{"id":30822,"date":"2014-08-25T17:44:56","date_gmt":"2014-08-25T14:44:56","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30822"},"modified":"2014-08-25T17:44:56","modified_gmt":"2014-08-25T14:44:56","slug":"toyotanin-enerjisinin-10%e2%80%b2u-13-bin-gunes-panelinden-karsilanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/toyotanin-enerjisinin-10%e2%80%b2u-13-bin-gunes-panelinden-karsilanacak\/","title":{"rendered":"(Turkish) Toyota&#8217;n\u0131n Enerjisinin % 10\u2032u 13 Bin G\u00fcne\u015f Panelinden Kar\u015f\u0131lanacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30822\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Toyota\u2019n\u0131n Kuzey Galler\u2019de bulunan fabrikas\u0131nda \u00fcretim i\u00e7in gerekli olan enerjinin y\u00fczde 10\u2019u, kurulan yakla\u015f\u0131k 13 bin g\u00fcne\u015f panelinden kar\u015f\u0131lanacak.<\/strong><span id=\"more-66872\"><\/span><\/p>\n<p>G\u00fcne\u015f panellerinin bir y\u0131lda \u00fcretece\u011fi 3 milyon 475 bin kWh enerji, 22 bin 500 ara\u00e7 motorunun \u00fcretimi i\u00e7in gerekli olan enerji miktar\u0131na e\u015fde\u011fer.<img loading=\"lazy\" class=\"alignright size-medium wp-image-30823\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323-300x156.jpg\" alt=\"toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323\" width=\"300\" height=\"156\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323-300x156.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323-500x260.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323-80x41.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/toyota-galler-fabrikas\u0131-g\u00fcne\u015f-santrali-23798323.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/p>\n<p>Bunun yan\u0131s\u0131ra, tesis, y\u0131lda 1.800 ton CO2 emisyonu tasarruf etme potansiyeline de sahip olacak.<\/p>\n<p>Toyota\u2019n\u0131n Avensis ve Auris modelleri i\u00e7in benzinli ve hibrit motorlar\u0131 \u00fcreten Kuzey Galler\u2019de bulunan Deeside Fabrikas\u0131\u2019ndaki \u00fcretimin y\u00fczde 10\u2019unu kar\u015f\u0131layacak olan g\u00fcne\u015f panellerinin kurulumunu British Gas \u00fcstlendi.<\/p>\n<p>8 futbol sahas\u0131 b\u00fcy\u00fckl\u00fc\u011f\u00fcnde bir alan\u0131 kapsayan g\u00fcne\u015f panellerinin kurulumu 3 ayda tamamland\u0131 ve 1 milyar pounda maloldu.<\/p>\n<p>Toyota\u2019n\u0131n \u0130ngiltere \u2019de bulunan Derbyshire fabrikas\u0131ndan sonra g\u00fcne\u015f enerjisinden yararlanan Kuzey Galler\u2019deki Deeside Fabrikas\u0131 da, \u00fcretimde \u00e7evrecili\u011fe \u00f6nc\u00fcl\u00fck ediyor.<\/p>\n<p>Toyota, \u0130ngiltere\u2019deki tesislerinde oldu\u011fu gibi, d\u00fcnyadaki t\u00fcm \u00fcretim tesislerinde at\u0131klar\u0131 azaltarak, do\u011fal kaynaklar\u0131n verimli kullan\u0131m\u0131n\u0131 sa\u011flayarak ve kirlili\u011finin \u00f6n\u00fcne ge\u00e7erek \u00e7evre konusundaki k\u00fcresel liderlik konumunu koruyor.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Toyota\u2019n\u0131n Kuzey Galler\u2019de bulunan fabrikas\u0131nda \u00fcretim i\u00e7in gerekli olan enerjinin y\u00fczde 10\u2019u, kurulan yakla\u015f\u0131k 13 bin g\u00fcne\u015f panelinden kar\u015f\u0131lanacak. G\u00fcne\u015f panellerinin bir y\u0131lda [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30823,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[10110,17609,13,142,17610,17611],"views":458,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30822"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30822"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30822\/revisions"}],"predecessor-version":[{"id":30824,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30822\/revisions\/30824"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30823"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30822"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30822"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30822"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}