{"id":30913,"date":"2014-08-28T20:07:33","date_gmt":"2014-08-28T17:07:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30913"},"modified":"2014-08-28T20:07:33","modified_gmt":"2014-08-28T17:07:33","slug":"akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti\/","title":{"rendered":"(Turkish) Akenerji\u2019nin Erzin Santrali 1.551 MW \u00dcretim G\u00fcc\u00fcne Ula\u015ft\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30913\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akenerji\u2019nin 904 MW g\u00fcc\u00fcndeki en b\u00fcy\u00fck projesi olan Egemer \u2013 Erzin Do\u011falgaz Kombine \u00c7evrim Santrali\u2019nin y\u00fcklenici konsorsiyumdan ge\u00e7ici kabul\u00fc 27 A\u011fustos 2014\u2019de ger\u00e7ekle\u015fti.<span id=\"more-66919\"><\/span> B\u00f6ylece Akenerji, Erzin Do\u011falgaz \u00c7evrim Santrali ile yakla\u015f\u0131k 1.551 MW \u00fcretim g\u00fcc\u00fcne ula\u015ft\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-30914\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti-300x184.jpg\" alt=\"akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti\" width=\"300\" height=\"184\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti-300x184.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti-500x307.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/akenerjinin-erzin-santrali-1-551-mw-uretim-gucune-ulasti.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Santralin, \u201cEPC-Ge\u00e7ici Kabul Tutana\u011f\u0131\u201d GE Energy Products France SNC, Gama Ltd, Gama G\u00fc\u00e7 Sistemleri M\u00fchendislik ve Taahh\u00fct A.\u015e. ve General Elektrik Ticaret ve Servis A.\u015e y\u00fcklenici konsorsiyum yetkililerine verildi.<\/p>\n<p>Hatay\u2019\u0131n Erzin il\u00e7esinde, 2011 y\u0131l\u0131 sonunda in\u015faat\u0131na ba\u015flanan bu santral yat\u0131r\u0131m\u0131yla b\u00f6lgeye; \u00e7evreyle dost ve y\u00fcksek verimlili\u011fe sahip, AB norm ve standartlar\u0131nda \u00e7a\u011fda\u015f bir enerji santrali kazand\u0131r\u0131lm\u0131\u015f ve 900 milyon dolarl\u0131k yat\u0131r\u0131m getirilmi\u015ftir.<\/p>\n<p>Erzin Santrali, devreye girmesiyle y\u0131ll\u0131k ortalama 6,75 milyar kWh elektrik \u00fcretecek. Bu \u00fcretimi ile Erzin Santrali T\u00fcrkiye\u2019nin toplam elektrik ihtiyac\u0131n\u0131n y\u00fczde 2,6\u2019s\u0131n\u0131 tek ba\u015f\u0131na kar\u015f\u0131layabilecek.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akenerji\u2019nin 904 MW g\u00fcc\u00fcndeki en b\u00fcy\u00fck projesi olan Egemer \u2013 Erzin Do\u011falgaz Kombine \u00c7evrim Santrali\u2019nin y\u00fcklenici konsorsiyumdan ge\u00e7ici kabul\u00fc 27 A\u011fustos 2014\u2019de ger\u00e7ekle\u015fti. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30914,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,51,53],"tags":[3762,17689,19,63,67,1009,2838,165,17690],"views":1150,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30913"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30913"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30913\/revisions"}],"predecessor-version":[{"id":30915,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30913\/revisions\/30915"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30914"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30913"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30913"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30913"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}