{"id":27877,"date":"2014-06-12T16:13:26","date_gmt":"2014-06-12T13:13:26","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27877"},"modified":"2014-06-12T16:14:04","modified_gmt":"2014-06-12T13:14:04","slug":"ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim\/","title":{"rendered":"(Turkish) Ataseven: R\u00fczg\u00e2r\u0131n \u00d6n\u00fcn\u00fc A\u00e7\u0131n Hedefi 12`den Vural\u0131m!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27877\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven, mevcut \u015fartlarda 2023`te 20 bin MW`lik r\u00fczg\u00e2r santrali kurulu g\u00fcc\u00fc hedefinin ancak yar\u0131s\u0131na ula\u015f\u0131labilece\u011fini s\u00f6yledi. Atasev<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-27878\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim-300x220.jpg\" alt=\"ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim\" width=\"300\" height=\"220\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim-300x220.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim-68x50.jpg 68w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/ataseven-ruzgarin-onunu-acin-hedefi-12den-vuralim.jpg 495w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>en, gerekli mevzuat d\u00fczenlemeleri yap\u0131l\u0131rsa hedefe ula\u015f\u0131labilece\u011fini belirtti.<\/strong><\/p>\n<p>T\u00fcrkiye`de 1990`larda ba\u015flayan, 2000`li y\u0131llarda artan r\u00fczg\u00e2r enerji santrali (RES) yat\u0131r\u0131mlar\u0131, t\u00fcm \u00e7abalara ra\u011fmen istenilen seviyeye ve h\u0131za ula\u015fabilmi\u015f de\u011fil. Bunun \u00f6n\u00fcnde mevzuat ve uygulamadan kaynaklanan kimi g\u00fc\u00e7l\u00fckler var. \u0130n\u015faat, orman ve imar izin s\u00fcre\u00e7lerindeki t\u0131kanmalar, \u00e7ok say\u0131da lisanslanm\u0131\u015f RES projesini lisans iptaliyle kar\u015f\u0131 kar\u015f\u0131ya b\u0131rakt\u0131. Mevcut ve potansiyel yat\u0131r\u0131mc\u0131lar\u0131n g\u00f6z\u00fc, bu sorunun a\u015f\u0131lmas\u0131n\u0131 sa\u011flayacak ad\u0131mlar atmas\u0131 beklenen Meclis`te. Ayr\u0131ca r\u00fczg\u00e2rdan elektrik \u00fcretimini cazip k\u0131lacak ad\u0131mlar da bekleniyor.<\/p>\n<p>T\u00dcREB Ba\u015fkan\u0131 Mustafa Serdar Ataseven, D\u00dcNYA Gazetesi`nin r\u00fczg\u00e2r yat\u0131r\u0131mlar\u0131n\u0131n durumuna, \u00f6n\u00fcndeki engellere ve \u00e7\u00f6z\u00fcm \u00f6nerilerine ili\u015fkin sorular\u0131n\u0131 cevaplad\u0131.<\/p>\n<p><em><strong>R\u00fczg\u00e2r\u0131n \u00f6n\u00fcndeki engeller ve \u00e7\u00f6z\u00fcm \u00f6nerileriniz?<\/strong><\/p>\n<p><\/em>Orman izinleri ge\u00e7en y\u0131ldan beri yat\u0131r\u0131mc\u0131lara zor g\u00fcnler ya\u015fatt\u0131 ve ya\u015fatmaya devam ediyor. Baz\u0131 b\u00f6lgeler RES yat\u0131r\u0131mlar\u0131na kapat\u0131lm\u0131\u015f durumda. Bu konuda proje bazl\u0131 inceleme yap\u0131lmas\u0131n\u0131 istiyoruz. Ma\u011fduriyet h\u00e2l\u00e2 devam ediyor. Bir k\u0131s\u0131m RES projeleri de in\u015faat izin s\u00fcre\u00e7lerine tak\u0131lm\u0131\u015f durumda. Belge ve izin eksiklerini tamamlayamad\u0131\u011f\u0131 i\u00e7in lisans iptaliyle kar\u015f\u0131 kar\u015f\u0131ya kalan projelerin durumunu 2 May\u0131s sendromu olarak nitelendiriyoruz. Bunlarla ilgili bir \u00e7\u00f6z\u00fcm s\u00fcreci ba\u015flad\u0131 ama Meclis`ten hen\u00fcz d\u00fczenleme \u00e7\u0131km\u0131\u015f de\u011fil.<\/p>\n<p><strong>Haberin <a href=\"http:\/\/www.enerjigunlugu.net\/ataseven:-ruzg\u00e2rin-onunu-acin-hedefi-12den-vuralim_8978.html\" target=\"_blank\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye R\u00fczg\u00e2r Enerjisi Birli\u011fi (T\u00dcREB) Ba\u015fkan\u0131 Mustafa Serdar Ataseven, mevcut \u015fartlarda 2023`te 20 bin MW`lik r\u00fczg\u00e2r santrali kurulu g\u00fcc\u00fc hedefinin ancak yar\u0131s\u0131na ula\u015f\u0131labilece\u011fini [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27878,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[68,63,67,1009,165,3388,69,16,312,1682,3390],"views":761,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27877"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27877"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27877\/revisions"}],"predecessor-version":[{"id":27880,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27877\/revisions\/27880"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27878"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27877"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27877"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27877"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}