{"id":29116,"date":"2014-07-09T19:35:00","date_gmt":"2014-07-09T16:35:00","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=29116"},"modified":"2014-07-09T19:36:53","modified_gmt":"2014-07-09T16:36:53","slug":"enerjide-67832-mw-kurulu-guce-tesvik-belgesi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi\/","title":{"rendered":"(Turkish) Enerjide 678,32 MW Kurulu G\u00fcce Te\u015fvik Belgesi!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/29116\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Enerji sekt\u00f6r\u00fcnde May\u0131s ay\u0131nda 678,32 MW kurulu g\u00fc\u00e7te elektrik enerjisi \u00fcretimi i\u00e7in te\u015fvik belgesi al\u0131nd\u0131.Ekonomi Bakanl\u0131\u011f\u0131`n\u0131n Yat\u0131r\u0131m Te\u015fvik Belgeleri listesi Resmi Gazete`de yay\u0131mland\u0131. Buna g\u00f6re, elektrik enerjisi \u00fcretimi i\u00e7in al\u0131nan te\u015fvik belgeleri tutar\u0131 2 milyar 851,0 milyon TL oldu.<\/strong><\/p>\n<p><strong>EN B\u00dcY\u00dcK TE\u015eV\u0130K SANKO TEKST\u0130L`E<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-29117\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi-300x201.jpg\" alt=\"enerjide-67832-mw-kurulu-guce-tesvik-belgesi\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>En b\u00fcy\u00fck te\u015fvik belgesini Sanko Tekstil \u0130\u015fletmeleri 150 MW kurulu g\u00fc\u00e7teki yerli ve termik enerjiye dayal\u0131 santral i\u00e7in 445 milyon TL olarak ald\u0131. Soma Enerji Elektrik \u00dcretim`in 240,1 MW g\u00fc\u00e7teki RES`i i\u00e7in 387,7 milyon TL te\u015fvik belgesi d\u00fczenlendi.<\/p>\n<p>Ak\u00e7a Enerji`nin 4 MW g\u00fc\u00e7teki JES`i i\u00e7in 16 milyon TL, Eriko\u011flu \u00d6zel Sa\u011fl\u0131k`\u0131n 9 MW g\u00fc\u00e7teki GES`i i\u00e7in 3,18 milyon TL, Yumrutepe Enerji`nin 13,68 MW g\u00fc\u00e7teki HES`i i\u00e7in 60 milyon TL, D\u00fcnya Enerji`nin 16,26 MW kurulu g\u00fc\u00e7tesi HES`i i\u00e7in 71,5 milyon TL, Nassan Elektrik`in 5,95 MW g\u00fc\u00e7tesi HES`i i\u00e7in 5,3 milyon TL, Nadir Nacar Enerji`nin 1 MW g\u00fc\u00e7teki GES`i i\u00e7in 4,4 milyon TL, Alt\u0131nova Enerji`nin 1 MW g\u00fc\u00e7teki GES`i i\u00e7in 4,4 milyon TL, NAS Enerji`nin 31,4 MW g\u00fc\u00e7tesi HES`i i\u00e7in 88 milyon TL, Toros Tar\u0131m`\u0131n 22,73 MW g\u00fc\u00e7teki termik-buhar santralii\u00e7in 41 milyon TL, Eskoda Enerji`nin 52,8 MW g\u00fc\u00e7teki RES`i i\u00e7in 149 milyon TL, Eskoda Enerji`nin 52,8 MW g\u00fc\u00e7teki RES`i i\u00e7in 148,7 milyonTL, G\u00fcne\u015f r\u00fczgar\u0131 Elektrik`in 52,8 MW g\u00fc\u00e7teki RES`i i\u00e7in 150 milyon TL, Y\u00fckseller Pazarlama`n\u0131n 25 MW g\u00fc\u00e7teki RES`i i\u00e7in 1,3 milyon TLtutar\u0131nda te\u015fvik belgesi d\u00fczenlendi.<\/p>\n<p>Te\u015fvik belgeleri ile 260 ki\u015fiye istihdam sa\u011flanm\u0131\u015f olacak.<\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjigunlugu.net\/enerjide-67832-mw-kurulu-guce-tesvik-belgesi_9262.html\" target=\"_blank\" rel=\"nofollow\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Enerji sekt\u00f6r\u00fcnde May\u0131s ay\u0131nda 678,32 MW kurulu g\u00fc\u00e7te elektrik enerjisi \u00fcretimi i\u00e7in te\u015fvik belgesi al\u0131nd\u0131.Ekonomi Bakanl\u0131\u011f\u0131`n\u0131n Yat\u0131r\u0131m Te\u015fvik Belgeleri listesi Resmi Gazete`de yay\u0131mland\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29117,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53],"tags":[68,61,5070,63,67,1009,165,16493,9114],"views":811,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29116"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=29116"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29116\/revisions"}],"predecessor-version":[{"id":29119,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29116\/revisions\/29119"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29117"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=29116"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=29116"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=29116"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}