{"id":27585,"date":"2014-06-06T16:24:50","date_gmt":"2014-06-06T13:24:50","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27585"},"modified":"2014-06-06T16:25:11","modified_gmt":"2014-06-06T13:25:11","slug":"gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisi Kabul \u0130\u015flemi Yerel Da\u011f\u0131t\u0131c\u0131ya B\u0131rak\u0131lmal\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27585\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>(G\u00fcne\u015f Enerjisinin \u00d6n\u00fcn\u00fc A\u00e7acak 21 \u00d6neri &#8211; 6 \/ Ate\u015f U\u011furel) G\u00fcne\u015ften elektrik \u00fcretecek tesislerin t\u00fcm kabul i\u015flemlerini sadece lokal da\u011f\u0131t\u0131m \u015firketi yapmal\u0131.<\/strong><\/p>\n<p>\u00dclkemizde \u00f6zellikle \u00f6zt\u00fcketim modelinde t\u00fcm b\u00fcrokratik i\u015flemleri, proje kabulu ve onay\u0131 dahil olmak \u00fczere, <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-27588\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali-300x199.jpg\" alt=\"gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali\" width=\"300\" height=\"199\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali-300x199.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali-500x332.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali-75x50.jpg 75w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birakilmali.jpg 637w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>SADECE b\u00f6lgedeki da\u011f\u0131t\u0131m \u015firketi yapmal\u0131d\u0131r. \u00d6zelle\u015ftirme s\u00fcrecinde milyarlarca dolar bedel \u00f6deyerek \u00e7ok uzun s\u00fcreli\u011fine da\u011f\u0131t\u0131m haklar\u0131n\u0131 alan \u015firketler, mutlaka k\u00fc\u00e7\u00fck \u00f6l\u00e7ekli g\u00fcne\u015f enerjisi santrallerinin teknik onay\u0131n\u0131 yapabilecek kapasiteye sahiptirler.<\/p>\n<p>Bir g\u00fcne\u015f enerjisi projesinin planlanmas\u0131ndan i\u015fletmeye al\u0131nmas\u0131na ge\u00e7en s\u00fcrede ne kadar az devlet kurumu m\u00fcdahil olursa, sistem o kadar h\u0131zl\u0131 ve sa\u011fl\u0131kl\u0131 ilerler.<\/p>\n<p>T\u00fcrkiye`nin y\u00fczlerce farkl\u0131 b\u00f6lgesinde, il\u00e7esinde yap\u0131lacak 1kW \u00fcst\u00fc t\u00fcm uygulamalar i\u00e7in Ankara`dan TEDA\u015e ekibinin gelmesi beklenmekte \u015fu anda. Bunun mant\u0131kl\u0131 olmad\u0131\u011f\u0131 \u00e7ok net g\u00f6z\u00fckmektedir. \u00dcstelik kabul i\u015flemlerinde de standart d\u0131\u015f\u0131 bir \u00e7ok olay ya\u015fand\u0131\u011f\u0131n\u0131 uygulama \u015firketleri bir\u00e7ok defa ifade etmi\u015flerdir.<\/p>\n<p>Ge\u00e7ici kabul s\u00fcrecinde (hele ki yaz d\u00f6neminde ya\u015fan\u0131rsa) ya\u015fanacak 3-4 ayl\u0131k gecikmeler, yat\u0131r\u0131mc\u0131n\u0131n pratikte bir y\u0131l kaybetmesine yol a\u00e7maktad\u0131r. Halbuki b\u00f6lgedeki da\u011f\u0131t\u0131m \u015firketi, b\u00f6lgedeki kurulumlara \u00e7ok daha h\u0131zl\u0131 eri\u015fim sa\u011flayacakt\u0131r.<\/p>\n<p>Mevcut TEDA\u015e ekibi e\u011fitmen olarak yerel da\u011f\u0131t\u0131m \u015firketlerine s\u00fcrekli e\u011fitim vermelidir ge\u00e7i\u015f s\u00fcrecinde.<\/p>\n<p>S\u00fcre\u00e7 i\u00e7inde ya\u015fanabilecek hukuki sorunlar i\u00e7in de EPDK h\u0131zl\u0131, adil ve \u00e7abuk bir \u015fekilde \u00e7\u00f6z\u00fcm \u00fcretmelidir.<\/p>\n<p>Ba\u015fvurular\u0131n ve yine buna paralel olarak olu\u015fabilecek \u015fikayetlerin \u015feffaf ve online ortamda iletilmesi \u00e7ok faydal\u0131 olacakt\u0131r.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/gunes-enerjisi-kabul-islemi-yerel-dagiticiya-birak_8854.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.(G\u00fcne\u015f Enerjisinin \u00d6n\u00fcn\u00fc A\u00e7acak 21 \u00d6neri &#8211; 6 \/ Ate\u015f U\u011furel) G\u00fcne\u015ften elektrik \u00fcretecek tesislerin t\u00fcm kabul i\u015flemlerini sadece lokal da\u011f\u0131t\u0131m \u015firketi yapmal\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27588,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[15452,1079,63,67,1009,165,227,13,1405,803,15457,1216],"views":785,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27585"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27585"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27585\/revisions"}],"predecessor-version":[{"id":27589,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27585\/revisions\/27589"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27588"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27585"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27585"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27585"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}