{"id":30319,"date":"2014-08-10T20:55:23","date_gmt":"2014-08-10T17:55:23","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30319"},"modified":"2014-08-10T20:55:23","modified_gmt":"2014-08-10T17:55:23","slug":"bodrum-yalikavakta-ruzgar-kamulastirmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bodrum-yalikavakta-ruzgar-kamulastirmasi\/","title":{"rendered":"(Turkish) Bodrum Yal\u0131kavak`ta R\u00fczg\u00e2r Kamula\u015ft\u0131rmas\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30319\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Geri\u015f R\u00fczgar Enerji Santrali`nin (RES) yap\u0131m\u0131 i\u00e7in ihtiya\u00e7 duyulan Bodrum Yal\u0131kavak`daki baz\u0131 t<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/bodrum-yalikavakta-ruzgar-kamulastirmasi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-30320\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/bodrum-yalikavakta-ruzgar-kamulastirmasi-300x210.jpg\" alt=\"bodrum-yalikavakta-ruzgar-kamulastirmasi\" width=\"300\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/bodrum-yalikavakta-ruzgar-kamulastirmasi-300x210.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/bodrum-yalikavakta-ruzgar-kamulastirmasi-71x50.jpg 71w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/bodrum-yalikavakta-ruzgar-kamulastirmasi.jpg 474w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>a\u015f\u0131nmazlar kamula\u015ft\u0131r\u0131lacak.<\/strong><\/p>\n<p>Mu\u011fla`n\u0131n Bodrum \u0130l\u00e7esi`nde kurulacak Geri\u015f RES i\u00e7in ihtiya\u00e7 duyulacak baz\u0131 ta\u015f\u0131nmazlar kamula\u015ft\u0131r\u0131lacak.<\/p>\n<p>Geri\u015f, Yal\u0131kavak ve Yaka mevkilerindeki s\u00f6z konusu ta\u015f\u0131nmazlar\u0131n kamula\u015ft\u0131rma i\u015flemleri, Hazine ad\u0131na tescil edilmek \u00fczere Maliye Bakanl\u0131\u011f\u0131 taraf\u0131ndan yap\u0131lacak.<\/p>\n<p>Geri\u015f RES, R\u00fczgar Elektrik \u00dcretim Limited \u015eirketi taraf\u0131ndan in\u015fa ediliyor. Santralin kurulu g\u00fcc\u00fc 11.2 MW olarak planland\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/bodrum-yalikavakta-ruzg\u00e2r-kamulastirmasi_9652.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Geri\u015f R\u00fczgar Enerji Santrali`nin (RES) yap\u0131m\u0131 i\u00e7in ihtiya\u00e7 duyulan Bodrum Yal\u0131kavak`daki baz\u0131 ta\u015f\u0131nmazlar kamula\u015ft\u0131r\u0131lacak. Mu\u011fla`n\u0131n Bodrum \u0130l\u00e7esi`nde kurulacak Geri\u015f RES i\u00e7in ihtiya\u00e7 duyulacak [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30320,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[68,63,67,1009,165,17221,35370,69,16,99],"views":932,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30319"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30319"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30319\/revisions"}],"predecessor-version":[{"id":30321,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30319\/revisions\/30321"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30320"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}