{"id":29325,"date":"2014-07-13T17:53:33","date_gmt":"2014-07-13T14:53:33","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=29325"},"modified":"2014-07-13T17:53:33","modified_gmt":"2014-07-13T14:53:33","slug":"bandirma-res-icin-ced-gereksiz","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bandirma-res-icin-ced-gereksiz\/","title":{"rendered":"(Turkish) Band\u0131rma RES \u0130\u00e7in \u00c7ED Gereksiz&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/29325\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bursa Temiz Enerji taraf\u0131ndan Bal\u0131kesir\u2019de yap\u0131lmas\u0131 planlanan Band\u0131rma RES proje<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bandirma-res-icin-ced-gereksiz.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-29326\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bandirma-res-icin-ced-gereksiz-300x215.jpg\" alt=\"bandirma-res-icin-ced-gereksiz\" width=\"300\" height=\"215\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bandirma-res-icin-ced-gereksiz-300x215.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bandirma-res-icin-ced-gereksiz-69x50.jpg 69w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bandirma-res-icin-ced-gereksiz.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>si i\u00e7in `\u00c7ED Gerekli De\u011fildir` karar\u0131 verildi.<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn internet sitesinde konu ile ilgili yap\u0131lan a\u00e7\u0131klamada \u015fu bilgiler verildi:<br \/>\n&#8220;Bal\u0131kesir ili Band\u0131rma ilcesi Bezirci-\u00c7inge-Do\u011fanp\u0131nar Mahallesi, Emirler mevkiindeki Bursa Temiz Enerji Elektrik \u00dcretim San. ve Tic. A.\u015e. taraf\u0131ndan yap\u0131lmas\u0131 planlanan Band\u0131rma-III RES Kapasite Art\u0131r\u0131m\u0131 projesi ile ilgili olarak Bakanl\u0131\u011f\u0131m\u0131za sunulan dosyay\u0131 PTD Dosyas\u0131 incelenmi\u015f ve de\u011ferlendirilmi\u015ftir \u00c7ED Y\u00f6netmeli\u011fi\u2019nin 17. maddesi gere\u011fince Band\u0131rma-III RES Kapasite Art\u0131r\u0131m\u0131 projesi`ne Valili\u011fimizce \u201c\u00c7evresel Etki De\u011ferlendirmesi Gerekli De\u011fildir\u201d karar\u0131 verilmi\u015ftir.&#8221;<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/bandirma-res-icin-ced-gereksiz_9286.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bursa Temiz Enerji taraf\u0131ndan Bal\u0131kesir\u2019de yap\u0131lmas\u0131 planlanan Band\u0131rma RES projesi i\u00e7in `\u00c7ED Gerekli De\u011fildir` karar\u0131 verildi. \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29326,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[3613,11832,16602,16604,16603,2878,5465,63,67,1009,165,474,69,16,231],"views":1126,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29325"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=29325"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29325\/revisions"}],"predecessor-version":[{"id":29327,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29325\/revisions\/29327"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29326"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=29325"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=29325"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=29325"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}