{"id":26612,"date":"2014-05-16T16:15:59","date_gmt":"2014-05-16T13:15:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26612"},"modified":"2014-05-16T16:15:59","modified_gmt":"2014-05-16T13:15:59","slug":"erdemirin-2-galvanizleme-hatti-ced-sureci-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erdemirin-2-galvanizleme-hatti-ced-sureci-basladi\/","title":{"rendered":"(Turkish) Erdemir`in 2.Galvanizleme Hatt\u0131 \u00c7ED S\u00fcreci Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26612\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Ere\u011fli Demir ve \u00c7elik Fabrikalar\u0131 T.A.\u015e. `in 2.Galvanizleme Hatt\u0131 projesi ile ilgili \u00c7ED s\u00fcreci ba\u015flad\u0131 ve halk\u0131n g\u00f6r\u00fc\u015f\u00fcne a\u00e7\u0131ld\u0131.<\/strong><\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi \u0130zin ve Denetim Genel M\u00fcd\u00fcrl\u00fc\u011f\u00fcn\u00fcn internet sitesinde yap\u0131lan a\u00e7\u0131klamada Zonguldak ili <a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/erdemir.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-26613\" title=\"erdemir\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/erdemir.jpg\" alt=\"\" width=\"300\" height=\"214\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/erdemir.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/erdemir-70x50.jpg 70w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Uzunkum Caddesi mevkiinde Ere\u011fli Demir ve \u00c7elik Fabrikalar\u0131 T.A.\u015e. taraf\u0131ndan yap\u0131lmas\u0131 planlanan 2. Galvanizleme Hatt\u0131 projesi ile ilgili olarak Bakanl\u0131\u011fa sunulan \u00c7ED Ba\u015fvuru Dosyas\u0131 incelenip uygun bulunarak projeye ili\u015fkin \u00c7ED S\u00fcrecinin ba\u015flad\u0131\u011f\u0131 ve halk\u0131n g\u00f6r\u00fc\u015f\u00fcne a\u00e7\u0131ld\u0131\u011f\u0131 duyuruldu.<\/p>\n<p>\u00c7evresel Etki De\u011ferlendirmesi s\u00fcreci tamamlanana kadar s\u00fcre\u00e7 ile ilgili her t\u00fcrl\u00fc bilgiler ve projeye ili\u015fkin g\u00f6r\u00fc\u015f, soru ve \u00f6neriler ZONGULDAK Valili\u011fine (\u00c7evre ve \u015eehircilik \u0130l M\u00fcd\u00fcrl\u00fc\u011f\u00fc) veya \u00c7evre ve \u015eehircilik Bakanl\u0131\u011f\u0131na g\u00f6nderilebilecek.<\/p>\n<p>Kaynak: Enerji G\u00fcnl\u00fc\u011f\u00fc<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Ere\u011fli Demir ve \u00c7elik Fabrikalar\u0131 T.A.\u015e. `in 2.Galvanizleme Hatt\u0131 projesi ile ilgili \u00c7ED s\u00fcreci ba\u015flad\u0131 ve halk\u0131n g\u00f6r\u00fc\u015f\u00fcne a\u00e7\u0131ld\u0131. \u00c7evresel Etki De\u011ferlendirmesi \u0130zin [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26613,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53],"tags":[15045,5927,15046,15044,2841],"views":695,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26612"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26612"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26612\/revisions"}],"predecessor-version":[{"id":26614,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26612\/revisions\/26614"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26613"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26612"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26612"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26612"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}