{"id":30314,"date":"2014-08-10T20:29:05","date_gmt":"2014-08-10T17:29:05","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30314"},"modified":"2014-08-10T20:29:05","modified_gmt":"2014-08-10T17:29:05","slug":"kirikkaleye-927-mwlik-gaz-santrali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/kirikkaleye-927-mwlik-gaz-santrali\/","title":{"rendered":"(Turkish) K\u0131r\u0131kkale`ye 927 MW`lik Gaz Santrali&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30314\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Acwa Power taraf\u0131ndan K\u0131r\u0131kkale`nin Yah\u015fihan il\u00e7esi yak\u0131nlar\u0131nda 927 MWe kurulu g\u00fcc\u00fcnde do\u011falgaz \u00e7evrim santrali kuruluyor. <\/strong><strong>ACWA G\u00fc\u00e7 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-30315\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali-300x206.jpg\" alt=\"kirikkaleye-927-mwlik-gaz-santrali\" width=\"300\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali-500x344.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/kirikkaleye-927-mwlik-gaz-santrali.jpg 512w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Elektrik \u0130\u015fletme ve Y\u00f6netim Sanayi ve Ticaret Limited \u015eirketi, K\u0131r\u0131kkale Yah\u015fihan K\u0131l\u0131\u00e7lar Beldesi s\u0131n\u0131rlar\u0131 i\u00e7erisinde 927 MWe (960 MWm \/ 1.663 MWt) kurulu g\u00fcc\u00fcnde Do\u011falgaz Kombine \u00c7evrim Santral\u0131 kuracak.<\/strong><\/p>\n<p>ACWA Power K\u0131r\u0131kkale DGK\u00c7S Projesi kapsam\u0131nda 2 gaz t\u00fcrbini ve 1 buhar t\u00fcrbini yap\u0131lmas\u0131 planlan\u0131rken, her bir gaz t\u00fcrbininin g\u00fcc\u00fc 309.6 MW olacak. T\u00fcrbin \u00e7evrim verim de\u011feri y\u00fczde 37,23 al\u0131narak \u0131s\u0131l g\u00fc\u00e7 hesaplan\u0131rken, gaz t\u00fcrbini \u0131s\u0131l g\u00fcc\u00fc yakla\u015f\u0131k (309,6&#215;2) \/ 0,3723 = 1.663 MWt olarakhesapland\u0131. Proje kapsam\u0131nda yap\u0131lmas\u0131 planlanan buhar t\u00fcrbininin g\u00fcc\u00fc ise 328 MW. Kombine \u00e7evrim santralinin verimi yakla\u015f\u0131k y\u00fczde 58.6 olacak.<\/p>\n<p>Acwa Power K\u0131r\u0131kkale Do\u011falgaz Kombine \u00c7evrim Enerji Santrali`nin yap\u0131m\u0131 amac\u0131yla ihtiya\u00e7 duyulan ta\u015f\u0131nmazlar, tapuda Hazine ad\u0131na tescil edilmek \u00fczere Maliye Bakanl\u0131\u011f\u0131 taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/kirikkaleye-927-mwlik-gaz-santrali_9657.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Acwa Power taraf\u0131ndan K\u0131r\u0131kkale`nin Yah\u015fihan il\u00e7esi yak\u0131nlar\u0131nda 927 MWe kurulu g\u00fcc\u00fcnde do\u011falgaz \u00e7evrim santrali kuruluyor. ACWA G\u00fc\u00e7 Elektrik \u0130\u015fletme ve Y\u00f6netim Sanayi ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30315,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[17219,9729,92,1162,226,68,63,67,1009,165,3508,4474,17220,1934],"views":856,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30314"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30314"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30314\/revisions"}],"predecessor-version":[{"id":30316,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30314\/revisions\/30316"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30315"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30314"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30314"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}