{"id":30317,"date":"2014-08-10T20:34:58","date_gmt":"2014-08-10T17:34:58","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30317"},"modified":"2014-08-10T20:34:58","modified_gmt":"2014-08-10T17:34:58","slug":"4-ilde-hes-kamulastirmalari-yapilacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/4-ilde-hes-kamulastirmalari-yapilacak\/","title":{"rendered":"(Turkish) 4 ilde HES Kamula\u015ft\u0131rmalar\u0131 Yap\u0131lacak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30317\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Giresun, I\u011fd\u0131r, Mu\u015f ve K\u0131r\u0131kkale illerinde kurulmas\u0131 planlanan be\u015f HES projesi i\u00e7in acele kamula\u015ft\u0131rma yap\u0131lacak. Bakanlar Kurulu`nun acele kamula\u015ft\u0131rma yap\u0131lmas\u0131yla ilgili kararlar\u0131 Resmi Gazete`de yay\u0131mland\u0131.<\/strong><\/p>\n<p><strong>Buna g\u00f6re:<\/strong><\/p>\n<p>Giresun`da Mart\u0131 Elektrik taraf\u0131ndan tesis edilecek, kurulu g\u00fcc\u00fc 10,049 olarak planlanan \u00c7ay Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santralinin yap\u0131m\u0131 i\u00e7in Espiye il\u00e7esine ba\u011fl\u0131 Arpac\u0131k k\u00f6y\u00fc, G\u00fcce il\u00e7esine ba\u011fl\u0131 G\u00fcra\u011fa\u00e7, Kemaliye ve G\u00fcce k\u00f6yleri ile Tirebolu il\u00e7esine ba\u011fl\u0131 \u015eirink\u00f6y k\u00f6y\u00fcnde <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-29654\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283-300x199.jpg\" alt=\"hidroelektrik-HES\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/hidroelektrik-HES-23873283.jpg 870w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>bulunan baz\u0131 ta\u015f\u0131nmazlar;<\/p>\n<p>Giresun`da \u0130yon Enerji taraf\u0131ndan tesis edilecek olan ve kurulu g\u00fcc\u00fc 35.6 MW olarak planlanan Ko\u00e7lu Hidroelektrik Santrali i\u00e7in Ya\u011fl\u0131dere il\u00e7esine ba\u011fl\u0131 Kanl\u0131ca ve Hisarc\u0131k k\u00f6ylerindeki baz\u0131 ta\u015f\u0131nmazlar;<\/p>\n<p>I\u011fd\u0131r`da Kutup Enerji taraf\u0131ndan tesis edilecek olan ve kurulu g\u00fcc\u00fc 9,036 olarak planlanan Bayra Hidroelektrik Santrali i\u00e7in Tuzluca il\u00e7esine ba\u011fl\u0131 Buruksu ve \u00dc\u00e7kaya k\u00f6ylerindeki baz\u0131 ta\u015f\u0131nmazlar;<\/p>\n<p>K\u0131r\u0131kkale`de Ala\u015far HES Enerji taraf\u0131ndan tesis edilecek olan ve kurulu g\u00fcc\u00fc 15,99 MW olarak planlanan K\u00f6pr\u00fckale Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santrali i\u00e7in Yah\u015fihan il\u00e7esi Merkez ve Kad\u0131o\u011flu, Do\u011fanl\u0131k ve K\u0131l\u0131\u00e7lar k\u00f6ylerindeki baz\u0131 ta\u015f\u0131nmazlar;<\/p>\n<p>Mu\u015f`ta Alpaslan ll Enerrji taraf\u0131ndan tesis edilecek olan ve kurulu g\u00fcc\u00fc 204 MW olarak planlanan Alparslan 2 Baraj\u0131 ve Hidroelektrik Santrali`nin yap\u0131m\u0131 amac\u0131yla Merkez il\u00e7eye ba\u011fl\u0131 Akkonak, Akp\u0131nar, Mescitli ve Aligedik k\u00f6yleri ile Varto il\u00e7esine ba\u011fl\u0131 A\u015fa\u011f\u0131 Alag\u00f6z, Ba\u011fi\u00e7i, De\u011ferli, Kayal\u0131dere, Kayal\u0131k, Kumluk\u0131y\u0131, \u00d6zen\u00e7,Sanl\u0131ca, Ta\u015fdibek ve A\u015fa\u011f\u0131 Hac\u0131bey k\u00f6ylerindeki baz\u0131 ta\u015f\u0131nmazlar acele kamula\u015ft\u0131r\u0131lacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/4-ilde-hes-kamulastirmalari-yapilacak_9653.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Giresun, I\u011fd\u0131r, Mu\u015f ve K\u0131r\u0131kkale illerinde kurulmas\u0131 planlanan be\u015f HES projesi i\u00e7in acele kamula\u015ft\u0131rma yap\u0131lacak. Bakanlar Kurulu`nun acele kamula\u015ft\u0131rma yap\u0131lmas\u0131yla ilgili kararlar\u0131 Resmi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29654,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[63,67,1009,165,4640,35370,7837,3860,4474,8636],"views":1496,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30317"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30317"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30317\/revisions"}],"predecessor-version":[{"id":30318,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30317\/revisions\/30318"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29654"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30317"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30317"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30317"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}