{"id":26280,"date":"2014-05-11T13:53:54","date_gmt":"2014-05-11T10:53:54","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=26280"},"modified":"2014-05-11T13:53:54","modified_gmt":"2014-05-11T10:53:54","slug":"siemens-kanadaya-140-ruzgar-turbini-saglayacak","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/siemens-kanadaya-140-ruzgar-turbini-saglayacak\/","title":{"rendered":"(Turkish) Siemens, Kanada`ya 140 R\u00fczgar T\u00fcrbini Sa\u011flayacak&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/26280\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-26281\" title=\"siemens-kanadaya-140-ruzgar-turbini-saglayacak\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak-300x207.jpg\" alt=\"\" width=\"300\" height=\"207\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak-300x207.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak-500x346.jpg 500w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak-72x50.jpg 72w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/05\/siemens-kanadaya-140-ruzgar-turbini-saglayacak.jpg 573w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Siemens, Kanada`n\u0131n Ontario b\u00f6lgesinde kurulacak K2 r\u00fczgar santrali i\u00e7in 140 adet r\u00fczgar t\u00fcrbini sa\u011flayacak. Siemens, Kanada`n\u0131n Ontario b\u00f6lgesinde kurulacak K2 r\u00fczgar santrali i\u00e7in 140 adet SWT 2.3-101 model t\u00fcrbin sa\u011flamak i\u00e7in anla\u015fma yapt\u0131. Yap\u0131lan anla\u015fma, t\u00fcrbinlerin bak\u0131m\u0131n\u0131n da Siemens taraf\u0131ndan yap\u0131lmas\u0131n\u0131 \u00f6ng\u00f6r\u00fcyor.<\/strong><\/p>\n<p>Samsung Electronics Co\u2019nun yenilenebilir enerji birimi olan Capital Power LP ve Alman Pattern Energy Group \u0130nc. (PEGI) \u015firketlerinin sahibi oldu\u011fu 270 MW K2 R\u00fczgar Ontario projesinde 2015 y\u0131l\u0131n\u0131n ortalar\u0131nda elektrik \u00fcretiminin ba\u015flamas\u0131 bekleniyor. Santralin yakla\u015f\u0131k 100 bin evin elektrik ihtiyac\u0131n\u0131n kar\u015f\u0131lamas\u0131 \u00f6ng\u00f6r\u00fcl\u00fcyor.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/siemens-kanadaya-140-ruzgar-turbini-saglayacak_8435.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Siemens, Kanada`n\u0131n Ontario b\u00f6lgesinde kurulacak K2 r\u00fczgar santrali i\u00e7in 140 adet r\u00fczgar t\u00fcrbini sa\u011flayacak. Siemens, Kanada`n\u0131n Ontario b\u00f6lgesinde kurulacak K2 r\u00fczgar santrali i\u00e7in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26281,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[14830,14829,19,63,67,1009,165,1928,14831,474,69,16,231,324,14827,1053,14828],"views":930,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26280"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=26280"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26280\/revisions"}],"predecessor-version":[{"id":26282,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/26280\/revisions\/26282"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/26281"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=26280"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=26280"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=26280"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}