{"id":30853,"date":"2014-08-26T20:37:08","date_gmt":"2014-08-26T17:37:08","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30853"},"modified":"2014-08-26T20:37:23","modified_gmt":"2014-08-26T17:37:23","slug":"alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti\/","title":{"rendered":"(Turkish) Alstom 800 Milyon Euro\u2019luk HVDC S\u00f6zle\u015fmelerine \u0130mza Att\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30853\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alstom Grid, toplam 800 milyon Euro de\u011ferinde (bu tutar\u0131n yakla\u015f\u0131k olarak yar\u0131s\u0131, mevcut mali y\u0131l\u0131n birinci \u00fc\u00e7 ayl\u0131k d\u00f6neminde kaydedildi, di\u011fer yar\u0131s\u0131 ise ikinci \u00fc\u00e7 ayl\u0131k d\u00f6neminde kaydedilecek) \u00fc\u00e7 b\u00fcy\u00fck Y\u00fcksek Gerilim Do\u011fru Ak\u0131m (HVDC) s\u00f6zle\u015fmesine imza att\u0131.<span id=\"more-66888\"><\/span> Bu HVDC projeleri k\u0131talararas\u0131 enerji ticaretinin yolunu a\u00e7arak Hindistan\u2019daki y\u00fcksek hacimli enerji iletimi i\u00e7in enerji koridorlar\u0131 olu\u015fturacak, bir G\u00fcney Kore \u015fehrinin merkezine enerji getirecek ve Atlantik Kanada\u2019daki yenilenebilir enerji kaynaklar\u0131n\u0131 entegre edecek.<\/strong><\/p>\n<p>HVDC, do\u011fru ak\u0131m yoluyla uzun mesafeler boyunca etkin, y\u00fcksek hacimli enerji iletimi sa\u011flayan bir teknolojidir. \u00c7evresel etkiyi en aza indirirken mevcut \u015febekeleri g\u00fc\u00e7lendirerek, konvansiyonel alternatif ak\u0131m teknolojisinden y\u00fczde 30 daha fazla enerji iletir.<\/p>\n<h2>Yo\u011fun n\u00fcfuslu bir G\u00fcney Kore \u015fehrinin merkezinde Alstom teknolojisi<\/h2>\n<p>Alstom, Seoul b\u00f6lgesinde 33 km\u2019lik bir enerji koridoruna ekipman tasarlamak ve tedarik etmek i\u00e7in ortak giri\u015fimi KEPCO-Alstom Power Electronics Systems (KAPES) arac\u0131l\u0131\u011f\u0131yla bir HVDC Hat Kom\u00fctat\u00f6rl\u00fc Konvert\u00f6r (LCC) projesi kazand\u0131. 1.5 GW g\u00fc\u00e7 kapasitesine sahip \u00b1500 k<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-30854\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti-300x222.jpg\" alt=\"alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti\" width=\"300\" height=\"222\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti-300x222.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti-500x370.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti-67x50.jpg 67w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>V HVDC ba\u011flant\u0131s\u0131, G\u00fcney Kore\u2019nin bat\u0131s\u0131nda yer alan Dangjin santrali taraf\u0131ndan \u00fcretilen enerjiyi Dangjin\u2019in do\u011fusunda yer alan yo\u011fun n\u00fcfuslu Pyeongtaek b\u00f6lgesine iletecek.<\/p>\n<p>G\u00fcney Kore, son on y\u0131l i\u00e7inde elektrik talebindeki y\u00fczde 25\u2019lik art\u0131\u015f\u0131 tek ba\u015f\u0131na kar\u015f\u0131lama m\u00fccadelesi veriyor. Kore, ekonominin s\u00fcrd\u00fcrelebilirli\u011fi i\u00e7in ihtiya\u00e7 duyulan elektri\u011fi iletmek amac\u0131yla esnek bir iletim \u015febekesi in\u015fa etmeye devam etti\u011finden HVDC giderek artan bir \u015fekilde yerle\u015fim b\u00f6lgeleri i\u00e7in enerji sa\u011flamak amac\u0131yla kullan\u0131lacak.