{"id":25536,"date":"2014-04-21T03:56:51","date_gmt":"2014-04-21T00:56:51","guid":{"rendered":"https:\/\/www.enerjigazetesi.ist\/?p=25536"},"modified":"2014-04-21T03:56:51","modified_gmt":"2014-04-21T00:56:51","slug":"lisanssiz-ruzgarda-ilk-kurulum-gerceklesti","status":"publish","type":"post","link":"https:\/\/www.enerjigazetesi.ist\/en\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti\/","title":{"rendered":"(Turkish) Lisanss\u0131z R\u00fczgarda \u0130lk Kurulum Ger\u00e7ekle\u015fti!"},"content":{"rendered":"<p class=\"qtranxs-available-languages-message qtranxs-available-languages-message-en\">Sorry, this entry is only available in <a href=\"https:\/\/www.enerjigazetesi.ist\/tr\/wp-json\/wp\/v2\/posts\/25536\" class=\"qtranxs-available-language-link qtranxs-available-language-link-tr\" title=\"Turkish\">Turkish<\/a>. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.<\/p><p><strong>Lisanss\u0131z elektrik \u00fcretim sekt\u00f6r\u00fcnde ilk r\u00fczgar t\u00fcrbini devreye al\u0131nd\u0131. \u0130lk kez 2008\u2019de kanunla\u015fan fakat gerekli y\u00f6netmeliklerin, uygulama tebli\u011flerinin ve kurumlar aras\u0131 protokollerin k\u0131sa zaman \u00f6nce tamamland\u0131\u011f\u0131 lisanss\u0131z elektrik \u00fcretim sekt\u00f6r\u00fcnde ilk r\u00fczgar t\u00fcrbini devreye al\u0131nd\u0131. Ge\u00e7en zaman i\u00e7erisinde g\u00fcne\u015f enerjisi alan\u0131nda onlarca santral kurulsa da r\u00fczgarda projelerin ger\u00e7ekle\u015fmemesi dikkat \u00e7ekiyordu.<\/strong><\/p>\n<p>\u00c7anakkale Ezine\u2019de y\u00f6netmeli\u011fin b\u00fct\u00fcn ko\u015fullar\u0131na uygun 250 kW g\u00fcc\u00fcnde bir r\u00fczgar t\u00fcrbininin TEDA\u015e ve UEDA\u015e yetkilileri nezaretinde devreye alma testleri ge\u00e7en hafta ba\u015far\u0131yla sonu\u00e7land\u0131.<\/p>\n<p><strong>RASP\u0130M ZORLU\u011eU GEC\u0130KME NEDEN\u0130<a href=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti.jpg\"><img loading=\"lazy\" class=\"alignright  wp-image-25537\" title=\"lisanssiz-ruzgarda-ilk-kurulum-gerceklesti\" src=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti-300x194.jpg\" alt=\"\" width=\"300\" height=\"194\" srcset=\"https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti-300x194.jpg 300w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti-76x50.jpg 76w, https:\/\/www.enerjigazetesi.ist\/wp-content\/uploads\/2014\/04\/lisanssiz-ruzgarda-ilk-kurulum-gerceklesti.jpg 448w\" sizes=\"(max-width: 300px) 100vw, 300px\" \/><\/a><\/strong><br \/>\nKurulumu ger\u00e7ekle\u015fen t\u00fcrbinin \u00fcreticisi AYETEK bu kurulumla bir ilke imza atm\u0131\u015f oldu. \u015eirket yetkililerine g\u00f6re gecikmelerin en \u00f6nemli sebeplerinin aras\u0131nda RAPS\u0130M zorunlulu\u011fu yer al\u0131yor. Gerekli y\u00f6netmeliklerin son \u015fekliyle 2 Ekim 2013 tarihinde yay\u0131mlanmas\u0131na ra\u011fmen r\u00fczgar t\u00fcrbinlerinin ulusal g\u00fcvenli\u011fimiz i\u00e7in son derece \u00f6nemli olan radarlar\u0131 ne derecede etkileyece\u011fi tart\u0131\u015fma konusu olmu\u015ftu. Ara\u015ft\u0131rmalar neticesinde 60 metreden y\u00fcksek r\u00fczgar t\u00fcrbinlerine, almas\u0131 \u00e7ok zor olan ve hayli zaman alan, Teknik Etkile\u015fim Analizi zorunlulu\u011fu getirildi. Arz edilen bir\u00e7ok t\u00fcrbinin 60 metreden y\u00fcksek olmas\u0131ndan dolay\u0131 yat\u0131r\u0131mlar ger\u00e7ekle\u015femedi.