{"id":25607,"date":"2014-04-22T11:32:19","date_gmt":"2014-04-22T08:32:19","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25607"},"modified":"2014-04-22T11:32:19","modified_gmt":"2014-04-22T08:32:19","slug":"dubai-100-mwlik-gunes-enerjisi-ihalesi-acti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti\/","title":{"rendered":"(Turkish) Dubai 100 MW&#8217;l\u0131k G\u00fcne\u015f Enerjisi \u0130halesi A\u00e7t\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25607\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Dubai&#8217;de 100 MW&#8217;l<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti.jpg\"><img loading=\"lazy\" class=\"size-medium wp-image-25608 alignright\" title=\"dubai-100-mwlik-gunes-enerjisi-ihalesi-acti\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti-300x233.jpg\" alt=\"\" width=\"300\" height=\"233\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti-300x233.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti-64x50.jpg 64w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti.jpg 321w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>\u0131k bir g\u00fcne\u015f enerjisi santrali ihalesi a\u00e7\u0131ld\u0131\u011f\u0131 bildirildi. 6 Nisan&#8217;da duyurusu yap\u0131lan ihale i\u00e7in son ba\u015fvuru tarihi ise 24 Nisan&#8230;<\/strong><\/p>\n<p>Dubai Elektrik ve Su \u0130daresi taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada, ihaleye \u015firketlerin tek ba\u015flar\u0131na veya bir konsorsiyum ile kat\u0131labilecekleri bildirildi. A\u00e7\u0131klamada \u015firketlerin Muhammed bin Re\u015fit El-Maktum G\u00fcne\u015f Tarlas\u0131&#8217;nda yer alacak proje veya projelerini 2017 yaz\u0131ndan \u00f6nce devreye almas\u0131 gerekecek. \u015eirketler kurulacak santrallerde hisse sahibi olacak iken, idare ayn\u0131 zamanda burada \u00fcretilecek elektrik i\u00e7in al\u0131m garantisi sa\u011flayacak.<\/p>\n<p><strong>Haberin <a href=\"http:\/\/www.yesilekonomi.com\/finans\/dubai-100-mwlik-gunes-enerjisi-ihalesi-acti\" target=\"_blank\">Devam\u0131 \u0130\u00e7in TIKLAYIN&gt;&gt;<\/a><\/strong><\/p>\n<p>Kaynak: Ye\u015fil Ekonomi<\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Dubai&#8217;de 100 MW&#8217;l\u0131k bir g\u00fcne\u015f enerjisi santrali ihalesi a\u00e7\u0131ld\u0131\u011f\u0131 bildirildi. 6 Nisan&#8217;da duyurusu yap\u0131lan ihale i\u00e7in son ba\u015fvuru tarihi ise 24 Nisan&#8230; Dubai [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25608,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,49],"tags":[9827,63,67,1009,165,2326,227,13,13593,2569,14414],"views":863,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25607"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25607"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25607\/revisions"}],"predecessor-version":[{"id":25609,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25607\/revisions\/25609"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25608"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25607"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25607"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25607"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}