{"id":26731,"date":"2014-05-20T15:30:54","date_gmt":"2014-05-20T12:30:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26731"},"modified":"2014-05-20T15:30:54","modified_gmt":"2014-05-20T12:30:54","slug":"ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor\/","title":{"rendered":"(Turkish) \u0130spanya\u2019n\u0131n Elektrik \u00dcretiminden Kaynakl\u0131 Karbon Sal\u0131m\u0131 Geriliyor&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26731\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>\u0130spanya\u2019da nisan ay\u0131nda elekrik \u00fcretiminin y\u00fczde 77.8 oran\u0131nda karbon sal\u0131m\u0131\u00a0 yaratmadan sa\u011fland\u0131\u011f\u0131 bildirildi. \u0130spanya elektri<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-26732\" title=\"ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor-77x50.jpg 77w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor.jpg 386w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>k da\u011f\u0131t\u0131m \u015firketi Red Electrica De Espana (REE) taraf\u0131ndan\u00a0 a\u00e7\u0131klanan verilere g\u00f6re ge\u00e7en ay \u00fclkede 18,608 GWh d\u00fczeyinde elektrik \u00fcretimi\u00a0 ger\u00e7ekle\u015fti.<\/strong><\/p>\n<p>Bu \u00fcretimin y\u00fczde 20.5\u2019ine denk gelen 4,011 GWh\u2019l\u0131k k\u0131sm\u0131 r\u00fczg\u00e2r enerjisi\u00a0 santralleri taraf\u0131ndan kar\u015f\u0131land\u0131.<\/p>\n<p>Bu d\u00f6nemde g\u00fcne\u015f enerjisinin \u00fclkenin elektrik \u00fcretimindeki pay\u0131 y\u00fczde 6.3\u00a0 olurken, t\u00fcrlerine g\u00f6re ise g\u00fcne\u015f elektri\u011fi sistemlerinin toplam \u00fcretimdeki pay\u0131\u00a0 y\u00fczde 3.9, yo\u011funla\u015ft\u0131r\u0131lm\u0131\u015f g\u00fcne\u015f enerjisi santrallerinin pay\u0131 ise y\u00fczde 2.4\u00a0 d\u00fczeyinde oldu.<\/p>\n<p>\u00dclkedeki hidroelektrik santrallerinin nisan ay\u0131 elektrik \u00fcretimindeki pay\u0131\u00a0 y\u00fczde 25.2, n\u00fckleer enerji santrallerinin pay\u0131 ise y\u00fczde 25.8 oldu.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.yesilekonomi.com\/surdurulebilirlik\/ispanyanin-elektrik-uretiminden-kaynakli-karbon-salimi-geriliyor\" target=\"_blank\">Ye\u015fik Ekonomi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.\u0130spanya\u2019da nisan ay\u0131nda elekrik \u00fcretiminin y\u00fczde 77.8 oran\u0131nda karbon sal\u0131m\u0131\u00a0 yaratmadan sa\u011fland\u0131\u011f\u0131 bildirildi. \u0130spanya elektrik da\u011f\u0131t\u0131m \u015firketi Red Electrica De Espana (REE) taraf\u0131ndan\u00a0 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26732,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49,50],"tags":[19,63,67,1009,165,2326,227,13,1325,4353,15130,15131,11665,474,69,16,5132],"views":782,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26731"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26731"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26731\/revisions"}],"predecessor-version":[{"id":26733,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26731\/revisions\/26733"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26732"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26731"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26731"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26731"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}