{"id":30768,"date":"2014-08-24T22:30:21","date_gmt":"2014-08-24T19:30:21","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30768"},"modified":"2014-08-24T22:30:21","modified_gmt":"2014-08-24T19:30:21","slug":"gunesevi-enerji-sancakin-devir-izne-tabi-degil","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunesevi-enerji-sancakin-devir-izne-tabi-degil\/","title":{"rendered":"(Turkish) G\u00fcne\u015fevi Enerji, Sancak`\u0131n: Devir \u0130zne Tabi De\u011fil&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30768\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rekabet Kurulu, G\u00fcne\u015fevi Enerji hisselerinin Sancak Enerji taraf\u0131ndan devral\u0131nmas\u0131 i\u015fleminin<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/gunesevi-enerji-sancakin-devir-izne-tabi-degil.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-30769\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/gunesevi-enerji-sancakin-devir-izne-tabi-degil-300x224.jpg\" alt=\"gunesevi-enerji-sancakin-devir-izne-tabi-degil\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/gunesevi-enerji-sancakin-devir-izne-tabi-degil-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/gunesevi-enerji-sancakin-devir-izne-tabi-degil-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/gunesevi-enerji-sancakin-devir-izne-tabi-degil.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a> izne tabi olmad\u0131\u011f\u0131na karar verdi. Konu ile ilgili karar Rekabet Kurulu\u2019nun internet sitesinde yay\u0131mland\u0131.<\/strong><\/p>\n<p>Kurul taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamaya g\u00f6re, G\u00fcne\u015fevi Enerji Sanayi ve Ticaret Ltd. \u015eti.\u2019nin t\u00fcm hisselerinin Sancak Enerji Hizmetleri A.\u015e. taraf\u0131ndan devral\u0131nmas\u0131 i\u015fleminin izne tabi olmad\u0131\u011f\u0131na karar verildi.<\/p>\n<p>G\u00fcne\u015fevi Enerji Sanayi ve Ticaret Limited \u015eirketi`nin sermayesinin y\u00fczde 100`\u00fcn\u00fc temsil eden hisselerin t\u00fcm hak ve vecibeleri ile birlikte Ferit Kalfao\u011flu ve Eksen M\u00fchendislik Test ve Sim\u00fclasyon Ticaret Limited \u015eirketi taraf\u0131ndan Sancak Enerji Hizmetleri Anonim \u015eirketi`ne devri ile ilgili Rekabet Kurumu`na ba\u015fvuru yap\u0131lm\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/gunesevi-enerji-sancakin:-devir-izne-tabi-degil_9815.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rekabet Kurulu, G\u00fcne\u015fevi Enerji hisselerinin Sancak Enerji taraf\u0131ndan devral\u0131nmas\u0131 i\u015fleminin izne tabi olmad\u0131\u011f\u0131na karar verdi. Konu ile ilgili karar Rekabet Kurulu\u2019nun internet sitesinde [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30769,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,227,13],"views":706,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30768"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30768"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30768\/revisions"}],"predecessor-version":[{"id":30770,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30768\/revisions\/30770"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30769"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30768"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30768"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30768"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}