{"id":27488,"date":"2014-06-05T15:38:34","date_gmt":"2014-06-05T12:38:34","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=27488"},"modified":"2014-06-05T18:30:30","modified_gmt":"2014-06-05T15:30:30","slug":"turk-energo-gurcistanda-1-4-milyar-euroluk-yatirima-imza-atti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/turk-energo-gurcistanda-1-4-milyar-euroluk-yatirima-imza-atti\/","title":{"rendered":"(Turkish) T\u00fcrk ENERGO, G\u00fcrcistan&#8217;da 1.4 Milyar Euro&#8217;luk Yat\u0131r\u0131ma \u0130mza Att\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/27488\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrk firmas\u0131 ENERGO Windpower,\u00a01.4 milyar euro yat\u0131r\u0131mla G\u00fcrcistan\u2019\u0131n en b\u00fcy\u00fck enerji yat\u0131r\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftirecek. G\u00fcrcistan\u2019da hayata ge\u00e7irilmesi planlanan r\u00fczgar santrallerine ili\u015fkin imza Energo Windpower Ltd. Y\u00f6netim Kurulu Ba\u015fkan\u0131\u00a0Yusuf Ziya G\u00f6ksu taraf\u0131ndan Tiflis\u2019te at\u0131ld\u0131.<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-27489\" title=\"gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar-300x152.jpg\" alt=\"\" width=\"300\" height=\"152\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar-300x152.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar-500x254.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar-80x40.jpg 80w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/06\/gurcistan-energo-windpower-turkiye-ruzgar-yatirim-ruzgar.jpg 824w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>G\u00fcrcistan\u2019da kurulmas\u0131 plananlanan r\u00fczgar santrallerinin toplam kurulu g\u00fcc\u00fc\u00a01.450 megavat\u00a0olarak planlan\u0131yor. R\u00fczgar santrallerinin toplam yat\u0131r\u0131m maliyeti 1.4 milyar euro olarak hesapland\u0131.<\/p>\n<p>\u0130mzalanan mutabakata g\u00f6re;\u00a0Poti, Kutaisi, Chorokhi, Sabueti, Gori, Kaspi, Samgori, Rustavi, Paravani ve\u00a0Akhalkalaki olmak \u00fczere toplam 9 b\u00f6lgede 33 ay boyunca r\u00fczgar verileri analiz edilecek. Bu a\u015faman\u0131n toplam maliyetinin 5-7 milyon dolar olmas\u0131 bekleniyor.<\/p>\n<p>Bakan G\u00f6ksu\u2019nun verdi\u011fi bilgiye g\u00f6re, tesislerin kurulumunda 1.000 ki\u015finin \u00fczerinde istihdam sa\u011flanacak. G\u00f6ksu, G\u00fcrcistan\u2019da yap\u0131lacak r\u00fczgar yat\u0131r\u0131mlar\u0131 i\u00e7in ilgili kurulu\u015flarla finansman g\u00f6r\u00fc\u015fmelerin devam\u00a0etti\u011fini s\u00f6yledi.<\/p>\n<p>Yaz\u0131n\u0131n ingilizce kayna\u011f\u0131 i\u00e7in <a href=\"http:\/\/georgien.ahk.de\/georgien\/newsletter\/construction-news-georgia\/construction-sv\/artikel\/turkish-company-may-build-wind-power-stations-in-georgia\/?cHash=73a3875a93d3301d4c2529cae53272af\" rel=\"nofollow\" target=\"_blank\">t\u0131klay\u0131n\u0131z&gt;&gt;&gt;<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrk firmas\u0131 ENERGO Windpower,\u00a01.4 milyar euro yat\u0131r\u0131mla G\u00fcrcistan\u2019\u0131n en b\u00fcy\u00fck enerji yat\u0131r\u0131m\u0131n\u0131 ger\u00e7ekle\u015ftirecek. G\u00fcrcistan\u2019da hayata ge\u00e7irilmesi planlanan r\u00fczgar santrallerine ili\u015fkin imza Energo Windpower [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":27489,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[15571,15572,15573,63,3405,15574,15575,15576,15577,15578],"views":834,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27488"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=27488"}],"version-history":[{"count":3,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27488\/revisions"}],"predecessor-version":[{"id":27491,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/27488\/revisions\/27491"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/27489"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=27488"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=27488"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=27488"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}