{"id":26617,"date":"2014-05-17T10:22:46","date_gmt":"2014-05-17T07:22:46","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26617"},"modified":"2014-05-17T10:22:46","modified_gmt":"2014-05-17T07:22:46","slug":"siemens-13-milyar-dolara-rolls-royceun-enerji-birimini-aldi-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siemens-13-milyar-dolara-rolls-royceun-enerji-birimini-aldi-2\/","title":{"rendered":"(Turkish) Siemens, 1,3 Milyar Dolara Rolls Royce\u2019un Enerji Birimini Ald\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26617\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Alman firmas\u0131 Siemens, General Electric ve ABB ile aras\u0131ndaki karl\u0131l\u0131k fark\u0131n\u0131 kapatabilmek i\u00e7in 1,3 milyar dolara Rolls Royce\u2019un enerji varl\u0131klar\u0131n\u0131 alma karar\u0131 ald\u0131.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-26618\" title=\"siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition-300x206.jpg\" alt=\"\" width=\"300\" height=\"206\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition-300x206.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition-500x344.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-rolls-royce-enerji-satin-aldi-milyar-dolar-ge-abb-acqusition.jpg 625w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>Siemens, sat\u0131n alma i\u00e7in \u00a3785 million ($1.32 billion) \u00f6deyecek.<\/p>\n<p>Siemens, gaz t\u00fcrbinleri ve kompres\u00f6rleri \u00fcreten b\u00f6l\u00fcm\u00fcn\u00fc alarak, enerji \u00fcretimi b\u00f6l\u00fcm\u00fcn\u00fc\u00a0 kuvvetlendirecek ve sa\u011fl\u0131k\u00a0 birimini ise ayr\u0131 y\u00f6netecek. Yapaca\u011f\u0131 yeniden yap\u0131land\u0131rma ile verimlili\u011fin 1 milyar euro artmas\u0131 hedefleniyor.<\/p>\n<p>Kaynak: Enerji Enstit\u00fcs\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Alman firmas\u0131 Siemens, General Electric ve ABB ile aras\u0131ndaki karl\u0131l\u0131k fark\u0131n\u0131 kapatabilmek i\u00e7in 1,3 milyar dolara Rolls Royce\u2019un enerji varl\u0131klar\u0131n\u0131 alma karar\u0131 ald\u0131. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26618,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[8046,785,11369,1053],"views":726,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26617"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26617"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26617\/revisions"}],"predecessor-version":[{"id":26620,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26617\/revisions\/26620"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26618"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}