<\/p>\n<p><strong>YATIRIM YAPARKEN D\u0130KKAT<\/strong><br \/>\n\u015eirketin kurucu ortaklar\u0131ndan Abdullah \u00d6zel gecikmelerle ilgili \u015fu ifadeleri kulland\u0131:\u201dRAPS\u0130M zorunlulu\u011fu yan\u0131 s\u0131ra en \u00f6nemli sebep kanunlara uygun r\u00fczgar t\u00fcrbin \u00fcreticilerinin yoklu\u011fudur. Y\u00f6netmeli\u011fe g\u00f6re \u015febekeye ba\u011flanacak olan her r\u00fczgar t\u00fcrbininin Tip Test Sertifikas\u0131 olmak zorundad\u0131r. Bug\u00fcn, y\u00fcksekli\u011fi 60 metreden d\u00fc\u015f\u00fck olan ve Tip Test Sertifikas\u0131 olan AYETEK d\u0131\u015f\u0131nda hi\u00e7bir \u00fcretici yoktur\u201d.<\/p>\n<p>Abdullah \u00d6zel lisanss\u0131z r\u00fczgar enerji sekt\u00f6r\u00fcnde yat\u0131r\u0131m yaparken dikkat edilmesi gerekenleri \u015f\u00f6yle ifade etti:\u201dHer ne kadar y\u00f6netmelik ilk bak\u0131\u015fta 1 MW g\u00fcc\u00fcndeki t\u00fcrbinler i\u00e7in elveri\u015fli g\u00f6r\u00fcnse de arz ve uygulanabilirlik bak\u0131m\u0131ndan 250 kW g\u00fcc\u00fcndeki r\u00fczgar t\u00fcrbinlerinin d\u0131\u015f\u0131nda yat\u0131r\u0131m imkan\u0131 sa\u011fl\u0131kl\u0131 g\u00f6r\u00fcnm\u00fcyor. Daha b\u00fcy\u00fck \u00f6l\u00e7ekli t\u00fcrbinler RAPS\u0130M engeline tak\u0131ld\u0131klar\u0131 gibi Uzak Do\u011fu \u00fclkeleri d\u0131\u015f\u0131nda alternatif kalm\u0131yor. Bu durumda da kalite ba\u015fta olmak \u00fczere, t\u00fcrbinlerin ikinci el olma riski, bak\u0131m\/onar\u0131m faaliyetlerinin yoklu\u011fu ve yedek par\u00e7a arz g\u00fcvenli\u011fi gibi bir\u00e7ok zorluk yat\u0131r\u0131mc\u0131lar\u0131n kar\u015f\u0131s\u0131na \u00e7\u0131k\u0131yor.<\/p>\n<p>R\u00fczgar t\u00fcrbini yat\u0131r\u0131m\u0131 yaparken kendini kan\u0131tlam\u0131\u015f teknolojinin yan\u0131 s\u0131ra, T\u00fcrkiye ve Avrupa\u2019da tedarik a\u011f\u0131n\u0131n haz\u0131r olmas\u0131, bak\u0131m\/onar\u0131m deneyimi, teknik ekibin ve \u00fcretim altyap\u0131s\u0131n\u0131n varl\u0131\u011f\u0131 \u00f6nemli kriterler aras\u0131nda. AYETEK olarak b\u00fct\u00fcn bu kriterlere uyman\u0131n hakl\u0131 gururunu ya\u015f\u0131yoruz. Daha d\u00fcne kadar Tip Test Sertifikalar\u0131 olmad\u0131\u011f\u0131 halde ve AR-GE a\u015famas\u0131nda olan 100 Kw\u2019l\u0131k r\u00fczgar t\u00fcrbinlerini 250 kW olarak satan veya olmayan sertifikalar\u0131 varm\u0131\u015f gibi g\u00f6sterip r\u00fczgar t\u00fcrbini satan yerli \u00fcreticiler vard\u0131. Yat\u0131r\u0131mc\u0131lar\u0131n g\u00fcn ge\u00e7tik\u00e7e bilin\u00e7lendiklerini ve bu t\u00fcr \u015firketlere meydan vermediklerini g\u00f6rmek bizi son derece mutlu ediyor\u201d.<\/p>\n<p><strong>ANKARA\u2019YA TE\u015eEKK\u00dcRLER<\/strong><br \/>\nHukuki altyap\u0131n\u0131n \u015fekillenmesi uzun y\u0131llar almas\u0131na ra\u011fmen AYETEK yetkilileri s\u00fcre\u00e7ten memnuniyetlerini ifade ettiler. \u015eirketin di\u011fer kurucu orta\u011f\u0131 Ekrem Kara\u00e7al\u0131: \u201cSekt\u00f6r\u00fcn \u015fekillenmesi uzun s\u00fcrse de gelinen noktada Avrupa\u2019n\u0131n en sa\u011fl\u0131kl\u0131 ve s\u00fcrd\u00fcr\u00fclebilir te\u015fvik sistemine sahip oldu\u011fumuzu g\u00f6rmezden gelemeyiz. Avrupa\u2019dan geldi\u011fimiz i\u00e7in s\u00fcre\u00e7 i\u00e7erisinde