{"id":26762,"date":"2014-05-21T14:53:49","date_gmt":"2014-05-21T11:53:49","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26762"},"modified":"2014-05-21T14:53:49","modified_gmt":"2014-05-21T11:53:49","slug":"selge-enerjinin-ced-sureci-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/selge-enerjinin-ced-sureci-basladi\/","title":{"rendered":"(Turkish) Selge Enerji`nin \u00c7ED S\u00fcreci Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26762\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Selge Enerji`nin Mersin\u2019de kurulacak Do\u011fal Gaz Kombine \u00c7evrim Santrali projesi ile ilgili \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) s\u00fcreci ba\u015flad\u0131.<\/strong><\/p>\n<p><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/dogalgaz-cevrim-santrali.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-26763\" title=\"dogalgaz-cevrim-santrali\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/dogalgaz-cevrim-santrali-300x210.jpg\" alt=\"\" width=\"300\" height=\"210\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/dogalgaz-cevrim-santrali-300x210.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/dogalgaz-cevrim-santrali-71x50.jpg 71w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/dogalgaz-cevrim-santrali.jpg 468w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fc`nden yap\u0131lan a\u00e7\u0131klamada, Selge Enerji \u00dcretim ve Ticaret A.\u015e.\u2019nin Mersin ili Nacarl\u0131 mevkiinde yapmay\u0131 planlad\u0131\u011f\u0131 Do\u011fal Gaz Kombine \u00c7evrim Santrali projesi ile ilgili \u00c7ED s\u00fcrecinin ba\u015flad\u0131\u011f\u0131 bildirildi.<\/p>\n<p>A\u00e7\u0131klamada,\u201cProje ile ilgili olarak MERS\u0130N Valili\u011fine sunulan dosya PTD Dosyas\u0131 \u00c7evresel Etki De\u011ferlendirmesi Y\u00f6netmeli\u011fi`nin 17. maddesi do\u011frultusunda incelenmi\u015f ve uygun bulunmu\u015f olup, projeye ili\u015fkin \u00c7ED S\u00fcreci ba\u015flam\u0131\u015ft\u0131r.&#8221; denildi.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Selge Enerji`nin Mersin\u2019de kurulacak Do\u011fal Gaz Kombine \u00c7evrim Santrali projesi ile ilgili \u00c7evresel Etki De\u011ferlendirmesi (\u00c7ED) s\u00fcreci ba\u015flad\u0131. \u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26763,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[5927,3761,1301,15153],"views":1506,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26762"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26762"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26762\/revisions"}],"predecessor-version":[{"id":26765,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26762\/revisions\/26765"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26763"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26762"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26762"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26762"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}