{"id":27767,"date":"2014-06-10T17:46:53","date_gmt":"2014-06-10T14:46:53","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27767"},"modified":"2014-06-10T17:46:53","modified_gmt":"2014-06-10T14:46:53","slug":"bakanlar-kurulundan-acele-kamulastirma-kararlari","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bakanlar-kurulundan-acele-kamulastirma-kararlari\/","title":{"rendered":"(Turkish) Bakanlar Kurulu\u2019ndan Acele Kamula\u015ft\u0131rma Kararlar\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27767\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Bakanlar Kurulu, hidroelektrik santrali, r\u00fczgar enerjisi santrali ve iletim hatt\u0131 projeleri kapsam\u0131nda baz\u0131 ta\u015f\u0131nmazlar\u0131n acele kamula\u015ft\u0131r\u0131lmas\u0131na karar verdi. Acele kamula\u015ft\u0131rma kararlar\u0131 Resmi Gazete\u2019de yay\u0131mland\u0131.<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb.jpg\"><img loading=\"lazy\" class=\"alignright size-full wp-image-27768\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb.jpg\" alt=\"timthumb\" width=\"291\" height=\"296\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb.jpg 291w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/timthumb-49x50.jpg 49w\" sizes=\"(max-width: 291px) 100vw, 291px\" \/><\/a>Buna g\u00f6re, Rize\u2019de kurulacak Melikom Reg\u00fclat\u00f6r\u00fc ve Hidroelektrik Santralinin yap\u0131m\u0131 amac\u0131yla baz\u0131 ta\u015f\u0131nmazlar\u0131n, tapuda Hazine ad\u0131na tescil edilmek \u00fczere Maliye Bakanl\u0131\u011f\u0131 taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lmas\u0131; Bakanl\u0131\u011f\u0131n yaz\u0131s\u0131 \u00fczerine, Bakanlar Kurulu\u2019nca kararla\u015ft\u0131r\u0131ld\u0131.<\/p>\n<p>\u0130zmir\u2019in \u00c7e\u015fme \u0130l\u00e7esinde kurulacak Ala\u00e7at\u0131 R\u00fczg\u00e2r Enerjisi Santralinin yap\u0131m\u0131 amac\u0131yla da baz\u0131 ta\u015f\u0131nmazlar\u0131n, tapuda Hazine ad\u0131na tescil edilmek \u00fczere Maliye Bakanl\u0131\u011f\u0131 taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lmas\u0131na; Bakanl\u0131\u011f\u0131n yaz\u0131s\u0131 \u00fczerine, Bakanlar Kurulu\u2019nca karar verildi.<\/p>\n<p>Ayr\u0131ca Ba\u011flant\u0131 anla\u015fmas\u0131 uyar\u0131nca tesis edilecek \u201c380 kV Yukar\u0131 Kalek\u00f6y Hes TM-A\u015fa\u011f\u0131 Kalek\u00f6y Hes TM Enerji \u0130letim Hatt\u0131 Projesi\u201d kapsam\u0131nda baz\u0131 ta\u015f\u0131nmazlarda direk yerlerinin m\u00fclkiyet \u015feklinde, iletken sal\u0131n\u0131m gabarisinin ise irtifak hakk\u0131 kurulmak suretiyle T\u00fcrkiye Elektrik \u0130letim Anonim \u015eirketi Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc taraf\u0131ndan acele kamula\u015ft\u0131r\u0131lmas\u0131; Enerji Ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131\u2019n\u0131n yaz\u0131s\u0131 \u00fczerine, Bakanlar Kurulu\u2019nca uygun bulundu.<\/p>\n<p>Kaynak: \u00a0AA<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bakanlar Kurulu, hidroelektrik santrali, r\u00fczgar enerjisi santrali ve iletim hatt\u0131 projeleri kapsam\u0131nda baz\u0131 ta\u015f\u0131nmazlar\u0131n acele kamula\u015ft\u0131r\u0131lmas\u0131na karar verdi. Acele kamula\u015ft\u0131rma kararlar\u0131 Resmi Gazete\u2019de [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27768,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[4917,15745,63,35370,1090,15746,15747,15652,1190,1388,231],"views":678,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27767"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27767"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27767\/revisions"}],"predecessor-version":[{"id":27769,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27767\/revisions\/27769"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27768"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27767"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27767"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27767"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}