insanlar bizi, T\u00fcrkiye\u2019de kanunlara dayal\u0131 yat\u0131r\u0131m yapman\u0131n mant\u0131ks\u0131z oldu\u011fu konusunda, bir\u00e7ok kez uyarma ihtiyac\u0131 hissettiler. Fakat 2008?den beri devletin \u00e7ok istikrarl\u0131 bir yol izledi\u011fini vurgulamak laz\u0131m. Gelinen noktada \u00fcretilen elektri\u011fe sat\u0131n alma garantisi vererek yat\u0131r\u0131mlar kolayla\u015ft\u0131r\u0131l\u0131yor, yerli \u00fcretim \u00f6d\u00fcllendirilerek te\u015fvik ediliyor ve Tip Test Sertifikas\u0131 konusundaki hassasiyet sayesinde T\u00fcrkiye\u2019nin bir r\u00fczgar t\u00fcrbini \u00e7\u00f6pl\u00fc\u011f\u00fcne d\u00f6n\u00fc\u015fmesinin \u00f6n\u00fcne ge\u00e7iliyor. Elektrik konusundaki d\u0131\u015fa ba\u011f\u0131ml\u0131l\u0131\u011f\u0131m\u0131z\u0131 ve cari a\u00e7\u0131klar\u0131m\u0131z\u0131 g\u00f6z \u00f6n\u00fcnde bulundurdu\u011fumuzda Ankara taraf\u0131ndan \u00e7ok isabetli kararlar\u0131n al\u0131nd\u0131\u011f\u0131n\u0131 g\u00f6r\u00fcyoruz. Bunun i\u00e7in eme\u011fi ge\u00e7en b\u00fct\u00fcn kuru lara ve yetkililere sonsuz te\u015fekk\u00fcr ederiz\u201d ifadelerini kulland\u0131.<\/p>\n<p><strong>SIRA BANKA VE F\u0130NANS KURUMLARINDA<\/strong><br \/>\nHukuki s\u00fcre\u00e7 gibi banka ve finans kurumlar\u0131n\u0131n sekt\u00f6re adaptasyon yapmakta zorland\u0131klar\u0131n\u0131 ve yava\u015f ilerlediklerini belirten Kara\u00e7al\u0131 en k\u0131sa zamanda ve en erken adaptasyon yapan kurumlar\u0131n \u00f6nemli bir rekabet avantaj\u0131 elde edeceklerini vurgulad\u0131 ve AYETEK olarak Avrupa deneyimlerini de payla\u015farak bu t\u00fcr kurumlara destek vermeye haz\u0131r olduklar\u0131n\u0131 ifade etti.<\/p>\n<p>Yay\u0131nc\u0131: <a href=\"https:\/\/www.enerjigazetesi.ist\" target=\"_blank\">Enerji Gazetesi<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>Sorry, this entry is only available in Turkish. For the sake of viewer convenience, the content is shown below in the alternative language. You may click the link to switch the active language.Lisanss\u0131z elektrik \u00fcretim sekt\u00f6r\u00fcnde ilk r\u00fczgar t\u00fcrbini devreye al\u0131nd\u0131. \u0130lk kez 2008\u2019de kanunla\u015fan fakat gerekli y\u00f6netmeliklerin, uygulama tebli\u011flerinin ve kurumlar aras\u0131 protokollerin k\u0131sa [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":25537,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[53,50],"tags":[14371,4326,4329,63,67,1009,165,14370,14372,14373,69,16,324],"views":870,"_links":{"self":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25536"}],"collection":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/comments?post=25536"}],"version-history":[{"count":1,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25536\/revisions"}],"predecessor-version":[{"id":25538,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/posts\/25536\/revisions\/25538"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media\/25537"}],"wp:attachment":[{"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/media?parent=25536"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/categories?post=25536"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.enerjigazetesi.ist\/en\/wp-json\/wp\/v2\/tags?post=25536"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}