{"id":26303,"date":"2014-05-11T22:37:27","date_gmt":"2014-05-11T19:37:27","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26303"},"modified":"2014-05-11T22:38:10","modified_gmt":"2014-05-11T19:38:10","slug":"gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek\/","title":{"rendered":"(Turkish) G\u00fcne\u015f Enerjisinde \u0130lk Yar\u0131\u015fma Erzurum ve Elaz\u0131\u011f \u0130\u00e7in D\u00fczenlenecek&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26303\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>T\u00fcrkiye\u2019nin ilk lisansl\u0131 g\u00fcne\u015f enerjisinden\u00a0elektrik \u00fcretimi ihalesi\u00a012 May\u0131s Pazartesi g\u00fcn\u00fc ger\u00e7ekle\u015ftirilecek. TE\u0130A\u015e taraf\u0131ndan ger\u00e7ekle\u015ftirilecek ihalenin 1.paketi Erzurum ve Elaz\u0131\u011f i\u00e7in ger\u00e7ekle\u015ftirilecek. \u015e\u0131rnak b\u00f6lgesi i\u00e7in sadece Park Teknik ba\u015fvuru yapt\u0131\u011f\u0131 i\u00e7in bu b\u00f6lgeye y\u00f6nelik yar\u0131\u015fma yap\u0131lmayacak.<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-26304\" title=\"gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek-300x208.jpg\" alt=\"\" width=\"300\" height=\"208\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek-300x208.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek-500x347.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek-71x50.jpg 71w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/gunes-enerjisinde-ilk-yarisma-12-mayista-erzurum-ve-elazig-icin-duzenlenecek.jpg 619w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><\/p>\n<p>\u0130halede Elaz\u0131\u011f b\u00f6lgesindeki 8 megavatl\u0131k kapasite i\u00e7in 5, Erzurum b\u00f6lgesindeki 5 megavatl\u0131k kapasite i\u00e7in 2 firma yar\u0131\u015facak. \u0130haleye kat\u0131lacak firmalar \u015f\u00f6yle:<\/p>\n<p>Mevzuat gere\u011fi, g\u00fcne\u015f enerjisine dayal\u0131 \u00fcretim tesisi kurmak \u00fczere yap\u0131lm\u0131\u015f \u00f6n lisans ba\u015fvurular\u0131ndan ayn\u0131 sahada, ayn\u0131 ba\u011flant\u0131 noktas\u0131na, ayn\u0131 ba\u011flant\u0131 b\u00f6lgesine ba\u011flanmak i\u00e7in birden fazla ba\u015fvurunun bulunmas\u0131 durumunda, sisteme ba\u011flanacak olan\u0131 belirlemek i\u00e7in T\u00fcrkiye Elektrik \u0130letim A\u015e (TE\u0130A\u015e) taraf\u0131ndan yar\u0131\u015fma yap\u0131lacak.<\/p>\n<p>Yar\u0131\u015fmaya kat\u0131lan \u015firketler, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere en fazla 3 y\u0131l i\u00e7erisinde birim megavat ba\u015f\u0131na TE\u0130A\u015e\u2019a katk\u0131 pay\u0131 \u00f6deme taahh\u00fcd\u00fcnde bulunacak. Kesi\u015fen projeler olmas\u0131 durumunda daha y\u00fcksek katk\u0131 pay\u0131 teklifi veren proje sahibi \u015firket, kesi\u015fen alan\u0131 kullanma hakk\u0131n\u0131 elde edecek.<\/p>\n<p>\u015eirket, katk\u0131 pay\u0131 tutar\u0131n\u0131, \u00fcretim tesisinin ilk \u00fcnitesinin ge\u00e7ici kabul\u00fcn\u00fcn yap\u0131ld\u0131\u011f\u0131 tarihten ba\u015flamak \u00fczere 3 y\u0131l i\u00e7erisinde ve y\u0131ll\u0131k e\u015fit taksitler \u015feklinde TE\u0130A\u015e\u2019a \u00f6deyecek.<\/p>\n<p><a href=\"http:\/\/goo.gl\/g9UGtk\" rel=\"nofollow\" target=\"_blank\"><strong>TE\u0130A\u015e GES 1.paket ihalesi duyurusu i\u00e7in TIKLAYINIZ &gt;&gt;<\/strong><\/a><\/p>\n<p><img loading=\"lazy\" src=\"http:\/\/static.enerjienstitusu.com\/wp-content\/uploads\/teias-gunes-enerjisi-ihalesi-12-mayis-elazig-erzurum-sirnak.jpg\" alt=\"teias gunes enerjisi ihalesi 12 mayis elazig erzurum sirnak\" width=\"664\" height=\"408\" \/><\/p>\n<p>Kaynak: <a href=\"http:\/\/enerjienstitusu.com\/2014\/05\/10\/turkiyenin-ilk-lisansli-gunes-solar-enerji-ihalesi-teias\/\" target=\"_blank\">Enerji Enstit\u00fcs\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.T\u00fcrkiye\u2019nin ilk lisansl\u0131 g\u00fcne\u015f enerjisinden\u00a0elektrik \u00fcretimi ihalesi\u00a012 May\u0131s Pazartesi g\u00fcn\u00fc ger\u00e7ekle\u015ftirilecek. TE\u0130A\u015e taraf\u0131ndan ger\u00e7ekle\u015ftirilecek ihalenin 1.paketi Erzurum ve Elaz\u0131\u011f i\u00e7in ger\u00e7ekle\u015ftirilecek. \u015e\u0131rnak b\u00f6lgesi [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26304,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[1964,4249,14847,19,63,67,1009,165,7708,14848,227,13,13593,14849,14850,14851,14852,14853,1582,14854,3479,1142,105],"views":1159,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26303"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26303"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26303\/revisions"}],"predecessor-version":[{"id":26306,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26303\/revisions\/26306"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26304"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26303"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26303"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26303"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}