{"id":28526,"date":"2014-06-27T09:49:30","date_gmt":"2014-06-27T06:49:30","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=28526"},"modified":"2014-06-27T09:49:30","modified_gmt":"2014-06-27T06:49:30","slug":"nordex-uc-yeni-anlasmaya-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/nordex-uc-yeni-anlasmaya-imza-atti\/","title":{"rendered":"(Turkish) Nordex \u00dc\u00e7 Yeni Anla\u015fmaya \u0130mza Att\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/28526\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Nordex, b\u00fcy\u00fcyen T\u00fcrkiye r\u00fczgar enerjisi piyasas\u0131nda 44.4 MW toplam kapasiteli \u00fc\u00e7 yeni anla\u015fmaya imza atarak yeni yat\u0131r\u0131mc\u0131lar\u0131 portf\u00f6y\u00fcne katm\u0131\u015f oldu. \u00dc\u00e7 proje de 2015 y\u0131l\u0131 bahar ve yaz aylar\u0131nda ge<\/strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb3.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-28527\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb3.jpg\" alt=\"timthumb\" width=\"295\" height=\"298\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb3.jpg 295w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb3-49x50.jpg 49w\" sizes=\"(max-width: 295px) 100vw, 295px\" \/><\/a><strong>r\u00e7ekle\u015ftirecek.<\/strong><\/p>\n<p>Nordex\u2019in yeni t\u00fcrbinlerinden biri olan N117\/3000 Delta t\u00fcrbini pazardaki \u00e7\u0131k\u0131\u015f\u0131n\u0131, Sancak Enerji\u2019nin ilk projesi olan Urla RES projesi ile devam ettiriyor. \u0130zmir\u2019in Urla il\u00e7esinde bulunan r\u00fczgar santrali projesine alt\u0131 adet N117\/3000 t\u00fcrbin sa\u011flayacak olan Nordex, kule ve kanatlar\u0131 T\u00fcrkiye\u2019den tedarik edecek.<\/p>\n<p>Nordex\u2019in ikinci projesi ise, dokuz adet N117\/2400 Gamma t\u00fcrbinden olu\u015fan Yenihisar projesi olacak. Yeni Enerji\u2019ye ait 21.6MW kapasiteli bu santral \u015firketin ilk r\u00fczgar enerjisi projesi ve Ayd\u0131n \u015fehri yak\u0131nlar\u0131nda g\u00fcney sahil \u015feridinde kurulacak. Bu projede ise \u00e7elik kuleler yerli olarak sa\u011flanacak.<\/p>\n<p>Son olarak, B\u0131\u00e7ak\u00e7\u0131lar Elektrik\u2019e ait iki N117\/2400 t\u00fcrbinden olu\u015facak olan Pitane r\u00fczgar enerjisi santrali \u0130zmir\u2019de kurulacak. B\u0131\u00e7ak\u00e7\u0131lar Elektrik b\u00f6ylece temiz enerji alan\u0131ndaki ilk yat\u0131r\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftirmi\u015f olacak. Santralin 7.4m\/s\u2019lik y\u0131ll\u0131k r\u00fczgar h\u0131z\u0131 ile %40 oran\u0131nda bir kapasite fakt\u00f6r\u00fcne ula\u015fmas\u0131 bekleniyor. Kuleler ve kanatlar\u0131n T\u00fcrkiye\u2019de \u00fcretilecek olmas\u0131, projenin yerel katk\u0131 pay\u0131ndan maksimum d\u00fczeyde yararlanmas\u0131n\u0131 sa\u011flayacak. T\u00fcrkiye\u2019deki katk\u0131 pay\u0131 y\u00f6netmeli\u011fine g\u00f6re kilovat saat ba\u015f\u0131na 7.3 dolar\/sent olan al\u0131m garantisi, kule ve kanatlardan gelen katk\u0131 pay\u0131 oranlar\u0131 ile kilovat saat ba\u015f\u0131na 8.7 dolar\/sent de\u011ferine ula\u015farak projelere ciddi bir katk\u0131 sa\u011fl\u0131yor.<\/p>\n<p>Kaynak: \u00a0B\u00fcltenler<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Nordex, b\u00fcy\u00fcyen T\u00fcrkiye r\u00fczgar enerjisi piyasas\u0131nda 44.4 MW toplam kapasiteli \u00fc\u00e7 yeni anla\u015fmaya imza atarak yeni yat\u0131r\u0131mc\u0131lar\u0131 portf\u00f6y\u00fcne katm\u0131\u015f oldu. \u00dc\u00e7 proje de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":28527,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[1768,16194,68,63,9577,2455,474,69,16,312,14590,842,4130,1286,16195],"views":835,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28526"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=28526"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28526\/revisions"}],"predecessor-version":[{"id":28528,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/28526\/revisions\/28528"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/28527"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=28526"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=28526"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=28526"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}