{"id":25692,"date":"2014-04-24T15:32:59","date_gmt":"2014-04-24T12:32:59","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25692"},"modified":"2014-04-24T18:09:47","modified_gmt":"2014-04-24T15:09:47","slug":"bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi-2","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi-2\/","title":{"rendered":"(Turkish) Bu Y\u0131l\u0131n \u0130lk 3 Ay\u0131nda 53 Yeni Santral Elektrik \u00dcretimine Ba\u015flad\u0131!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25692\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong><a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi.jpg\"><img loading=\"lazy\" class=\"alignright size-medium wp-image-25668\" title=\"WEATHER-FRANCE\/\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi-300x204.jpg\" alt=\"\" width=\"300\" height=\"204\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi-300x204.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/bu-yilin-ilk-3-ayinda-53-yeni-santral-elektrik-uretimine-basladi.jpg 459w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>Bu y\u0131l\u0131n ilk 3 ay\u0131nda 30 ilde 650 megavat kurulu g\u00fcce sahip 53 santral elektrik \u00fcretimine ba\u015flad\u0131. T\u00fcrkiye\u2019nin elektrik \u00fcretimindeki kurulu g\u00fcc\u00fc 64 bin 612 megavata ula\u015ft\u0131.<\/strong><\/p>\n<p>Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131 verilerine g\u00f6re, enerjide arz g\u00fcvenli\u011fini sa\u011flamak ve yerli kaynak kullan\u0131m\u0131n\u0131 art\u0131rmay\u0131 hedefleyen T\u00fcrkiye\u2019de, y\u0131l\u0131n ilk \u00e7eyre\u011finde yeni enerji yat\u0131r\u0131mlar\u0131 devreye girdi.<\/p>\n<p>Buna g\u00f6re y\u0131l\u0131n ilk 3 ay\u0131nda 53 yeni elektrik santrali \u00fcretime ba\u015flad\u0131. B\u00f6ylece T\u00fcrkiye\u2019nin kurulu g\u00fcc\u00fcne 650,80 megavatl\u0131k ilave oldu. B\u00f6ylece T\u00fcrkiye\u2019nin toplam kurulu g\u00fcc\u00fc 64 bin 612 megavata ula\u015ft\u0131.<\/p>\n<p>T\u00fcrkiye\u2019nin elektrik kurulu g\u00fcc\u00fcnde ge\u00e7en y\u0131l\u0131n mart ay\u0131 sonundaki kurulu g\u00fcce oranla y\u00fczde 12\u2032lik art\u0131\u015f ger\u00e7ekle\u015fti.<\/p>\n<p>Bu y\u0131l devreye al\u0131nan santrallerin 27\u2032si hidroelektrik santrallerinden (HES), 14\u2032\u00fc r\u00fczgar enerjisi santrallerinden (RES), 8\u2032i do\u011falgaz santrallerinden olu\u015fuyor.<\/p>\n<p>Santrallerin 21\u2032i ocak, 20\u2032si \u015fubat, 12\u2032si mart ay\u0131nda \u00fcretime ge\u00e7ti.<\/p>\n<p>Kaynak:\u00a0<a title=\"sabah\" href=\"http:\/\/www.sabah.com.tr\/Ekonomi\/2014\/04\/23\/turkiyeye-53-yeni-santral\" rel=\"nofollow\" target=\"_blank\">sabah<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Bu y\u0131l\u0131n ilk 3 ay\u0131nda 30 ilde 650 megavat kurulu g\u00fcce sahip 53 santral elektrik \u00fcretimine ba\u015flad\u0131. T\u00fcrkiye\u2019nin elektrik \u00fcretimindeki kurulu g\u00fcc\u00fc 64 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25693,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[51,53,47],"tags":[19,1866,35370],"views":766,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25692"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25692"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25692\/revisions"}],"predecessor-version":[{"id":25695,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25692\/revisions\/25695"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25693"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25692"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25692"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25692"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}