{"id":28797,"date":"2014-07-03T14:59:46","date_gmt":"2014-07-03T11:59:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=28797"},"modified":"2014-07-03T14:59:46","modified_gmt":"2014-07-03T11:59:46","slug":"ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak\/","title":{"rendered":"(Turkish) \u0130ngiltere \u00dclkenin Cumbria B\u00f6lgesinde N\u00fckleer Santral Kuracak!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/28797\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130ngiliz h\u00fck\u00fcmeti web sitesinde yer alan a\u00e7\u0131klamaya g\u00f6re, yakla\u015f\u0131k 10 milyar sterline mal olacak \u201cThe Moorside\u201d n\u00fckleer g\u00fc\u00e7 santrali, \u00fclkenin kuzey b<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-28798\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak-300x197.jpg\" alt=\"ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak-300x197.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak-500x329.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/07\/ingiltere-ulkenin-cumbria-bolgesinde-nukleer-santral-kuracak.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>at\u0131s\u0131ndaki Cumbria b\u00f6lgesinde in\u015faa edilecek.<\/strong><span id=\"more-65952\"><\/span><\/p>\n<p>Projenin y\u00fczde 60\u2032\u0131 Japon Toshiba\u2019ya, y\u00fczde 40\u2032\u0131 Frans\u0131z GDF Suez firmas\u0131na ait olacak.<\/p>\n<p>Toplam 3 reakt\u00f6r\u00fc bulunacak n\u00fckleer santral, tamamland\u0131\u011f\u0131nda \u0130ngiltere\u2019nin elektrik ihtiyac\u0131n\u0131n y\u00fczde 7\u2032sini (3 bin 400 megavat) sa\u011flayacak.<\/p>\n<p>Projenin, 14 bin ki\u015fiye i\u015f imkan\u0131 sa\u011flamas\u0131 bekleniyor. Santral devreye al\u0131nd\u0131\u011f\u0131nda da bin ki\u015fi istihdam edilecek.<\/p>\n<p>\u0130ngiltere\u2019de ilk ticari n\u00fckleer reakt\u00f6r 1956 y\u0131l\u0131nda kuruldu. \u00dclkede 9 n\u00fckleer santralde 16 aktif reakt\u00f6r bulunuyor. \u0130ngiltere en son n\u00fckleer g\u00fc\u00e7 santralini 1995 y\u0131l\u0131nda devreye alm\u0131\u015ft\u0131.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.sabah.com.tr\/Ekonomi\/2014\/07\/02\/ingiltere-nukleer-santral-kuracak\" target=\"_blank\" rel=\"nofollow\">Sabah<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130ngiliz h\u00fck\u00fcmeti web sitesinde yer alan a\u00e7\u0131klamaya g\u00f6re, yakla\u015f\u0131k 10 milyar sterline mal olacak \u201cThe Moorside\u201d n\u00fckleer g\u00fc\u00e7 santrali, \u00fclkenin kuzey bat\u0131s\u0131ndaki Cumbria [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":28798,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,43],"tags":[16328,63,67,1009,165,5615,1092,16330,16329,71,21,3020,88],"views":1140,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28797"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=28797"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28797\/revisions"}],"predecessor-version":[{"id":28799,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28797\/revisions\/28799"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/28798"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=28797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=28797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=28797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}