{"id":30751,"date":"2014-08-23T19:42:15","date_gmt":"2014-08-23T16:42:15","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30751"},"modified":"2014-08-23T19:42:49","modified_gmt":"2014-08-23T16:42:49","slug":"ingiltere-gunes-elektriginde-5-gwi-asti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ingiltere-gunes-elektriginde-5-gwi-asti\/","title":{"rendered":"(Turkish) \u0130ngiltere G\u00fcne\u015f Elektri\u011finde 5 GW\u2019\u0131 A\u015ft\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30751\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130ngiltere\u2019nin g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn ge\u00e7en ay 5 GW\u2019l\u0131k s\u0131n\u0131r\u0131 a\u015ft\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Ara\u015ft\u0131rma kurulu\u015fu NDP Solarbuzz taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada \u00fclkenin bu s\u0131n\u0131r\u0131 ge\u00e7en alt\u0131nc\u0131 \u00fclke oldu\u011funun da alt\u0131 \u00e7izildi. Kurulu\u015fun alt\u0131n\u0131 \u00e7izdi\u011fi bir di\u011fer nokta ise \u0130ngiltere\u2019nin bu kurulu g\u00fcc\u00fcn y\u00fczde 90\u2019\u0131na yaln\u0131zca 36 ay i\u00e7inde ula\u015fm\u0131\u015f olmas\u0131 oldu.<\/strong><\/p>\n<p>\u0130ngiltere 2010 y\u0131l\u0131nda bu alanda neredeyse s\u0131f\u0131r noktas\u0131nda iken, \u00fclke h\u00fck\u00fcmetinin bu tarihte g\u00fcne\u015f elektri\u011fi kurulumlar\u0131na te\u015fvik sa\u011flamas\u0131 ve gerekli yasal d\u00fczenlemelerin y\u00fcr\u00fcrl\u00fc\u011fe girmesi \u00fclkedeki kurulumlar\u0131n h\u0131zla artmas\u0131n\u0131 sa\u011flam\u0131\u015ft\u0131.<\/p>\n<p>NDP Solarbuzz verilerine g\u00f6<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/ingiltere-gunes-elektriginde-5-gwi-asti.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-30752\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/ingiltere-gunes-elektriginde-5-gwi-asti-300x201.jpg\" alt=\"ingiltere-gunes-elektriginde-5-gwi-asti\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/ingiltere-gunes-elektriginde-5-gwi-asti-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/ingiltere-gunes-elektriginde-5-gwi-asti-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/ingiltere-gunes-elektriginde-5-gwi-asti.jpg 373w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>re \u0130ngiltere\u2019de devrede olan kurulu g\u00fcc\u00fcn y\u00fczde 46\u2019s\u0131 \u00fclkenin en g\u00fcne\u015fli alanlar\u0131 olan g\u00fcney bat\u0131 ve g\u00fcney do\u011fu b\u00f6lgelerinde bulunuyor.<br \/>\nAl\u0131m garantilerinden yararlanan k\u00fc\u00e7\u00fck \u00f6l\u00e7ekli g\u00fcne\u015f elektri\u011fi sistemleri, toplam kurulu g\u00fcc\u00fcn y\u00fczde 42\u2019sini olu\u015fturuyor iken konutlar\u0131n \u00e7at\u0131lar\u0131nda bulunan sistemlerin toplam g\u00fc\u00e7 i\u00e7indeki oran\u0131 ise \u00fc\u00e7te bir d\u00fczeyinde bulunuyor.<\/p>\n<p>Kurulu\u015fa g\u00f6re ilgili yasal d\u00fczenlemeler konusunda belirsizlik olan ve yeterli te\u015fvik elde edemeyen 250 kW\u2019\u0131n \u00fczerindeki \u00e7at\u0131 tipi kurulumlar\u0131n toplam g\u00fc\u00e7 i\u00e7indeki pay\u0131 ise y\u00fczde 3\u2019\u00fc ge\u00e7ememi\u015f durumda.<\/p>\n<p>50 d\u00f6n\u00fcm ve \u00fczeri alan kaplayan b\u00fcy\u00fck \u00f6l\u00e7ekli kurulumlar ise \u0130ngiltere\u2019nin g\u00fcne\u015f elektri\u011fi g\u00fcc\u00fcnde y\u00fczde 20\u2019lik pay sahibi ve \u00f6zellikle son 18 ayda bu alanda ciddi bir art\u0131\u015f e\u011filimi g\u00f6r\u00fclmekte.<\/p>\n<p>\u00dclkenin g\u00fcne\u015f elektri\u011fi alan\u0131ndaki geli\u015fimini \u00fc\u00e7er ayl\u0131k d\u00f6nemler halinde yay\u0131nlayan \u0130ngiltere Enerji ve \u0130klim De\u011fi\u015fikli\u011fi Bakanl\u0131\u011f\u0131 hen\u00fcz bu d\u00f6nem i\u00e7in resmi rakamlar\u0131 a\u00e7\u0131klamam\u0131\u015fsa da, bakanl\u0131\u011f\u0131n son a\u00e7\u0131klad\u0131\u011f\u0131 verilere g\u00f6re Haziran sonu itibari ile \u0130ngiltere\u2019de toplam kurulu g\u00fc\u00e7leri 3.926 MW olan 572.102 adet g\u00fcne\u015f elektri\u011fi sistemi devrede bulunuyordu.<\/p>\n<p>\u0130ngiltere 2020 y\u0131l\u0131nda 20 GW\u2019l\u0131k g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcne ula\u015fmay\u0131 hedefliyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/gunes-elektrigi\/ingiltere-gunes-elektriginde-5-gwi-asti\" target=\"_blank\" rel=\"nofollow\">Ye\u015fil Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ngiltere\u2019nin g\u00fcne\u015f elektri\u011fi kurulu g\u00fcc\u00fcn\u00fcn ge\u00e7en ay 5 GW\u2019l\u0131k s\u0131n\u0131r\u0131 a\u015ft\u0131\u011f\u0131 a\u00e7\u0131kland\u0131. Ara\u015ft\u0131rma kurulu\u015fu NDP Solarbuzz taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada \u00fclkenin bu s\u0131n\u0131r\u0131 ge\u00e7en [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30752,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[63,67,1009,165,227,1169,13,1092,1663],"views":575,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30751"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30751"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30751\/revisions"}],"predecessor-version":[{"id":30753,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30751\/revisions\/30753"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30752"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30751"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30751"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30751"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}