{"id":27641,"date":"2014-06-07T17:50:40","date_gmt":"2014-06-07T14:50:40","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27641"},"modified":"2014-06-07T17:50:40","modified_gmt":"2014-06-07T14:50:40","slug":"elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin\/","title":{"rendered":"(Turkish) Elektri\u011fin T\u00fcm\u00fc Sat\u0131lacaksa Lisansl\u0131 Lisanss\u0131z Ayr\u0131m\u0131 Kalks\u0131n&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27641\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>(G\u00fcne\u015f Enerjisinin \u00d6n\u00fcn\u00fc A\u00e7acak 21 \u00d6neri &#8211; 7 \/ Ate\u015f U\u011furel) T\u00fcm elektri\u011fin sat\u0131ld\u0131\u011f\u0131 projelerde lisansl\u0131-lisanss\u0131z ayr\u0131m\u0131 kalkmal\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-27642\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin-300x203.jpg\" alt=\"elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin-300x203.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayrimi-kalksin.jpg 376w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Bu bir s\u00fcredir Ankara`n\u0131n da g\u00fcndeminde olan \u00e7ok \u00f6nemli bir mevzudur ve orta vadede mutlaka ger\u00e7ekle\u015fecektir.<\/p>\n<p>\u0130ster 10 kW olsun ister 10 MW, \u00fcretilen elektri\u011fin tamam\u0131n\u0131n sat\u0131ld\u0131\u011f\u0131 uygulamalar tek \u00e7at\u0131 alt\u0131nda toplanmal\u0131 ve ayn\u0131 hukuki haklara sahip olmal\u0131d\u0131r<\/p>\n<p>\u015eu anda 999 kW proje yapmak ile 1001 kW proje yapmak aras\u0131nda elektriksel olarak 2 kW, b\u00fcrokratik olarak ise da\u011flar kadar fark vard\u0131r.<\/p>\n<p><strong>Haberin <a href=\"http:\/\/www.enerjigunlugu.net\/elektrigin-tumu-satilacaksa-lisansli-lisanssiz-ayr_8871.html\" target=\"_blank\">Devam\u0131 \u0130\u00e7in TIKLAYINIZ&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.(G\u00fcne\u015f Enerjisinin \u00d6n\u00fcn\u00fc A\u00e7acak 21 \u00d6neri &#8211; 7 \/ Ate\u015f U\u011furel) T\u00fcm elektri\u011fin sat\u0131ld\u0131\u011f\u0131 projelerde lisansl\u0131-lisanss\u0131z ayr\u0131m\u0131 kalkmal\u0131. Bu bir s\u00fcredir Ankara`n\u0131n da [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27642,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[15452,68,63,67,1009,165,227,13,12159,1405,803],"views":871,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27641"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27641"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27641\/revisions"}],"predecessor-version":[{"id":27643,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27641\/revisions\/27643"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27642"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27641"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27641"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27641"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}