f\u0131m\u0131m\u0131z ve projedeki gerek teknik gerekse ticari anlamda verdi\u011fimiz destek bize ba\u015far\u0131y\u0131 getirdi. T\u00fcrkiye\u2019deki enerji iletimi pazar\u0131n\u0131n \u00f6n\u00fcm\u00fczdeki 3 y\u0131lda %4 oran\u0131nda b\u00fcy\u00fcmesi bekleniyor, biz de g\u00fcvenilir bir \u00e7\u00f6z\u00fcm orta\u011f\u0131 olarak bu b\u00fcy\u00fcmeye katk\u0131da bulunmaya haz\u0131r\u0131z\u201d dedi.<\/p>\n<p>T\u00fcrkiye\u2019deki enerji iletimi faaliyetlerine 1966 y\u0131l\u0131nda ba\u015flayan Alstom, sa\u011flad\u0131\u011f\u0131 y\u00fcksek gerilim \u00fcr\u00fcnler ve anahtar teslimi sistemlerle T\u00fcrkiye\u2019nin kurulu elektrik iletim g\u00fcc\u00fcn\u00fcn y\u00fczde 50\u2019sinden fazlas\u0131n\u0131 kar\u015f\u0131l\u0131yor. Gebze\u2019de d\u00fcnyan\u0131n en b\u00fcy\u00fcklerinden biri ve alan\u0131nda T\u00fcrkiye ihracat \u015fampiyonu olan G\u00fc\u00e7 Transformat\u00f6rleri fabrikas\u0131 bulunan firman\u0131n \u00fclkede yakla\u015f\u0131k 1.100 \u00e7al\u0131\u015fan\u0131 bulunuyor. T\u00fcrkiye, 2011 y\u0131l\u0131ndan beri Alstom Grid G\u00fcney Avrupa ve Orta Asya B\u00f6lgesi\u2019nin merkezi konumunda, Portekiz\u2019den K\u0131rg\u0131zistan\u2019a uzanan b\u00f6lgedeki 26 \u00fclke T\u00fcrkiye\u2019den y\u00f6netiliyor.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alstom, 2 x 700 MW\u2019l\u0131k Zetes-3 Termik Santrali\u2019nin enterkonnekte sisteme ba\u011flant\u0131s\u0131n\u0131 sa\u011flamak i\u00e7in Eren Enerji End\u00fcstrisi A.\u015e. ile s\u00f6zle\u015fme imzalad\u0131. Bedeli yakla\u015f\u0131k 10 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30920,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[9503,12984,63,67,1009,165,17695,17696,17697,17698],"views":1445,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30919"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30919"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30919\/revisions"}],"predecessor-version":[{"id":30921,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30919\/revisions\/30921"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30920"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30919"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30919"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30919"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}