{"id":25594,"date":"2014-04-22T10:27:44","date_gmt":"2014-04-22T07:27:44","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25594"},"modified":"2014-04-22T10:27:44","modified_gmt":"2014-04-22T07:27:44","slug":"erzin-dogalgaz-cevrim-santrali-uretime-basladi","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/erzin-dogalgaz-cevrim-santrali-uretime-basladi\/","title":{"rendered":"(Turkish) Erzin Do\u011falgaz \u00c7evrim Santrali \u00dcretime Ba\u015flad\u0131&#8230;"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25594\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Akenerji taraf\u0131ndan Hatay`\u0131n Erzin il\u00e7esinde Burnaz sahiline yap\u0131lan do\u011falgaz kombine \u00e7evrim santrali, elektrik \u00fcretimine ba\u015flad\u0131. 2011 y\u0131l\u0131 aral\u0131k ay\u0131nda Akenerji taraf\u0131ndan yap\u0131m\u0131na ba\u015flanan Erzin Do\u011fal Kombine \u00c7evrim Santrali 29 ay sonra tamamlanarak elektrik \u00fcretimine ba\u015flad\u0131. Santralin 1 numaral\u0131 gaz t\u00fcrbin \u00fcnitesi, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nca g\u00f6revlendirilen yetkililer ile \u015firket ve m\u00fcteahhit firma yetkililerinin kat\u0131l\u0131m\u0131yla ge\u00e7ici kabul i\u015flemleri yap\u0131ld\u0131.<\/strong><\/p>\n<p>T\u00fcrkiye\u2019de ihtiya\u00e7 duyulan elektrik \u00fcretiminin y\u00fczde 2,6\u2019s\u0131n\u0131 \u00fcretecek \u00e7evrim santrali, di\u011fer \u00fcnitelerinin de faaliyete ge\u00e7mesi ile birlikte \u00fclkenin enerji ihtiyac\u0131n\u0131n \u00f6nemli bir b\u00f6l\u00fcm\u00fcn\u00fc kar\u015f\u0131layacak. Santralin \u00fcretime ba\u015flayan \u00fcnitesi 297 mwm ve 292 mwe g\u00fcc\u00fcnde.<\/p>\n<p><strong>\u0130NSAN SA\u011eLI\u011eI \u00d6N PLANDA<\/strong><br \/>\nDo\u011falgaz \u00e7evrim santrallerinin bak<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/erzin-ogalgaz-cevrim-santrali-uretime-basladi.jpg\"><img loading=\"lazy\" class=\"alignleft size-medium wp-image-25595\" title=\"erzin-ogalgaz-cevrim-santrali-uretime-basladi\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/erzin-ogalgaz-cevrim-santrali-uretime-basladi-300x203.jpg\" alt=\"\" width=\"300\" height=\"203\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/erzin-ogalgaz-cevrim-santrali-uretime-basladi-300x203.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/erzin-ogalgaz-cevrim-santrali-uretime-basladi-73x50.jpg 73w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/erzin-ogalgaz-cevrim-santrali-uretime-basladi.jpg 413w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a>anl\u0131k\u00e7a belirtilen \u015fartnamelere harfiyen uyduklar\u0131n\u0131 belirten y\u00fcklenici firma Egemer Elektrik \u00dcretim A\u015e`nin Genel M\u00fcd\u00fcr\u00fc Serhan Gencer, firma olarak insan sa\u011fl\u0131\u011f\u0131 unsurunu birinci planda tuttuklar\u0131n\u0131 s\u00f6yledi.<\/p>\n<p>Santrallerin yap\u0131m\u0131na &#8220;Biz Kocaman Bir Aileyiz&#8220; slogan\u0131 ile ba\u015flad\u0131klar\u0131n\u0131 s\u00f6yleyen Serhan Gencer, in\u015faat alan\u0131na ilk kazman\u0131n vuruldu\u011fu g\u00fcnden bug\u00fcne kadar b\u00f6lgede binlerce ki\u015fiye i\u015f kap\u0131s\u0131 olduklar\u0131n\u0131 hat\u0131rlatt\u0131.<\/p>\n<p>\u0130l\u00e7e esnaf\u0131n\u0131n yan\u0131 s\u0131ra b\u00f6lgede bulunan bir\u00e7ok i\u015fletmenin de hareketlenmesini sa\u011flad\u0131klar\u0131n\u0131 vurgulayan Gencer, santralin il\u00e7e ve b\u00f6lge ekonomisinde lokomotif g\u00f6revi g\u00f6rd\u00fc\u011f\u00fcn\u00fc kaydetti.<\/p>\n<p><strong>T\u00dcM KR\u0130TERLER YER\u0130NE GET\u0130R\u0130LD\u0130<\/strong><br \/>\nAkenerji taraf\u0131ndan yap\u0131lan a\u00e7\u0131klamada ise &#8221; D\u00fcnya \u00c7evre \u00d6rg\u00fctleri taraf\u0131ndan onaylanan ve t\u00fcm \u00e7evre kriterlerinin ortak g\u00f6r\u00fc\u015f\u00fc olarak bilinen do\u011falgaz ile \u00e7al\u0131\u015facak olan Erzin Do\u011falgaz Kombine \u00c7evrim Santrali, Enerji ve Tabii Kaynaklar Bakanl\u0131\u011f\u0131nca belirtilen t\u00fcm kriterleri yerine getirerek, resmen ticari \u00fcretime ba\u015flad\u0131.&#8221; \u00a0denildi.<\/p>\n<p>Kaynak: <a href=\"http:\/\/www.enerjigunlugu.net\/erzin-dogalgaz-cevrim-santrali-uretime-basladi_8128.html\" target=\"_blank\">Enerji G\u00fcnl\u00fc\u011f\u00fc<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Akenerji taraf\u0131ndan Hatay`\u0131n Erzin il\u00e7esinde Burnaz sahiline yap\u0131lan do\u011falgaz kombine \u00e7evrim santrali, elektrik \u00fcretimine ba\u015flad\u0131. 2011 y\u0131l\u0131 aral\u0131k ay\u0131nda Akenerji taraf\u0131ndan yap\u0131m\u0131na ba\u015flanan [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25595,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[46,53],"tags":[3762,92,226,3761,14408,19,63,67,1009,165,7748,5630,14409],"views":1119,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25594"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25594"}],"version-history":[{"count":2,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25594\/revisions"}],"predecessor-version":[{"id":25597,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25594\/revisions\/25597"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25595"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25594"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25594"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25594"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}