<\/p>\n<p>Alstom Grid G\u00fc\u00e7 Elektroni\u011fi ve Otomasyon K\u0131demli Ba\u015fkan Yard\u0131mc\u0131s\u0131 Patrick Plas; \u201cAlstom Kore\u2019nin b\u00fcy\u00fcyen enerji ekonomisine katk\u0131 sa\u011flamaktan gurur duyuyor. Bu proje, KEPCO ile Alstom aras\u0131ndaki ortak giri\u015fim ve ortak geli\u015ftirme \u00e7abalar\u0131n\u0131n bir meyvesi; bu proje ile Alstom, Asya\u2019daki HVDC varl\u0131\u011f\u0131n\u0131 artt\u0131racak ve KEPCO, Alstom\u2019un d\u00fcnya genelindeki sanayi lideri HVDC teknolojileri ve uzmanl\u0131\u011f\u0131ndan yararlanacak \u201d dedi.<\/p>\n<p>Kore\u2019de, Alstom, HVDC teknolojilerinde tan\u0131nm\u0131\u015f bir kilit oyuncu. \u015eirket, 1990\u2019lar\u0131n sonunda G\u00fcney Kore\u2019nin Jeju adas\u0131n\u0131 101 kilometre boyunca anakaraya ba\u011flayan deniz alt\u0131 ba\u011flant\u0131s\u0131 i\u00e7in orijinal 300 MW HVDC \u00e7ift kutuplu ba\u011flant\u0131y\u0131 sa\u011flad\u0131. 2009\u2019da, Alstom, yap\u0131m\u0131 2014 y\u0131l\u0131nda tamamlanan, \u00e7ift kutuplu d\u00fczende 400 MW HVDC i\u00e7in yeni konvert\u00f6r istasyonlar\u0131n\u0131 temin etmek \u00fczere ikinci bir s\u00f6zle\u015fme kazand\u0131.<\/p>\n<h2>Alstom, Kanada\u2019da uzun d\u00f6nemli enerji ihracat\u0131 i\u00e7in Newfoundland ve Labrador vakf\u0131n\u0131 destekliyor<\/h2>\n<p>Nalcor Energy, Alstom\u2019la, Labrador Adas\u0131 \u0130letim Ba\u011flant\u0131s\u0131 i\u00e7in a\u015fa\u011f\u0131daki \u00f6zelliklere sahip noktadan noktaya (point-to-point) bir HVDC \u00e7\u00f6z\u00fcm\u00fc tasarlamak, tedarik etmek ve kurmak \u00fczere \u00b1350 kV \u00e7ift kutuplu bir HVDC (LCC) anahtar teslim s\u00f6zle\u015fme imzalad\u0131:<\/p>\n<p>\u2022 Alternatif ak\u0131m\u0131 do\u011fru ak\u0131ma ve do\u011fru ak\u0131m\u0131 alternatif ak\u0131ma d\u00f6n\u00fc\u015ft\u00fcrmek i\u00e7in Muskrat Falls ve St.John\u2019s yak\u0131nlar\u0131ndaki Soldiers Pond yak\u0131n\u0131nda yer alan iki LCC (Hat Kom\u00fctat\u00f6rl\u00fc Konvert\u00f6r) istasyonu,<\/p>\n<p>\u2022 Bo\u011faz\u0131 ge\u00e7en deniz alt\u0131 kablolar\u0131n\u0131 karadaki havai iletim hatlar\u0131na ba\u011flamak i\u00e7in Belle Isle Bo\u011faz\u0131\u2019n\u0131n her iki k\u0131y\u0131s\u0131nda iki kablo birle\u015fimi<\/p>\n<p>Nalcor Energy\u2019nin Lower Churchill Projesinin par\u00e7as\u0131 olan iletim ba\u011flant\u0131s\u0131, Labrador Happy Valley-Goose Bay yak\u0131n\u0131ndaki Muskrat Falls\u2019tan Newfoundland Soldiers Pond\u2019a kadar 1.100 km uzanacak olup, 824 megawatt\u2019l\u0131k Muskrat Falls Projesinden Newfoundland adas\u0131na hidro enerji iletecek.<\/p>\n<p>Nalcor Energy Lower Churchill Projesi Ba\u015fkan Yard\u0131mc\u0131s\u0131 Gilbert Bennett \u201cMuskrat Falls Projesinin geli\u015ftirilmesinde Alstom\u2019la \u00e7al\u0131\u015fmaktan memnunuz. Bu proje, onlarca y\u0131l boyunca de\u011ferli bir enerji \u00fcretim unsuru olacak. Ayn\u0131 zamanda, Newfoundland ve Labrador ekonomisi ve i\u015f g\u00fcc\u00fcne CAD 2.6 milyar girdi dahil olmak \u00fczere \u00f6nemli istihdam ve ekonomik faydalar da sa\u011flayacak\u201d dedi.<\/p>\n<p>Labrador Adas\u0131 \u0130letim Ba\u011flant\u0131s\u0131, Newfoundland ve Labrador\u2019a y\u00f6nelik enerji iletimi i\u00e7in \u00f6nemli olup, temiz enerji ticaretine y\u00f6nelik Kanada ile Birle\u015fik Devletler aras\u0131ndaki gelecekteki enerji koridorunun temelini kurmaya yard\u0131mc\u0131 olacak.