{"id":29044,"date":"2014-07-08T14:07:47","date_gmt":"2014-07-08T11:07:47","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=29044"},"modified":"2014-07-08T14:07:47","modified_gmt":"2014-07-08T11:07:47","slug":"lavrov-guney-akimda-takvim-planlandigi-gibi-isliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lavrov-guney-akimda-takvim-planlandigi-gibi-isliyor\/","title":{"rendered":"(Turkish) Lavrov: &#8221;G\u00fcney Ak\u0131m\u2019da Takvim Planland\u0131\u011f\u0131 Gibi \u0130\u015fliyor&#8221;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/29044\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Rusya D\u0131\u015fi\u015fleri Bakan\u0131 Sergey Lavrov, G\u00fcney Ak\u0131m boru hatt\u0131 projesinde takvimin \u00f6nceden planland\u0131\u011f\u0131 gibi i\u015fledi\u011fini ve Avrupa Birli\u011fi\u2019nin projeye ili\u015fkin g\u00f6r\u00fc\u015fmeleri tekrar ba\u015flatmas\u0131 gerekti\u011fini s\u00f6yledi.<\/strong><span id=\"more-66105\"><\/span><\/p>\n<p>G\u00fcney Ak\u0131m\u2019\u0131n Karadeniz alt\u0131ndan ge\u00e7erek Rus do\u011falgaz\u0131n\u0131 Bulgaristan\u2019a ve oradan da di\u011fer Avrupa \u00fclkelerine ula\u015ft\u0131rmas\u0131 planlan\u0131yor.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-29045\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m-300x168.jpg\" alt=\"bulgaristan-g\u00fcney-ak\u0131m\" width=\"300\" height=\"168\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m-300x168.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m-500x280.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m-80x44.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/bulgaristan-g\u00fcney-ak\u0131m.jpg 841w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/p>\n<p>Bulgaristan\u2019daki, \u00f6n\u00fcm\u00fczdeki g\u00fcnlerde istifa etmeye haz\u0131rlanan Sosyalistler \u00f6nc\u00fcl\u00fc\u011f\u00fcndeki h\u00fck\u00fcmet projeyi g\u00fc\u00e7l\u00fc bir \u015fekilde destekliyordu. Ancak h\u00fck\u00fcmet daha sonra, projenin AB yasalar\u0131na uygunlu\u011fuyla ilgili \u015f\u00fcpheleri bulunan Br\u00fcksel\u2019den gelen tehditler \u00fczerine boru hatt\u0131n\u0131n in\u015fas\u0131n\u0131 ask\u0131ya alm\u0131\u015ft\u0131.<\/p>\n<p>Bulgaristan\u2019a bir ziyaret ger\u00e7ekle\u015ftiren Lavrov, \u2018Avrupa Komisyonu\u2019na tekrar temas kurma \u00e7a\u011fr\u0131s\u0131nda bulunuyor ve g\u00f6r\u00fc\u015fmelerin ba\u015far\u0131yla sonu\u00e7lanmas\u0131n\u0131 umuyoruz. \u0130yi niyet olursa her t\u00fcrl\u00fc sorunun \u00e7\u00f6z\u00fclece\u011finden eminiz. Avrupa Komisyonu ile g\u00f6r\u00fc\u015fmelerin tekrar ba\u015flayaca\u011f\u0131na g\u00fcveniyoruz\u2019 dedi.<\/p>\n<p>Bulgaristan Ba\u015fbakan\u0131 Plamen Ore\u015farski ise Lavrov\u2019un ziyareti s\u0131ras\u0131nda yapt\u0131\u011f\u0131 bir yaz\u0131l\u0131 a\u00e7\u0131klamada, AB\u2019nin G\u00fcney Ak\u0131m\u2019\u0131n yasalara uygun oldu\u011fu g\u00f6r\u00fc\u015f\u00fcn\u00fc kabul edece\u011fi konusunda iyimser olduklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Moskova, Avrupa Birli\u011fi\u2019ni projeye ortak \u00fclkeler \u00fczerinde bask\u0131 kurmakla su\u00e7luyor.<\/p>\n<p>Lavrov\u2019un Pazartesi g\u00fcnk\u00fc ziyareti s\u0131ras\u0131nda ba\u015fkent Sofya protestolara da sahne oldu. Cumhurba\u015fkanl\u0131\u011f\u0131 binas\u0131 \u00f6n\u00fcndeki bir grup, enerjide Rusya\u2019ya ba\u011f\u0131ml\u0131l\u0131\u011f\u0131 protesto amac\u0131yla g\u00f6steri d\u00fczenledi. Milliyet\u00e7i Ataka partisi \u00f6nc\u00fcl\u00fc\u011f\u00fcndeki bir grup ise G\u00fcney Ak\u0131m\u2019a destek i\u00e7in g\u00f6steri d\u00fczenledi. Ukrayna bayraklar\u0131 ve \u2018Katil Putin\u2019 pankartlar\u0131 ta\u015f\u0131yan \u00fc\u00e7\u00fcnc\u00fc bir grup ise May\u0131s ay\u0131nda K\u0131r\u0131m\u2019da tutuklanan Ukraynal\u0131 bir y\u00f6netmenin serbest b\u0131rak\u0131lmas\u0131n\u0131 istedi.<\/p>\n<p>Do\u011falgaz ihtiyac\u0131n\u0131n neredeyse tamam\u0131n\u0131 Rusya\u2019dan kar\u015f\u0131layan Bulgaristan\u2019daki n\u00fckleer reakt\u00f6rler de Rusya\u2019dan gelen yak\u0131t\u0131 kullan\u0131yor ve \u00fclkedeki tek petrol rafinerisi de Rusya\u2019ya ait.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.euractiv.com.tr\/enerji\/article\/lavrov-guney-akimda-takvim-planlandigi-gibi-isliyor-029941\" target=\"_blank\" rel=\"nofollow\">euractiv<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Rusya D\u0131\u015fi\u015fleri Bakan\u0131 Sergey Lavrov, G\u00fcney Ak\u0131m boru hatt\u0131 projesinde takvimin \u00f6nceden planland\u0131\u011f\u0131 gibi i\u015fledi\u011fini ve Avrupa Birli\u011fi\u2019nin projeye ili\u015fkin g\u00f6r\u00fc\u015fmeleri tekrar ba\u015flatmas\u0131 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":29045,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[1192,2132,3323,2859,6731,16456,4949,1772,16457],"views":505,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29044"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=29044"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29044\/revisions"}],"predecessor-version":[{"id":29046,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/29044\/revisions\/29046"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/29045"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=29044"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=29044"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=29044"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}