{"id":29567,"date":"2014-07-20T15:24:48","date_gmt":"2014-07-20T12:24:48","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=29567"},"modified":"2014-07-20T15:24:48","modified_gmt":"2014-07-20T12:24:48","slug":"antalya-stadi-gunes-ile-aydinlanacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/antalya-stadi-gunes-ile-aydinlanacak\/","title":{"rendered":"(Turkish) Antalya Stad\u0131 G\u00fcne\u015f \u0130le Ayd\u0131nlanacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/29567\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>SE\u0130SO Enerji, Antalya Stad\u0131\u2019na 1,4 MW l\u0131k T\u00fcrkiye`nin en b\u00fcy\u00fck \u00e7at\u0131 \u00fczeri g\u00fcne\u015f enerjisi sistemi uygulamas\u0131n\u0131 yapacak. SE\u0130SO Enerji A.\u015e. resmi internet sitesinden, Antalya 100.Y\u0131l Stadyumuna 1400 kWp g\u00fcne\u015f enerjisi panelleri kurmak i\u00e7in s\u00f6zle\u015fme imzalad\u0131klar\u0131n\u0131 duyurdu.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/antalya-stadi-gunes-ile-aydinlanacak.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-29568\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/antalya-stadi-gunes-ile-aydinlanacak-300x190.jpg\" alt=\"antalya-stadi-gunes-ile-aydinlanacak\" width=\"300\" height=\"190\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/antalya-stadi-gunes-ile-aydinlanacak-300x190.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/antalya-stadi-gunes-ile-aydinlanacak-80x50.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/antalya-stadi-gunes-ile-aydinlanacak.jpg 381w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>S\u00f6zle\u015fme imzas\u0131nda Akay \u0130n\u015faat\u0131 Y\u00f6netim Kurulu Ba\u015fkan\u0131 Zeki KARA, Y\u00f6netim Kurulu \u00dcyesi Ertan OLGUN, Genel M\u00fcd\u00fcr Murat \u00d6ZT\u00dcRK ve SE\u0130SO Enerji A.\u015e. Genel M\u00fcd\u00fcr\u00fc \u0130smail Hakk\u0131 KARACA haz\u0131r bulundu.<\/p>\n<p><strong>S\u0130STEM YILBA\u015eINDA TAMAMLANACAK<\/strong><\/p>\n<p>SE\u0130SO Enerji A.\u015e.taraf\u0131ndan anahtar teslim olarak kurulacak sistem y\u0131lba\u015f\u0131na tamamlanarak devreye al\u0131nacak. Silindirik bi\u00e7imli stad\u0131n \u00e7at\u0131s\u0131na 5400 adet g\u00fcne\u015f paneli kurulacak ve bu b\u00fcy\u00fckl\u00fckle Antalya Stad\u0131 d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerjisi sistemine sahip ilk 3 stad\u0131ndan birisi olacak.<\/p>\n<p>Bu kurulumla Antalya Stad\u0131, 1 MWp kurulu g\u00fcce sahip Kaohsiung National Stadium (Tayvan) ve 1,3 MWp kurulu g\u00fcce sahip Stade de Suisse (\u0130svi\u00e7re) tesislerinin rekorunu k\u0131rarak d\u00fcnyan\u0131n en b\u00fcy\u00fck g\u00fcne\u015f enerjili stadyumu unvan\u0131n\u0131 alacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/antalya-stadi-gunes-ile-aydinlanacak_9415.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.SE\u0130SO Enerji, Antalya Stad\u0131\u2019na 1,4 MW l\u0131k T\u00fcrkiye`nin en b\u00fcy\u00fck \u00e7at\u0131 \u00fczeri g\u00fcne\u015f enerjisi sistemi uygulamas\u0131n\u0131 yapacak. SE\u0130SO Enerji A.\u015e. resmi internet sitesinden, [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29568,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[16819,16821,63,67,1009,165,227,13,16820],"views":1349,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29567"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=29567"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29567\/revisions"}],"predecessor-version":[{"id":29569,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29567\/revisions\/29569"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29568"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=29567"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=29567"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=29567"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}