<\/p>\n<h2>Alstom Hindistan\u2019\u0131n enerji koridorunun ikinci a\u015famas\u0131n\u0131 ger\u00e7ekle\u015ftirmeye ba\u015fl\u0131yor<\/h2>\n<p>2012 y\u0131l\u0131nda Power Grid Corporation of India Limited (PGCIL) \u015firketinin \u00b1800 kV 3000 MW Ultra Y\u00fcksek Gerilim Do\u011fru Ak\u0131m (UHVDC) projesinin ilk a\u015famas\u0131na ait s\u00f6zle\u015fmesinin kazan\u0131lmas\u0131n\u0131n ard\u0131ndan Alstom, bu b\u00fcy\u00fck projenin, Champa\u2019y\u0131 \u00b1800 kV 3000 MW UHVDC ile Kurukshetra\u2019ya ba\u011flayan ikinci a\u015famas\u0131n\u0131 da kazand\u0131. Bu iki a\u015fama ile Alstom\u2019un geli\u015fmi\u015f UHVDC sistemi, verimli bir \u201cenerji koridoru\u201d olu\u015fturarak merkez b\u00f6lgedeki \u00fcretim merkezinden \u00fclkenin kuzey b\u00f6lgesindeki y\u00fck merkezine \u00b1800 kV DC\u2019de 6000 MW y\u00fcksek hacimli enerji aktar\u0131m\u0131n\u0131 sa\u011flayacak.<\/p>\n<p>Alstom, 1996 y\u0131l\u0131ndan bu yana Hindistan\u2019da, Hindistan \u015febekesinde b\u00f6lgeler aras\u0131 y\u00fcksek hacimli enerji ak\u0131\u015f\u0131n\u0131 iyile\u015ftirmek amac\u0131yla d\u00f6rt elektriksel b\u00f6lgenin ba\u011fland\u0131\u011f\u0131 \u00fc\u00e7 back-to-back HVDC ba\u011flant\u0131s\u0131 sa\u011flayan \u00f6nc\u00fc bir firma oldu.<\/p>\n<p>Alstom Grid, 50 y\u0131l\u0131 a\u015fk\u0131n deneyimiyle HVDC teknolojisi sa\u011flayan d\u00fcnya genelindeki ilk \u00fc\u00e7 firmadan biri. Brezilya\u2019daki 2375 km\u2019lik (3150 MW, 600 kV) d\u00fcnyan\u0131n en uzun HVDC iletim sistemi ile Hindistan\u2019daki (3000 MW) ilk ve en y\u00fcksek de\u011ferdeki 800 kV UHVDC ba\u011flant\u0131s\u0131 gibi anahtar stratejik ba\u011flant\u0131larla d\u00fcnya genelinde 35.000 MW\u2019nin \u00fczerinde ba\u011flant\u0131 kapasitesi sa\u011flad\u0131. Alstom, ayn\u0131 zamanda \u00c7in\u2019de 660 kV HVDC sistemi ile Fransa ve Birle\u015fik Krall\u0131k aras\u0131nda deniz alt\u0131 ba\u011flant\u0131s\u0131 (2000 MW) da kurdu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/08\/26\/alstom-800-milyon-euroluk-hvdc-sozlesmelerine-imza-atti\/\" target=\"_blank\" rel=\"nofollow\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alstom Grid, toplam 800 milyon Euro de\u011ferinde (bu tutar\u0131n yakla\u015f\u0131k olarak yar\u0131s\u0131, mevcut mali y\u0131l\u0131n birinci \u00fc\u00e7 ayl\u0131k d\u00f6neminde kaydedildi, di\u011fer yar\u0131s\u0131 ise [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30854,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[9503,63,67,1009,11901,17634,165,17635,17636,17637,508,17638],"views":691,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30853"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30853"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30853\/revisions"}],"predecessor-version":[{"id":30855,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30853\/revisions\/30855"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30854"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30853"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30853"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30853"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}