{"id":29500,"date":"2014-07-18T09:27:26","date_gmt":"2014-07-18T06:27:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=29500"},"modified":"2014-07-18T09:27:26","modified_gmt":"2014-07-18T06:27:26","slug":"artvinde-540-mw-kapasiteli-yusufeli-baraji-yukseliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/artvinde-540-mw-kapasiteli-yusufeli-baraji-yukseliyor\/","title":{"rendered":"(Turkish) Artvin&#8217;de 540 MW Kapasiteli Yusufeli Baraj\u0131 Y\u00fckseliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/29500\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Artvin\u2019de yap\u0131m\u0131 tamamland\u0131\u011f\u0131nda kemer baraj s\u0131n\u0131f\u0131nda temelden 270 metre y\u00fcksekli\u011fi ile T\u00fcrkiye\u2019nin birinci, d\u00fcnyan\u0131n \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 olacak Yusufeli Baraj\u0131 ve HES in\u015faat\u0131nda y\u00fczde 25 fiziki ger\u00e7ekle\u015fme sa\u011fland\u0131.<\/strong><span id=\"more-66330\"><\/span><\/p>\n<p>\u00c7oruh Nehri \u00fczerinde yap\u0131lan, temeli ge\u00e7ti\u011fimiz y\u0131l \u015eubat ay\u0131nda at\u0131lan baraj\u0131n 2018 y\u0131l\u0131nda tamamlanmas\u0131 bekleniyor.<\/p>\n<p>Artvin\u2019in 90 kilometre g\u00fcneyinde, \u00c7oruh Nehri \u00fczerinde temeli at\u0131lan ve T\u00fcrkiye\u2019nin en y\u00fcksek, d\u00fcnyan\u0131n 3. en y\u00fcksek \u00e7ift <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-29501\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131-300x224.jpg\" alt=\"A\" width=\"300\" height=\"224\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131-300x224.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131-500x374.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131-66x50.jpg 66w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/yusufeli-braj\u0131.jpg 670w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>e\u011frilikli beton kemer baraj\u0131 olacak olan Yusufeli Baraj\u0131\u2019ndan y\u0131lda 1,827 milyar kilowatt saat elektrik \u00fcretilecek. 270 metre y\u00fcksekli\u011fi ile 236 metre y\u00fcksekli\u011findeki T\u00fcrkiye\u2019nin ve Avrupa\u2019n\u0131n en y\u00fcksek binas\u0131 olan \u0130stanbul Sapphire de geride b\u0131rakacak olan baraj, b\u00fct\u00fcn binalar i\u00e7inde T\u00fcrkiye\u2019nin en y\u00fckse\u011fi olacak. Baraj g\u00f6vdesinde yakla\u015f\u0131k 2.9 milyon metrek\u00fcp beton kullan\u0131lacak. Baraj\u0131n in\u015faat\u0131nda, 150 metrekare b\u00fcy\u00fckl\u00fc\u011f\u00fcnde 45 bin konutun in\u015fas\u0131n\u0131 m\u00fcmk\u00fcn k\u0131lacak miktarda malzeme kullan\u0131lacak. 2.2 milyar metrek\u00fcp su depolanacak olan barajda 540 megawatt kurulu g\u00fcc\u00fcndeki hidroelektrik santralinin devreye girmesiyle y\u0131lda 1,827 milyar kilowatt saat elektrik \u00fcretilecek. 486 milyon lira bedelle ihale edilen baraj in\u015faat\u0131n\u0131 Kolin, Cengiz ve Limak \u0130n\u015faat firmalar\u0131n\u0131n olu\u015fturdu\u011fu i\u015f ortakl\u0131\u011f\u0131 ger\u00e7ekle\u015ftirecek.<\/p>\n<p>Deriner Baraj\u0131 ile Avrupa\u2019n\u0131n 4, d\u00fcnyan\u0131n 6\u2019nc\u0131 en y\u00fcksek \u00e7ift e\u011frilikli beton kemer baraj\u0131na sahip T\u00fcrkiye, Yusufeli Baraj\u0131\u2019n\u0131n tamamlanmas\u0131yla bu alanda d\u00fcnya \u00fc\u00e7\u00fcnc\u00fcl\u00fc\u011f\u00fcne y\u00fckselecek. D\u00fcnyan\u0131n en y\u00fcksek \u00e7ift e\u011frilikli beton kemer barajlar\u0131 \u015f\u00f6yle:<\/p>\n<p>Xiaowan Baraj\u0131 (\u00c7in) : 292 metre, Inguri Baraj\u0131 (G\u00fcrcistan) : 271,5 metre, Vajont Baraj\u0131 (\u0130talya) : 261,6 metre, Mauvoisin Baraj\u0131 (\u0130svi\u00e7re): 250 metre, Laxiwa Baraj\u0131 (\u00c7in) : 250 metre, Deriner Baraj\u0131 (T\u00fcrkiye) : 249 metre.<\/p>\n<p>Artvin\u2019de yap\u0131m\u0131 tamamland\u0131\u011f\u0131nda kemer baraj s\u0131n\u0131f\u0131nda temelden 270 metre y\u00fcksekli\u011fi ile T\u00fcrkiye\u2019nin birinci, d\u00fcnyan\u0131n \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 olacak Yusufeli Baraj\u0131 ve HES in\u015faat\u0131nda y\u00fczde 25 fiziki ger\u00e7ekle\u015fme sa\u011fland\u0131.<\/p>\n<p>Yusufeli Baraj\u0131; L\u0130MAK, Cengiz \u0130n\u015faat ve Kolin firmalar\u0131ndan olu\u015fan LCK Yusufeli Adi Ortakl\u0131\u011f\u0131 taraf\u0131ndan in\u015fa ediliyor.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Artvin\u2019de yap\u0131m\u0131 tamamland\u0131\u011f\u0131nda kemer baraj s\u0131n\u0131f\u0131nda temelden 270 metre y\u00fcksekli\u011fi ile T\u00fcrkiye\u2019nin birinci, d\u00fcnyan\u0131n \u00fc\u00e7\u00fcnc\u00fc en y\u00fcksek baraj\u0131 olacak Yusufeli Baraj\u0131 ve HES [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29501,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,47],"tags":[1089,2952,9824,16775,35370,4639,9825,16696,1457,16776,1088,16777],"views":1448,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29500"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=29500"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29500\/revisions"}],"predecessor-version":[{"id":29502,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29500\/revisions\/29502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29501"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=29500"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=29500"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=29500"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}