{"id":30274,"date":"2014-08-09T09:59:36","date_gmt":"2014-08-09T06:59:36","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=30274"},"modified":"2014-08-09T09:59:36","modified_gmt":"2014-08-09T06:59:36","slug":"yuzer-santral-kaya-bey-serbest-birakildi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/yuzer-santral-kaya-bey-serbest-birakildi\/","title":{"rendered":"(Turkish) Y\u00fczer Santral Kaya Bey Serbest B\u0131rak\u0131ld\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/30274\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Yakla\u015f\u0131k 25 ayd\u0131r Pakistan taraf\u0131ndan al\u0131koyulan d\u00f6rt y\u00fczer santralin en b\u00fcy\u00fc\u011f\u00fc olan Karadeniz Powership Kaya Bey, tamamen serbest b\u0131rak\u0131ld\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-30275\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey-300x166.jpg\" alt=\"karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey\" width=\"300\" height=\"166\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey-300x166.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey-500x277.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/08\/karadeniz-enerji-yc3bczen-santral-powership-gemi-kaya-bey.jpg 630w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><span id=\"more-66623\"><\/span><\/p>\n<p>Karadeniz Holding \u015firketlerinden Karkey\u2019in, 2012 y\u0131l\u0131n\u0131n nisan ay\u0131ndan bu yana Pakistan taraf\u0131ndan tutulan d\u00f6rt gemisinden biri olan 216 MW kapasiteli Karadeniz Powership Kaya Bey, D\u00fcnya Bankas\u0131\u2019na ba\u011fl\u0131 ICSID (Uluslararas\u0131 Yat\u0131r\u0131m Anla\u015fmazl\u0131klar\u0131n\u0131n \u00c7\u00f6z\u00fcm Merkezi) tahkim karar\u0131yla tamamen serbest kald\u0131.<\/p>\n<p>Karardan memnuniyet duyduklar\u0131n\u0131 belirten Karadeniz Holding B\u00f6lge Direkt\u00f6r\u00fc Yasin Suudi, \u201cPakistan Federal Y\u00fcksek Mahkemesi, t\u00fcm enerji kiralama projelerini iptal etti ve gemilerimizi al\u0131koydu. Kaya Bey serbest b\u0131rak\u0131ld\u0131 ancak biri y\u00fczer enerji santrali olmak \u00fczere toplam 3 gemimiz halen Pakistan\u2019da. Dava s\u00fcreci devam ediyor\u201d dedi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.milliyet.com.tr\/yuzer-santral-serbest-birakildi\/ekonomi\/detay\/1922571\/default.htm\" target=\"_blank\" rel=\"nofollow\">milliyet<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Yakla\u015f\u0131k 25 ayd\u0131r Pakistan taraf\u0131ndan al\u0131koyulan d\u00f6rt y\u00fczer santralin en b\u00fcy\u00fc\u011f\u00fc olan Karadeniz Powership Kaya Bey, tamamen serbest b\u0131rak\u0131ld\u0131. Karadeniz Holding \u015firketlerinden Karkey\u2019in, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":30275,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[17200,3624,17201,17202,15964,17203],"views":818,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30274"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=30274"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30274\/revisions"}],"predecessor-version":[{"id":30276,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/30274\/revisions\/30276"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/30275"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=30274"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=30274"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=30274"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}