{"id":27874,"date":"2014-06-12T16:08:07","date_gmt":"2014-06-12T13:08:07","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27874"},"modified":"2014-06-12T16:08:07","modified_gmt":"2014-06-12T13:08:07","slug":"cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi\/","title":{"rendered":"(Turkish) \u00c7e\u015fme-Ovac\u0131k\u2019taki RES Projesine Arsa Rant\u0131 Olu\u015fturulmas\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27874\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130zmir\u00a0\u00c7e\u015fme\u2019de r\u00fczg\u00e2r enerjisi santrallar\u0131na (RES) y\u00f6nelik \u015fik\u00e2yetlerle ilgili a\u00e7\u0131klama yapan ABK Y\u00f6netim Kurulu Ba\u015fkan\u0131 Bar\u0131\u015f Tansever, \u201cB\u00f6lgede ya\u015fam alan\u0131 yok. Bebek \u0130n\u015faat \u2018arsa rant\u0131\u2019 olu\u015fturmaya\u00a0\u00e7al\u0131\u015f\u0131yor\u201d dedi.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019nin enerjide d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131n\u0131 <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-27875\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi-300x201.jpg\" alt=\"OLYMPUS DIGITAL CAMERA\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi-300x201.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi-500x335.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi-74x50.jpg 74w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/cesme-ovaciktaki-res-projesine-arsa-ranti-olusturulmasi.jpg 600w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>azaltmaya \u00e7al\u0131\u015fan projeler h\u0131zlan\u0131rken, \u0130zmir \u00c7e\u015fme\u2019de R\u00fczg\u00e2r Enerjisi Santralleri\u2019ne (RES) y\u00f6nelik ilgin\u00e7 bir tart\u0131\u015fma ya\u015fan\u0131yor. \u00c7e\u015fme S\u00fcrd\u00fcr\u00fclebilir Ya\u015fam Platformu, \u201cBu b\u00f6lgede yap\u0131lacak santrallerle ilgili 2000\u2019li y\u0131llardan bu yana \u00e7al\u0131\u015fma yap\u0131lmas\u0131na ra\u011fmen, ge\u00e7ti\u011fimiz y\u0131l toprak sahiplerine \u2018acele kamula\u015ft\u0131rma\u2019 ile ilgili tebligatlar ula\u015ft\u0131r\u0131l\u0131nca halk\u0131n haberi oldu\u201d derken, b\u00f6lgede 16 MW\u2019l\u0131k RES yat\u0131r\u0131m\u0131 yapan ABK Enerji Elektronik \u00dcretim Y\u00f6netim Kurulu Ba\u015fkan\u0131 Bar\u0131\u015f Tansever, \u201cB\u00f6lgede yerle\u015fim de yok tar\u0131m alan\u0131 da bulunmuyor. Buradaki tek s\u0131k\u0131nt\u0131 Bebek \u0130n\u015faat adl\u0131 \u015firketin arsa rant\u0131 yaratmas\u0131\u201d dedi.<\/p>\n<h2>\u0130mar izni verilmiyor<\/h2>\n<p>\u00c7e\u015fme-Ovac\u0131k\u2019ta 24 milyon Euro\u2019luk yat\u0131r\u0131mla hayata ge\u00e7irmeyi planlad\u0131klar\u0131 RES projesiyle ilgili bilgi veren Bar\u0131\u015f Tansever, \u015funlar\u0131 s\u00f6yledi: \u201c16 MW g\u00fcc\u00fcndeki projemiz do\u011fal S\u0130T alan\u0131nda yer al\u0131yor. 2005\u2019de y\u00fcr\u00fcrl\u00fc\u011fe giren \u2018yenilenebilir enerji yasas\u0131\u2019n\u0131n maddeleri ilgili kurullardan izin almak \u015fart\u0131yla buraya RES izni veriyor. Enerji projesi \u00fcretime ge\u00e7ti\u011fi takdirde b\u00f6lgedeki S\u0130T stat\u00fcs\u00fc 49 y\u0131ll\u0131\u011f\u0131na korunuyor ve konut projelerinin \u00f6n\u00fcne ge\u00e7iyor. Bu b\u00f6lgede \u2018bir g\u00fcn imar izni \u00e7\u0131kar\u2019 diye arsa toplayan Bebek \u0130n\u015faat adl\u0131 \u015firket bu durumu fark edince \u00e7evrecileri ayakland\u0131rmaya \u00e7al\u0131\u015ft\u0131. Ancak RES, en temiz enerji kaynaklar\u0131ndan birisi. \u00c7evre katliam\u0131 diye bir \u015fey s\u00f6z konusu bile de\u011fil. Toplam 4 bin dekarl\u0131k santral sahas\u0131nda toplam in\u015faat alan\u0131 2 bin metrekare. 18 ayd\u0131r Akdeniz \u00dcniversitesi \u00f6\u011fretim g\u00f6revlileri; yaban hayat\u0131 koruma, peyzaj geri d\u00f6n\u00fc\u015f\u00fcm ve ku\u015f g\u00f6\u00e7leri ad\u0131na \u00e7al\u0131\u015fmalar yap\u0131yor.\u201d<\/p>\n<p><strong>Haberin Devam\u0131 i\u00e7in <a href=\"http:\/\/www.hurriyet.com.tr\/ekonomi\/26595563.asp\" target=\"_blank\" rel=\"nofollow\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: H\u00fcrriyet<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130zmir\u00a0\u00c7e\u015fme\u2019de r\u00fczg\u00e2r enerjisi santrallar\u0131na (RES) y\u00f6nelik \u015fik\u00e2yetlerle ilgili a\u00e7\u0131klama yapan ABK Y\u00f6netim Kurulu Ba\u015fkan\u0131 Bar\u0131\u015f Tansever, \u201cB\u00f6lgede ya\u015fam alan\u0131 yok. Bebek \u0130n\u015faat \u2018arsa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[15827,15828,15829,63,67,1009,165,15830,474,69,16,231,15831,312,1286,105],"views":1032,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27874"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27874"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27874\/revisions"}],"predecessor-version":[{"id":27876,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27874\/revisions\/27876"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27875"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27874"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27874"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27874"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}